944 resultados para Project managers


Relevância:

70.00% 70.00%

Publicador:

Resumo:

The PMBOK Guide is one of the most influential publications concerning the knowledge of the project manangement. Moreover, the pervasion of this guide seems to be set to increase as the basis of accreditation - in conjunction with the increasing global trend toward obtaining project management professional status. However, despite the influence and strengthening profile of this guide, reports continue to be published that detail numerous project failures in a wide range of different industries. The PMBOK Guide comprises mainly declarative (know-what) and procedural (know-how) information. In this sense, the guide is largely normative and provides a very good example of the limitations of this approach as highlighted by proponents of a move to the genuine application of positibe theory in project management.----- The aim of this paper is to determine the applicability of the guide in Australia and to determine the extent to which project success can be attributed to the guide. Project Managers from a variety of organisations were surveyed. This postal survey yielded 48 replies. Descriptive statistics was used to assess the incidence and effectivieness of all the processes in the guide. The results indicate that there were no processes that could be considered as peripheral or as a candidate for elimination from the guide. More specifically, all the processes were identified as either a key routine process or a key selective process and positively related to the level of project success. However, the results also indicated that other major factors pertaining to causal knowledge (know-why) are, at least, equally important determinants of project success. It is concluded that declarative, procedural and causal knowledge are all valuable, and given the preponderance of the first two types of knowledge, there seems to be an urgent need to now ensure an equal quest for causal knowledge. In terms of developing causal knowledge, a good starting point would appear to be both positive theory from production and economics.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Effective knowledge transfer can prevent the reinvention of systems and ideas as well as the repetition of errors. Doing so will save substantial time, as well as contribute to better performance of projects and project-based organisations (PBOs). Despite the importance of knowledge, PBOs face serious barriers to the effective transfer of knowledge, while their characteristics, such as unique and innovative approaches taken during every project, mean they have much to gain from knowledge transfer. As each new project starts, there is the strong potential to reinvent the process, rather than utilise learning from previous projects. In fact, rework is one of the primary factors contributing to construction industry's poor performance and productivity. Current literature has identified several barriers to knowledge transfer in organisational settings in general, and not specifically PBOs. However, PBOs significantly differ from other types of organisations. PBOs operate mainly on temporary projects, where time is a crucial factor and people are more mobile than in other organisational settings. The aim of this research is to identify the key barriers that prevent effective knowledge transfer for PBOs, exclusively. Interviews with project managers and senior managers of PBOs complement the analysis of the literature and provide professional expertise. This research is crucial to gaining a better understanding of obstacles that hinder knowledge transfer in projects. The main contribution of this research is exclusive for PBO, list of key barriers that organisation and project managers need to consider to ensure effective knowledge transfer and better project management.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

There is increasing agreement that understanding complexity is important for project management because of difficulties associated with decision-making and goal attainment which appear to stem from complexity. However the current operational definitions of complex projects, based upon size and budget, have been challenged and questions have been raised about how complexity can be measured in a robust manner that takes account of structural, dynamic and interaction elements. Thematic analysis of data from 25 in-depth interviews of project managers involved with complex projects, together with an exploration of the literature reveals a wide range of factors that may contribute to project complexity. We argue that these factors contributing to project complexity may define in terms of dimensions, or source characteristics, which are in turn subject to a range of severity factors. In addition to investigating definitions and models of complexity from the literature and in the field, this study also explores the problematic issues of ‘measuring’ or assessing complexity. A research agenda is proposed to further the investigation of phenomena reported in this initial study.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

