802 resultados para Public-Private Partnerships in Education


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis addresses the question of how business schoolsestablished as public privatepartnerships (PPPs) within a regional university in the English-speaking Caribbean survived for over twenty-one years and achieved legitimacy in their environment. The aim of the study was to examine how public and private sector actors contributed to the evolution of the PPPs. A social network perspective provided a broad relational focus from which to explore the phenomenon and engage disciplinary and middle-rangetheories to develop explanations. Legitimacy theory provided an appropriate performance dimension from which to assess PPP success. An embedded multiple-case research design, with three case sites analysed at three levels including the country and university environment, the PPP as a firm and the subgroup level constituted the methodological framing of the research process. The analysis techniques included four methods but relied primarily on discourse and social network analysis of interview data from 40 respondents across the three sites. A staged analysis of the evolution of the firm provided the ‘time and effects’ antecedents which formed the basis for sense-making to arrive at explanations of the public-private relationship-influenced change. A conceptual model guided the study and explanations from the cross-case analysis were used to refine the process model and develop a dynamic framework and set of theoretical propositions that would underpin explanations of PPP success and legitimacy in matched contexts through analytical generalisation. The study found that PPP success was based on different models of collaboration and partner resource contribution that arose from a confluence of variables including the development of shared purpose, private voluntary control in corporate governance mechanisms and boundary spanning leadership. The study contributes a contextual theory that explains how PPPs work and a research agenda of ‘corporate governance as inspiration’ from a sociological perspective of ‘liquid modernity’. Recommendations for policy and management practice were developed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

