885 resultados para Projects in dispute


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper reports the results of a three-year study of the effectiveness of mini-projects in a first year laboratory course in chemistry at a Scottish university. A mini-project is a short, practical problem which requires for its solution the application of the knowledge and skills developed in previously completed set experiments. A number of recommendations have been made about the most appropriate ways of introducing mini-projects into undergraduate laboratory course. The main hypothesis of this survey was concerned with the value of mini-projects in laboratory courses formulated within the context of Information Processing Theory.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The size and complexity of projects in the software development are growing very fast. At the same time, the proportion of successful projects is still quite low according to the previous research. Although almost every project's team knows main areas of responsibility which would help to finish project on time and on budget, this knowledge is rarely used in practice. So it is important to evaluate the success of existing software development projects and to suggest a method for evaluating success chances which can be used in the software development projects. The main aim of this study is to evaluate the success of projects in the selected geographical region (Russia-Ukraine-Belarus). The second aim is to compare existing models of success prediction and to determine their strengths and weaknesses. Research was done as an empirical study. A survey with structured forms and theme-based interviews were used as the data collection methods. The information gathering was done in two stages. At the first stage, project manager or someone with similar responsibilities answered the questions over Internet. At the second stage, the participant was interviewed; his or her answers were discussed and refined. It made possible to get accurate information about each project and to avoid errors. It was found out that there are many problems in the software development projects. These problems are widely known and were discussed in literature many times. The research showed that most of the projects have problems with schedule, requirements, architecture, quality, and budget. Comparison of two models of success prediction presented that The Standish Group overestimates problems in project. At the same time, McConnell's model can help to identify problems in time and avoid troubles in future. A framework for evaluating success chances in distributed projects was suggested. The framework is similar to The Standish Group model but it was customized for distributed projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Over the past decade, organizations worldwide have begun to widely adopt agile software development practices, which offer greater flexibility to frequently changing business requirements, better cost effectiveness due to minimization of waste, faster time-to-market, and closer collaboration between business and IT. At the same time, IT services are continuing to be increasingly outsourced to third parties providing the organizations with the ability to focus on their core capabilities as well as to take advantage of better demand scalability, access to specialized skills, and cost benefits. An output-based pricing model, where the customers pay directly for the functionality that was delivered rather than the effort spent, is quickly becoming a new trend in IT outsourcing allowing to transfer the risk away from the customer while at the same time offering much better incentives for the supplier to optimize processes and improve efficiency, and consequently producing a true win-win outcome. Despite the widespread adoption of both agile practices and output-based outsourcing, there is little formal research available on how the two can be effectively combined in practice. Moreover, little practical guidance exists on how companies can measure the performance of their agile projects, which are being delivered in an output-based outsourced environment. This research attempted to shed light on this issue by developing a practical project monitoring framework which may be readily applied by organizations to monitor the performance of agile projects in an output-based outsourcing context, thus taking advantage of the combined benefits of such an arrangement Modified from action research approach, this research was divided into two cycles, each consisting of the Identification, Analysis, Verification, and Conclusion phases. During Cycle 1, a list of six Key Performance Indicators (KPIs) was proposed and accepted by the professionals in the studied multinational organization, which formed the core of the proposed framework and answered the first research sub-question of what needs to be measured. In Cycle 2, a more in-depth analysis was provided for each of the suggested Key Performance Indicators including the techniques for capturing, calculating, and evaluating the information provided by each KPI. In the course of Cycle 2, the second research sub-question was answered, clarifying how the data for each KPI needed to be measured, interpreted, and acted upon. Consequently, after two incremental research cycles, the primary research question was answered describing the practical framework that may be used for monitoring the performance of agile IT projects delivered in an output-based outsourcing context. This framework was evaluated by the professionals within the context of the studied organization and received positive feedback across all four evaluation criteria set forth in this research, including the low overhead of data collection, high value of provided information, ease of understandability of the metric dashboard, and high generalizability of the proposed framework.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This research is focused on deriving framework for the value thought for from the Customer Relationship Management system adopted by an enterprise operating in the financial services industry. It will analyze existing academic work to derive a conceptual value model, while applying secondary industry specific case studies provided by the CRM vendors to check the validity and commonality of these drivers. Furthermore this work locates the variances and correlation between value thought for from CRM system, scope of enterprise operations and size of the enterprise.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper discusses the long-run history of education policies in Brazil. It is suggested that the main reason for the educational backwardness was the existence of strong political interests over education. It is also defended that these interests can be empirically observed in the allocation of public resources between the different levels of education, with political choices favouring specific groups in society. It was not a matter of lack of investment in education, but of inadequate allocation of resources. This pattern of political-based policies created a strong negative path dependence of misallocation of resources in education in Brazil, particularly with significant underinvestment in secondary education.