A research study was conducted in a key area of project management: stakeholder and relationship management through communication - ‘the soft skills’. It was conducted with Diploma of Project Management graduates from one Australian Registered Training Organisation (RTO), the Australian College of Project Management (ACPM). The study was designed to initially identify the qualifications and project management experience of the participants. Further, it identified the respondents’ understanding of and attitude to commonly held principles and literature within the project management field as it relates to the soft skills of projects. This is specifically connected to their project experience and knowledge, approach to project communications, and the stakeholder’s needs. Some of the literature showed that through the management and application of the project soft skills by project managers may actually be a recipe for project success. Hence, an important underpinning of this study was that the project manager can enhance project success (or reduce the impact of failure) by identifying and prioritising stakeholders, developing and implementing strategies for engaging and communicating with them. The use of a positivist approach to this research study allowed for the evaluation and understanding of respondents to the emergent theories of successful projects being delivered through the management of stakeholders, communications, and relationships. Consequently, a quantitative approach to this study was undertaken. The participants were drawn from graduates who completed (graduated) from the ACPM with the Diploma of Project Management between January 2004 and December 2007 only. A list of graduates was collated from this period indicating that a total of 656 graduates have completed and graduated with the qualification. The data collection for this study was done in one phase only. The questionnaire was emailed individually by the researcher directly to the selected potential respondents. Subsequently, a total of 44 responses were received, providing an overall response rate of 43%. Two key factors emerged from the survey questionnaire. Firstly, the need for the soft skills to be incorporated in project management curriculum and education programs, and secondly, that successful projects are delivered through the management and application of the project soft skills. It is expected that the findings of this study be provided across various forums (such as vocational education and training, and project management conferences) and via project management bodies such as the Australian Institute of Project Management (AIPM) to inform learning and provide greater insight into the soft skills of project management. It is the contention of the researcher that this quantitative study of Diploma of Project Management graduates’ views and attitudes highlights the importance of project soft skills and its importance in the delivery of successful projects as well as being part of the competencies of a successful project manager. This study also revealed the value of project experience and knowledge as it pertains to the management and application of the project soft skills.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Purpose – Building project management requires real time flow of information between all the project team members or the supply chain members. In the present scenario, when project participants are geographically separated, adoption of Information Communication Technology (ICT) enables such effective communication. But strategic adoption of ICT requires that all the supply chain members follow the accepted methods of communication or the communication protocols. The majority of the construction organizations are small and medium enterprises (SMEs). This research, therefore, proposes to focus on developing IT-enhanced communication protocols for building project management by SMEs. Design/methodology/approach – The research adopts a sequential mixed methods approach, where data collection and analysis are conducted in both the quantitative and qualitative phases of research. Findings – The protocols are proposed as a “Strategic Model for Enhancing ICT Diffusion in Building Projects”. The framework for the model is discussed at three levels of study, i.e industry, organization, and people. Practical implications – While the research was conducted in an Indian context, the research outcome is envisaged to be widely applicable in other countries with due considerations. Originality/value – The developed framework has implications for national level bodies and academic institutions, organizations, people or project managers and is applicable at the international level after due considerations.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Studies indicate project success should be viewed from the different perspectives of the individual stakeholders. Project managers are owner’s agents. In order to allow early corrective actions to take place in case a project is diverted from plan, to accurately report perceived success of the stakeholders by project managers is essential, though there has been little systematic research in this area. The aim of this paper is to report the findings of an empirical study that compares the level of alignment between project managers and key stakeholders on a list of project performance indicators. A telephone survey involving 18 complex project managers and various key project stakeholder groups was conducted in this study. Krippendorff’s Kappa alpha reliability test was used to assess the alignment levels between project managers and stakeholders. Despite the overall agreement level between project manager and stakeholders is only medium; results have also identified 12 performance indicators that have significant level of agreement between project managers and stakeholders.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Managing project-based learning is becoming an increasingly important part of project management. This article presents a comparative case study of 12 cases of knowledge transfer between temporary inter-organizational projects and permanent parent organizations. Our set-theoretic analysis of these data yields two major findings. First, a high level of absorptive capacity of the project owner is a necessary condition for successful project knowledge transfer, which implies that the responsibility for knowledge transfer seems to in the first place lie with the project parent organization, not with the project manager. Second, none of the factors are sufficient by themselves. This implies that successful project knowledge transfer is a complex process always involving configurations of multiple factors. We link these implications with the view of projects as complex temporary organizational forms in which successful project managers need to cope with complexity by simultaneously paying attention to both relational and organizational processes.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Client-side project manager face challenges in motivating project organisations to pursue exceptional design and construction performance. One approach to improving the motivation of project organisations is by offering a financial incentive reward for the achievement of voluntary performance standards above the minimum required standard. However, little investigation has been undertaken into the features of a successful incentive system as a part of an overall procurement strategy. In response to a lack of information available to client-side project managers tasked with the initial design of an incentive system, the paper explores motivation undera successful incentive and identifies key learnings for client-side project managers to consider when designing incentives. Our findings are based on the results of a large Australian case study which is interpreted against a conceptual framework based on both economic and psychological perspectives of motivation. The results suggest the motivation towards incentive goals is influenced by the value the project organisations place on the incentive reward as a commercial opportunity to increase their profit margins. However, perhaps more important are the relationship management processes that promote commitment to the project; and pride in the achievement of project goals. In the case study, these processes intensified the direct motivational effect of the incentive reward on offer. The findings also highlight the importance of ensuring that incentive goals and performance measurement processes remain relevant to the organisation throughout a project to continuously encourage motivation under changing project conditions.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Knowledge has been recognised as a powerful yet intangible asset, which is difficult to manage. This is especially true in a project environment where there is the potential to repeat mistakes, rather than learn from previous experiences. The literature in the project management field has recognised the importance of knowledge sharing (KS) within and between projects. However, studies in that field focus primarily on KS mechanisms including lessons learned (LL) and post project reviews as the source of knowledge for future projects, and only some preliminary research has been carried out on the aspects of project management offices (PMOs) and organisational culture (OC) in KS. This study undertook to investigate KS behaviours in an inter-project context, with a particular emphasis on the role of trust, OC and a range of knowledge sharing mechanisms (KSM) in achieving successful inter-project knowledge sharing (I-PKS). An extensive literature search resulted in the development of an I-PKS Framework, which defined the scope of the research and shaped its initial design. The literature review indicated that existing research relating to the three factors of OC, trust and KSM remains inadequate in its ability to fully explain the role of these contextual factors. In particular, the literature review identified these areas of interest: (1) the conflicting answers to some of the major questions related to KSM, (2) the limited empirical research on the role of different trust dimensions, (3) limited empirical evidence of the role of OC in KS, and (4) the insufficient research on KS in an inter-project context. The resulting Framework comprised the three main factors including: OC, trust and KSM, demonstrating a more integrated view of KS in the inter-project context. Accordingly, the aim of this research was to examine the relationships between these three factors and KS by investigating behaviours related to KS from the project managers‘ (PMs‘) perspective. In order to achieve the aim, this research sought to answer the following research questions: 1. How does organisational culture influence inter-project knowledge sharing? 2. How does the existence of three forms of trust — (i) ability, (ii) benevolence and (iii) integrity — influence inter-project knowledge sharing? 3. How can different knowledge sharing mechanisms (relational, project management tools and process, and technology) improve inter-project knowledge sharing behaviours? 4. How do the relationships between these three factors of organisational culture, trust and knowledge sharing mechanisms improve inter-project knowledge sharing? a. What are the relationships between the factors? b. What is the best fit for given cases to ensure more effective inter-project knowledge sharing? Using multiple case studies, this research was designed to build propositions emerging from cross-case data analysis. The four cases were chosen on the basis of theoretical sampling. All cases were large project-based organisations (PBOs), with a strong matrix-type structure, as per the typology proposed by the Project Management Body of Knowledge (PMBoK) (2008). Data were collected from project management departments of the respective organisations. A range of analytical techniques were used to deal with the data including pattern matching logic and explanation building analysis, complemented by the use of NVivo for data coding and management. Propositions generated at the end of the analyses were further compared with the extant literature, and practical implications based on the data and literature were suggested in order to improve I-PKS. Findings from this research conclude that OC, trust, and KSM contribute to inter-project knowledge sharing, and suggest the existence of relationships between these factors. In view of that, this research identified the relationships between different trust dimensions, suggesting that integrity trust reinforces the relationship between ability trust and knowledge sharing. Furthermore, this research demonstrated that characteristics of culture and trust interact to reinforce preferences for mechanisms of knowledge sharing. This means that cultures that facilitate characteristics of Clan type are more likely to result in trusting relationships, hence are more likely to use organic sources of knowledge for both tacit and explicit knowledge exchange. In contrast, cultures that are empirically driven, based on control, efficiency, and measures (characteristics of Hierarchy and Market types) display tendency to develop trust primarily in ability of non-organic sources, and therefore use these sources to share mainly explicit knowledge. This thesis contributes to the project management literature by providing a more integrative view of I-PKS, bringing the factors of OC, trust and KSM into the picture. A further contribution is related to the use of collaborative tools as a substitute for static LL databases and as a facilitator for tacit KS between geographically dispersed projects. This research adds to the literature on OC by providing rich empirical evidence of the relationships between OC and the willingness to share knowledge, and by providing empirical evidence that OC has an effect on trust; in doing so this research extends the theoretical propositions outlined by previous research. This study also extends the research on trust by identifying the relationships between different trust dimensions, suggesting that integrity trust reinforces the relationship between ability trust and KS. Finally, this research provides some directions for future studies.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The construction phase of building projects is often a crucial influencing factor in success or failure of projects. Project managers are believed to play a significant role in firms’ success and competitiveness. Therefore, it is important for firms to better understand the demands of managing projects and the competencies that project managers require for more effective project delivery. In a survey of building project managers in the state of Queensland, Australia, it was found that management and information management system are the top ranking competencies required by effective project managers. Furthermore, a significant number of respondents identified the site manager, construction manager and client’s representative as the three individuals whose close and regular contacts with project managers have the greatest influence on the project managers’ performance. Based on these findings, an intra-project workgroups model is proposed to help project managers facilitate more effective management of people and information on building projects.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

