920 resultados para Project management office


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Stora Enso has research centres in Finland, Sweden and Germany. The research centres use PIMS as a research project invoicing and monitoring system. Possible reorganization and new financing model for R&D functions have been considered and the project management system should be developed to support the new operation model. The objective of this thesis is to find a model for R&D project management, and to present the project management system of Stora Enso, and to discuss if the current system could be developed to respond to the new needs or should it be replaced with another system. The theoretical part of the study describes challenges in R&D project management, and presents different project characteristics, and methods for managing R&D project portfolio. It is also described how the project management system can support project monitoring and controlling, and how inter-project learning can be enhanced. The empirical part of the study presents the current project management system of Stora Enso and how the system should be developed to support Stora Enso’s R&D functions better. In conclusion, it is stated that there is no relevant reason to replace PIMS with another system, because PIMS can be developed to support R&D project management better with a hybrid system. It is also suggested that the new financing model should not be implemented before more comprehensive analysis of its effects is conducted.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

According to several surveys and observations, the percentage of successfully conducted IT projects without over-budgeting and delays in time schedule are extremely low. Many projects also are evaluated as failures in terms of delivered functionality. Nuldén (1996) compares IT projects with bad movies; after watching for 2 hours, one still tries to finish it even though one understands that it is a complete waste of time. The argument for that is 'I've already invested too much time to terminate it now'. The same happens with IT projects: sometimes the company continues wasting money on these projects for a long time, even though there are no expected benefits from these projects. Eventually these projects are terminated anyway, but until this moment, the company spends a lot. The situation described above is a consequence of “escalation of commitment” - project continuation even after a manager receives negative feedback of the project’s success probability. According to Keil and Mähring (2010), even though escalation can occur in any type of project, it is more common among complex technological projects, such as IT projects. Escalation of commitment very often results in runaway projects. In order to avoid it, managers use de-escalation strategies, which allow the resources to be used in more effective. These strategies lead to project termination or turning around, which stops the flow of wasted investments. Numbers of researches explore escalation of commitment phenomena based on experiments and business cases. Moreover, during the last decade several frameworks were proposed for de-escalation strategy. However, there is no evidence of successful implementation of the de-escalation of commitment strategy in the literature. In addition, despite that fact that IT project management methodologies are widely used in the companies, none of them cover the topic of escalation of commitment risks. At the same time, there are no researches proposing the way to implement de-escalation of commitment strategy into the existing project management methodology The research is focused on a single case of large ERP implementation project by the consulting company. Hence, the main deliverables of the study include suggestions of improvement in de-escalation methods and techniques in the project and in the company. Moreover, the way to implement these methods into existing project management methodology and into the company general policies is found.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Scrum is an agile project management approach that has been widely practiced in the software development projects. It has proven to increase quality, productivity, customer satisfaction, transparency and team morale among other benefits from its implementation. The concept of scrum is based on the concepts of incremental innovation strategies, lean manufacturing, kaizen, iterative development and so on and is usually contrasted with the linear development models such as the waterfall method in the software industry. The traditional approaches to project management such as the waterfall method imply intensive upfront planning and approval of the entire project. These sort of approaches work well in the well-defined stable environments where all the specifications of the project are known in the beginning. However, in the uncertain environments when a project requires continuous development and incorporation of new requirements, they do not tend to work well. The scrum framework was inspiraed by Nonaka’s article about new product developement and was later adopted by software development practitioners. This research explores conditions for and benefits of the application of scrum framework beyond software development projects. There are currently a few case studies on the scrum implementation in non-software projects, but there is a noticeable trend of it in the scrum practitioners’ community. The research is based on the real-life context multiple case study analysis of three different non-software projects. The results of the research showed that in order to succeed within scrum projects need to satisfy certain conditions – necessary and sufficient. Among them the key factors are uncertainty of the project environment, not well defined outcomes, commitment of the scrum teams and management support. The top advantages of scrum implementation identified in the present research include improved transparency, accountability, team morale, communications, cooperation and collaboration. Further researches are advised to be carried out in order to validate these findings on a larger sample and to focus on more specific areas of scrum project management implementation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Agile methods have become increasingly popular in the field of software engineering. While agile methods are now generally considered applicable to software projects of many different kinds, they have not been widely adopted in embedded systems development. This is partly due to the natural constraints that are present in embedded systems development (e.g. hardware–software interdependencies) that challenge the utilization of agile values, principles and practices. The research in agile embedded systems development has been very limited, and this thesis tackles an even less researched theme related to it: the suitability of different project management