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Chapter 1 presents a brief note on the state at which the construction industry stands at present, bringing into focus the significance of the critical study. Relevance of the study, area of investigation and objectives of the study are outlined in this chapter. The 2nd chapter presents a review of the literature on the relevant areas. In the third chapter an analysis on time and cost overrun in construction highlighting the major factors responsible for it has been done. A couple of case studies to estimate loss to the nation on account of delay in construction have been presented in the chapter. The need for an appropriate estimate and a competent contractor has been emphasised for improving effectiveness in the project implementation. Certain useful equations and thoughts have been formulated on this area in this chapter that can be followed in State PWD and other Govt. organisations. Case studies on project implementation of major projects undertaken by Government sponsored/supported organizations in Kerala have been dealt with in Chapter 4. A detailed description of the project of Kerala Legislature Complex with a critical analysis has been given in this chapter. A detailed account of the investigations carried out on the construction of International Stadium, a sports project of Greater Cochin Development Authority is included here. The project details of Cochin International Airport at Nedumbassery, its promoters and contractors are also discussed in Chapter 4. Various aspects of implementation which led the above projects successful have been discussed in chapter 5. The data collected were analysed through discussion and perceptions to arrive at certain conclusions. The emergence of front-loaded contract and its impact on economics of the project execution are dealt with in this chapter. Analysis of delays in respect of the various project narrated in chapter 3 has been done here. The root causes of the project time and overrun and its remedial measures are also enlisted in this chapter. Study of cost and time overrun of any construction project IS a part of construction management. Under the present environment of heavy investment on construction activities in India, the consequences of mismanagement many a time lead to excessive expenditure which are not be avoidable. Cost consciousness, therefore has to be keener than ever before. Optimization in investment can be achieved by improved dynamism in construction management. The successful completion of coristruction projects within the specified programme, optimizing three major attributes of the process - quality, schedule and costs - has become the most valuable and challenging task for the engineer - managers to perform. So, the various aspects of construction management such as cost control, schedule control, quality assurance, management techniques etc. have also been discussed in this fifth chapter. Chapter 6 summarises the conclusions drawn from the above criticalr1 of rhajor construction projects in Kerala.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Poor project planning, implementation and control and the subsequent cost and time overruns are ubiquitous features that have been posing serious concern at all levels - state, national and international. It results in wastage of the nation's scarce resources and retards the socio-economic progress. Although several studies peripheral on project overruns have been made at the national level, no serious attempt has been made at the state level to identify the magnitude of overruns, their causes and impacts on industrial projects. The present study "Time and Cost Overruns of Industrial Projects in Kerala" is an earnest attempt to probe in depth the time and cost overruns and their impact on industrial projects. The study places emphasise on the identification of the real reasons behind the cost and time overruns. It also covers the present project management practices of industrial projects in Kerala.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In drawing a conclusion for this study, care must be taken in generalizing findings since the population of students and teachers investigated were limited to certain levels in the different schools and countries. This study recognized some complexity of the factors underlying the status of school gardening instruction and activities in Germany, Nigeria and the U.S. as inadequate time for decision-making in the process of gardening, motivation of teachers and students. This was seen as the major impediments that influenced the status of gardening in the three countries. However, these factors were considered to have affected students’ mode of participation in the school gardening projects. This research finding suggests that the promotion and encouragement of students in gardening activities will promote vegetable production and increasing the numbers of practical farmers. Gardening has the potential to create opportunities for learning in an environment where children are able to experience nature first hand and to use the shared experience for communication (Bowker & Tearle, 2007). Therefore, the need for students to be encouraged to participate in gardening programs as the benefit will not only reduce the rate of obesity currently spreading among youths, but will contribute to the improve knowledge on science subjects. To build a network between community, parents and schools, a parent’s community approach should be used as the curriculum. The community approach will tighten the link between schools; community members, parents, teachers and students. This will help facilitate a better gardening projects implementation. Through a close collaboration, teachers and students will be able to identify issues affecting communities and undertake action learning in collaboration with community organizations to assess community needs and plan the implementation strategies as parents are part of the community. The sense of efficacy is a central factor in motivational and learning processes that govern educational improvement, standard and performance on complex tasks of both teachers and students. Dedication and willingness are the major stimulator and achievement of a project. Through a stimulator and provision of incentives and facilities, schools can achieve the best in project development. Teachers and principals should be aware that students are the lever for achieving the set goals in schools. Failure to understand what students need will result in achieving zero result. Therefore, it is advised that schools focus more on how to lure students to work through proper collaboration with the parents and community members. Principals and teachers should identify areas where students need to be corrected, helping them to correct the problem will enable them be committed in the schools’ programs.