When deciding to resort to a PPP contract for the provision of a local public service, local governments have to consider the demand risk allocation between the contracting parties. In this article, I investigate the effects of demand risk allocation on the accountability of procuring authorities regarding consumers changing demand, as well as on the cost-reducing effort incentives of the private public-service provider. I show that contracts in which the private provider bears demand risk motivate more the public authority from responding to customer needs. This is due to the fact that consumers are empowered when the private provider bears demand risk, that is, they have the possibility to oust the private provider in case of non-satisfaction with the service provision, which provides procuring authorities with more credibility in side-trading and then more incentives to be responsive. As a consequence, I show that there is a lower matching with consumers' preferences over time when demand risk is on the public authority rather than on the private provider, and this is corroborated in the light of two famous case studies. However, contracts in which the private provider does not bear demand risk motivate more the private provider from investing in cost-reducing efforts. I highlight then a tradeoff in the allocation of demand risk between productive and allocative efficiency. The striking policy implication of this article for local governments would be that the current trend towards a greater resort to contracts where private providers bear little or no demand risk may not be optimal. Local governments should impose demand risk on private providers within PPP contracts when they expect that consumers' preferences over the service provision will change over time.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The objective of the dissertation is to examine organizational responses of public actors to customer requirements which drive the transformation of value networks and promote public-private partnership in the electricity distribution industry and elderly care sectors. The research bridges the concept of offering to value networks where capabilities can be acquired for novel product concepts. The research contributes to recent literature, re-examining theories on interactions of customer requirements and supply management. A critical realist case study approach is applied to this abductive the research which directs to describe causalities in the analyzed phenomena. The presented evidence is based on three sources, which are in-depth interviews, archival analysis and the Delphi method. Service provision requires awareness on technology and functionalities of offering. Moreover, service provision includes interactions of multiple partners, which suggests the importance of the co-operative orientation of actors. According to the findings,portfolio management has a key role when intelligent solutions are implemented in public service provision because its concepts involve a variety of resources from multiple suppliers. However, emergent networks are not functional if they lack leaders who have access to the customer interface, have power to steer networks and a capability to build offerings. Public procurement policies were recognized to focus on a narrow scope in which price is a key factor in decisions. In the future, the public sector has to implement technology strategies and portfolio management, which mean longterm platform development and commitment to partnerships. On the other hand, the service providers should also be more aware of offerings into which their products will be integrated in the future. This requires making the customer’s voice in product development and co-operation in order to increase the interconnectivity of products.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – The purpose of this article is to survey various meanings attached to a public-private partnership (PPP) and related aspects in Western literature, and identify commonalities and differences between them. Additionally, the article intends to critically assess conflicting and overlapping views on contractual and institutional PPPs, their forms and models, and draw insights for transitional economies. Design/methodology/approach – The article contrasts and compares views on PPP meanings, forms and models within Western PPP literature, and also draws comparisons with understanding of partnership aspects in the Russian language sources. The article examines theories underpinning PPPs, builds connections to PPP advantages and drawbacks, and provides critical assessment of net benefits that PPPs may bring along to the society. Findings – The article concludes that future PPP research in transitional countries such as Kazakhstan and Russia, particularly in the area of organisational and power arrangements in partnerships, may delineate new concepts such as government as a guarantor of a PPP project, social significance of a PPP project, and risk management in a country's contextual environment. Practical implications – In transitional countries, in which PPPs are in their infancy, clarification of theoretical positions, and identification of commonalities and differences between meanings attached to the PPP terminology may enable better decisions by researchers and practitioners in their selection and further development of partnerships and related concepts. Originality/value – Research in the field of PPPs in transitional countries such as Russia and Kazakhstan is in its infancy. The paper intends to contribute to the body of knowledge about PPPs by providing detailed account and categorisation of their principal meanings, forms, models, underpinning theories, and drawing insights for future research in transitional countries.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper describes a theoretical model based primarily on transaction costs, for comparing the various tendering mechanisms used for transportation Public-Private Partnership (PPP) projects. In particular, the model contrasts negotiated procedures with the open procedure, as defined by the current European Union legislation on public tendering. The model includes both ex ante transaction costs (borne during the tendering stage) and ex post transaction costs (such as enforcement costs, re-negotiation costs, and costs arising from litigation between partners), explaining the trade-off between them. Generally speaking, it is assumed that the open procedure implies lower transaction costs ex ante, while the negotiated procedure reduces the probability of the appearance of new contingencies not foreseen in the contract, hence diminishing the expected value of transaction costs ex post. Therefore, the balance between ex ante and ex post transaction costs is the main criterion for deciding whether the open or negotiated procedure would be optimal. Notwithstanding, empirical evidence currently exists only on ex ante transaction costs in transportation infrastructure projects. This evidence has shown a relevant difference between the two procedures as far as ex ante costs are concerned, favouring the open procedure. The model developed in this paper also demonstrates that a larger degree of complexity in a contract does not unequivocally favour the use of a negotiated procedure. Only in those cases dealing with very innovative projects, where important dimensions of the quality of the asset or service are not verifiable, may we observe an advantage in favour of the negotiated procedure. The bottom line is that we find it difficult to justify the employment of negotiated procedures in most transportation PPP contracts, especially in the field of roads. Nevertheless, the field remains open for future empirical work and research on the levels of transaction costs borne ex post in PPP contracts, as well as on the probabilities of such costs appearing under any of the procurement procedures.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The current deficit situation of the Spanish airport system suggests the need to manage this in a more efficient and profitable way. One of the possible options is through private management and being able to do this through Public Private Partnerships (PPP). This study analyzes the situation of the sector and its economic importance and the different possibilities for introducing private management in a public company, specifying the situation in the case of airports, presenting the advantages and disadvantages of these possibilities, and aiming at results obtained in other places where it has been applied. It is proposed that the ideal model for the introduction of private management would be through PPP models tailored to each airport, but having common characteristics according to the group they belong to. Finally, we observe that not all airports are commercially attractive, so that the PPP concept does not apply to all of them. In some cases even the operability itself is not viable at all, and that should be considered separately in order to avoid creating a private monopoly while trying to enhance competition among them.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Within 10 years, there could be a severe global shortage in the supply of cocoa, according to industry practitioners and other experts. Due to global population growth and the emergence of a growing global middle class, by 2025 the cocoa crop would need to increase by nearly 50 per cent to keep up with projected demand. A potential shortage of supply is a direct threat to the business model of lead firms – including cocoa grinders and processors, chocolate confectioners, and retail distributors. But these international firms – the ones that will suffer the most if there is a shortage of cocoa supply – are helping create the market failure that is stifling sustainability. Functioning as a two-tiered consolidated oligopoly with a combined market share of approximately 89%, these firms enjoy the largest portion of value capture in the cocoa-chocolate global value chain (GVC). The smallholder cocoa producers, conversely, are trapped in low value-add segments of the GVC. In fact, most smallholder farmers survive on less than $1.00 per day per capita, on average in many cocoa exporting countries. In Ghana - the second largest producer of cocoa in the world - the government has accomplished little to help these smallholders upgrade and make cocoa an attractive sector for the next generation to inherit. The result – both in Ghana and around the world – is a lack of sustainability of the supply of cocoa. Demand is already beginning to outstrip supply. As a result of these underlying circumstances, the United States Agency for International Development (USAID) has posed the following policy question: "Under what conditions could USAID, as a development agency, support and enhance potential public-private partnerships in order to improve the bargaining power (and financial wherewithal) of smallholder organizations and farmers in the context of the global value chain for cocoa in Ghana?"