tools in agile embedded systems development. The thesis covers the basic aspects of many different agile tool types from physical tools, such as task boards and cards, to web-based agile tools that offer all-round solutions for application lifecycle management. In addition to these two extremities, there is also a wide range of lighter agile tools that focus on the core agile practices, such as backlog management. Also other non-agile tools, such as bug trackers, can be used to support agile development, for instance, with plug-ins. To investigate the special tool requirements in agile embedded development, the author observed tool related issues and solutions in a case study involving three different companies operating in the field of embedded systems development. All three companies had a distinct situation in the beginning of the case and thus the tool solutions varied from a backlog spreadsheet built from scratch to plug-in development for an already existing agile software tool. Detailed reports are presented of all three tool cases. Based on the knowledge gathered from agile tools and the case study experiences, it is concluded that there are tool related issues in the pilot phase, such as backlog management and user motivation. These can be overcome in various ways epending on the type of a team in question. Finally, five principles are formed to give guidelines for tool selection and usage in agile embedded systems development.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This research studied the project performance measurement from the perspective of strategic management. The objective was to find a generic model for project performance measurement that emphasizes strategy and decision making. Research followed the guidelines of a constructive research methodology. As a result, the study suggests a model that measures projects with multiple meters during and after projects. Measurement after the project is suggested to be linked to the strategic performance measures of a company. The measurement should be conducted with centralized project portfolio management e.g. using the project management office in the organization. Metrics, after the project, measure the project’s actual benefit realization. During the project, the metrics are universal and they measure the accomplished objectives relation to costs, schedule and internal resource usage. Outcomes of these measures should be forecasted by using qualitative or stochastic methods. Solid theoretical background for the model was found from the literature that covers the subjects of performance measurement, projects and uncertainty. The study states that the model can be implemented in companies. This statement is supported by empirical evidence from a single case study. The gathering of empiric evidence about the actual usefulness of the model in companies is left to be done by the evaluative research in the future.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of this study is to investigate the role of operational flexibility for effective project management in the construction industry. The specific objectives are to: a) Identify the determinants of operational flexibility potential in construction project management b) Investigate the contribution of each of the determinants to operational flexibility potential in the construction industry c) Investigate on the moderating factors of operational flexibility potential in a construction project environment d) Investigate whether moderated operational flexibility potential mediates the path between predictors and effective construction project management e) Develop and test a conceptual model of achieving operational flexibility for effective project management The purpose of this study is to findout ways to utilize flexibility inorder to manage uncertain project environment and ultimately achieve effective project management. In what configuration these operational flexibility determinants are demanded by construction project environment in order to achieve project success. This research was conducted in three phases, namely: (i) exploratory phase (ii) questionnaire development phase; and (iii) data collection and analysis phase. The study needs firm level analysis and therefore real estate developers who are members of CREDAI, Kerala Chapter were considered. This study provides a framework on the functioning of operational flexibility, offering guidance to researchers and practitioners for discovering means to gain operational flexibility in construction firms. The findings provide an empirical understanding on kinds of resources and capabilities a construction firm must accumulate to respond flexibly to the changing project environment offering practitioners insights into practices that build firms operational flexibility potential. Firms are dealing with complex, continuous changing and uncertain environments due trends of globalization, technical changes and innovations and changes in the customers’ needs and expectations. To cope with the increasingly uncertain and quickly changing environment firms strive for flexibility. To achieve the level of flexibility that adds value to the customers, firms should look to flexibility from a day to day operational perspective. Each dimension of operational flexibility is derived from competences and capabilities. In this thesis only the influence on customer satisfaction and learning exploitation of flexibility dimensions which directly add value in the customers eyes are studied to answer the followingresearch questions: “What is the impact of operational flexibility on customer satisfaction?.” What are the predictors of operational flexibility in construction industry? .These questions can only be answered after answering the questions like “Why do firms need operational flexibility?” and “how can firms achieve operational flexibility?” in the context of the construction industry. The need for construction firms to be flexible, via the effective utilization of organizational resources and capabilities for improved responsiveness, is important because of the increasing rate of changes in the business environment within which they operate. Achieving operational flexibility is also important because it has a significant correlation with a project effectiveness and hence a firm’s turnover. It is essential for academics and practitioners to recognize that the attainment of operational flexibility involves different types namely: (i) Modification (ii) new product development and (iii) demand management requires different configurations of predictors (i.e., resources, capabilities and strategies). Construction firms should consider these relationships and implement appropriate management practices for developing and configuring the right kind of resources, capabilities and strategies towards achieving different operational flexibility types.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Exercises and solutions in LaTex