This important research is published at a critical time in the history of PRINCE2. The world’s project managers are under incredible scrutiny and pressure to ensure their projects deliver quality on time and on budget – and even more so during a world recession. The research shows that PRINCE2 goes a long way to helping them achieve these goals. Although its origins began in the UK, PRINCE2 now has a truly international reach. We are delighted that the Queensland University of Technology (QUT) has undertaken this global, thorough and informative research project. While it highlights the strengths of the methodology itself, the report also looks at the challenges organisations face when using a project management method such as PRINCE2. We’re sure the challenges will resonate with project managers around the world. Securing executive support to champion the adoption of PRINCE2, creating a robust business case and prioritising project governance are key issues that all project managers will grapple with during their career. The research also shows that to be thoroughly effective, organisations need to properly embed PRINCE2 and tailor it to suit their particular circumstances. Many successful organisations have sought the effective help of accredited consulting organisations to assist them in developing a programme to tailor and inculcate this method into their organisational culture. The latest version incorporates a whole chapter on tailoring PRINCE2. We believe that the publication of PRINCE2 Directing Successful Projects using PRINCE2 and the development of further support in the form of materials, mentoring and training for senior executives will be of significant benefit to contemporary project based organisations. The APM Group has already developed a qualification for sponsors in conjunction with the UK’s Home Office to help with this.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The role of individuals in the innovation process is highlighted as system integrator and/or champion in literature, however, little is known about championing role of a project manager. Our contention is that the role of the project manager (PM) is essentially of a champion to enable innovation and achieve desired project performance in construction project environment. Hypothesizing that championing behaviour is determined by a number of individual and situational factors, which in turn effects on level of innovation and project performance, we used correlation and regression analysis to test the hypotheses. A survey was carried out with project managers and project team members in 32 building and civil engineering projects in Singapore to test the hypothesized relationships. The results corroborate the importance of championing behaviour to fostering innovation and achieve better project performance.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