Relevância:

100.00% 100.00%

Publicador:

Resumo:

There has been private sector involvement in the delivery of public services in the Irish State since its foundation. This involvement was formalised in 1998 when Public Private Partnership (PPP) was officially introduced. Ireland is a latecomer to PPP and, prior to the credit crisis, was seen as a ‘rapid follower’ relying primarily on the UK PPP model in the procurement of infrastructure in transport, education, housing/urban regeneration and water/wastewater.  PPP activity in Ireland stalled during the credit crisis, and some projects were cancelled, but it has taken off again recently with part of the Infrastructure and Capital Investment Plan 2016 – 2021 to be delivered through PPP showing continuing political commitment to PPP.  Ireland’s interest in PPP cannot be explained by economic rationale alone, as PPP was initiated during a period of prosperity. We consider three alternative explanations: voluntary adoption – where the UK model was closely followed; coercive adoption – where PPP policy was forced upon Ireland; and institutional isomorphism – where institutional creation and change was promoted to aid public sector organisations in gaining institutional legitimacy. We find evidence of all three patterns, with coercive adoption becoming more relevant in recent years. Ireland’s rapid uptake of PPP differs from other European countries, mostly because when PPP was introduced in 1998, the Irish State was in an economic position where it could have directly procured necessary infrastructure. This paper therefore asks why PPP was adopted and how this adoption pattern has affected the sustainability of PPP in Ireland.  This paper defines PPP; examines the background to the PPP approach adopted in Ireland; outlines the theoretical framework of the paper: transfer theory and institutional theory; discusses the methodology; reports on findings and gives conclusions.   

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to survey various meanings attached to a public-private partnership (PPP) and related aspects in Western literature, and identify commonalities and differences between them. Additionally, the article intends to critically assess conflicting and overlapping views on contractual and institutional PPPs, their forms and models, and draw insights for transitional economies. Design/methodology/approach – The article contrasts and compares views on PPP meanings, forms and models within Western PPP literature, and also draws comparisons with understanding of partnership aspects in the Russian language sources. The paper examines theories underpinning PPPs, builds connections to PPP advantages and drawbacks, and provides critical assessment of net benefits that PPPs may bring along to the society. Findings – The article concludes that future PPP research in transitional countries such as Kazakhstan and Russia, particularly in the area of organisational and power arrangements in partnerships, may delineate new concepts such as government as a guarantor of a PPP project, social significance of a PPP project, and risk management in a country’s contextual environment. Practical implications – In transitional countries, in which PPPs are in their infancy, clarification of theoretical positions, and identification of commonalities and differences between meanings attached to the PPP terminology may enable better decisions by researchers and practitioners in their selection and further development of partnerships and related concepts. Originality/value – Research in the field of PPPs in transitional countries such as Russia and Kazakhstan is in its infancy. The paper intends to contribute to the body of knowledge about PPPs by providing detailed account and categorisation of their principal meanings, forms, models, underpinning theories, and drawing insights for future research in transitional countries.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Transport concession contracts are commonly said to be standardized and too rigid. They would not allow public authorities to adapt them to evolving context and circumstances. This paper aims at challenging this view and, more particularly, the view that contractual rigidity for transport concessions is exogenous. Using a transaction cost framework, we disentangle between three main determinants of contractual rigidity: traffic uncertainty; connivance between contracting parties; quality of the institutional environment. Using an original database of toll road concession contracts, we observe a great variety of provisions for toll adjustment. We find that these exogenous determinants significantly influence contractual choices.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Marine litter is an international environmental problem that causes considerable costs to coastal communities and the fishing industry. Several international and national treaties and regulations have provisions to marine litter and forbid disposal of waste into the sea. However, none of these regulations state a responsibility for public authorities to recover marine litter from the sea, like they do for marine litter that washes up on public beaches. In a financial evaluation of a value chain for marine litter incineration it was found out that the total costs of waste incineration are approximately 100 ─ 200 % higher than waste fees offered by waste contractors of ports. The high costs of incineration are derived from the high calorific value of marine litter and therefore a high incineration cost for the waste, and long distances between ports that are taking part in a project for marine litter recovery from the sea and an Energy-from-Waste (EfW) facility. This study provides a possible solution to diverting marine litter from landfills to more environmentally sustainable EfW use by using a public-private partnership (PPP) framework. PPP would seem to fit as a suitable cooperative approach for answering problems of current marine litter disposal in theory. In the end it is up to the potential partners of this proposed PPP to decide whether the benefits of cooperation justify the required efforts.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Diese Arbeit wurde unter dem Titel "Entwicklungstendenzen des europäischen Planungsrechts am Beispiel öffentlich-privater Kooperationen im Städtebau" an der Universität Kassel 2002 als Diplomarbeit (Diplom II) eingereicht.