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Exercises and solutions in PDF

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This is a presentation given to 3rd year Project students on our BSc degree programmes to help them project manage their 3rd year dissertations. It covers three practical methods. Fact: Skills Audits to help make projects realistic. Failure: Risk Assessment to help with contingency planning. Fiction: Gantt Charts to help with managing time and effort.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aims of this theme are: •to identify and develop personal attributes that enable postgraduate students to manage a research project to the correct standard and to complete it on time; •to enable postgraduate students to plan and organise their research project in order to successfully reach their full potential in their chosen postgraduate degree; •to enable postgraduate students to apply appropriate time management skills to the planning of their research project; •to identify study skills and resource management strategies that can benefit postgraduate students to effectively organise and research their chosen field; •to develop team work skills within the postgraduate cohort studying the Project Management core theme.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Source files for theme 5

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Since mid-1990s, companies have adopted agile methods and incorporated them in their development methodologies. For this reason, future project managers and developers need to have a full understanding of these methods. At present, the university’s approach to agile methods is theoretical and is not reflected during the development of a product and their practical use. The purpose of this project is the creation of a software system in the form of a game, named Agile Game, which simulates their use. The system is designed for use as supplementary material in lectures, to help students understand agile methods, to present their use within a project, and to demonstrate how they differ from traditional project management methodologies. The final system, which is web based, was implemented using PHP, MySQL and JavaScript. It was fully tested against the requirements and evaluated by peer students. The evaluation showed that the majority of users were satisfied with the system but they thought that it should contain more detailed information at every step of the game. For this reason, some parts of the design and the content were reviewed to meet user requirements.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

El reportatge de recerca es el resultat, normalment en forma textual, de la transmissió del coneixement del procés de la investigació d’un treball de recerca. El desenvolupament del reportatge de recerca té com objectiu conformar els continguts d’acord amb unes característiques tangibles (l’estil de la redacció...) o intangibles (emoció, passió pel coneixement...). La seva difusió té com objectiu arribar al destinatari final per transmetre-li el coneixement de com s’ha fet la recerca o, quan està adreçat a un públic ampli, per gaudir de la lectura. El treball de recerca és una eina didàctica cada dia més utilitzada. Llavors, cal que la seva difusió sigui ben presentada, ja sigui tan a nivell dels resultats com del procés. Hi ha diferents mitjans de comunicació d’aquesta difusió: des de el text fins l’audiovisual. En el present article es farà referència al format de text amb els complements d’imatges que s’escaiguin. A continuació es mostrarà la forma com s’estructura el treball de recerca, la metodologia del reportatge de recerca i els elements informatius, que es proposa anomenar-los infotextos, que hi apareixen. La bona articulació del infotextos en el reportatge generarà interès per la lectura i posarà en valor el treball de la recerca

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The technique of linear responsibility analysis is used for a retrospective case study of a private industrial development consisting of an extension to existing buildings to provide a warehouse, services block and packing line. The organizational structure adopted on the project is analysed using concepts from systems theory which are included in Walker's theoretical model of the structure of building project organizations (Walker, 1981). This model proposes that the process of building provision can be viewed as systems and subsystems which are differentiated from each other at decision points. Further to this, the subsystems can be viewed as the interaction of managing system and operating system. Using Walker's model, a systematic analysis of the relationships between the contributors gives a quantitative assessment of the efficacy of the organizational structure used. The causes of the client's dissatisfaction with the outcome of the project were lack of integration and complexity of the managing system. However, there was a high level of satisfaction with the completed project and this is reflected by the way in which the organization structure corresponded to the model's propositions.