With the growth in project management as a form of work organisation in many sectors of the economy has come the significant rise in the number of project managers and project team members. This change in work organisation brings issues in forging career paths and determining career support in work situations that are often dynamic, short lived and intense. In the relatively small but substantially robust Australian economy, a unique labour market and the tyranny of distance bring their own difficulties. Innovative and collaborative project structures and increasing prevalence of contract work provide both challenges and opportunities for new career pathways in many industries. A growing percentage of Australia's workforce is employed in project-based or project-oriented organisations, leading to the claim that Australia is a project-based economy. This provided a context for our research into the career paths and the issues of career management for project managers working in a project based economy. Using in-depth interviews with project managers from three industry areas we found generational and gender differences in experiences of work, workplace support and mentoring for career development. For a continued strong performance in this economy,organisations that employ project personnel will need to consider how they will ensure the supply of high quality project professionals into the future.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Morris' (1986) analysis of the factors affecting project success and failure is considered in relation to the psychology of judgement under uncertainty. A model is proposed whereby project managers may identify the specific circumstances in which human decision-making is prone to systematic error, and hence may apply a number of de-biasing techniques.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Current research into project management offices (PMOs) has stressed the PMOs' potential to act as knowledge brokers between projects, and between project and top management. Nonetheless, the literature does not provide sufficient evidence of the brokering role of PMOs. The research reported here aims to examine PMO's functions from a knowledge sharing perspective and explore whether or not these functions reflect the knowledge sharing needs of project managers (PMs). These issues are investigated through a cross-case analysis of seven organisations. The main contribution is insight into how PMs share knowledge and awareness of the need to structure PMOs to align with PMs' nature, needs and expectations in order to improve knowledge sharing in PBOs. Finally, some practical steps for helping PMOs to better adapt their functions to the needs of PMs and their learning and knowledge sharing style are proposed.