824 resultados para Probabilistic decision process model
Resumo:
Purpose: This paper presents a combined multi-phase supplier selection model. The process repeatedly revisits the criteria and sourcing decision as the development process continues. This enables a structured adoption of product and production system innovation from strategic suppliers, where previously the literature purely focuses on product innovation or cost reduction. Design/methodology/approach: The authors adopted an embedded researcher style, inductive, qualitative case study of an industrial supply cluster comprising a focal automotive company and its interaction with three different strategic stamping suppliers. Findings: Our contribution is the multi-phased production and product innovation process. This is an advance from traditional supplier selection and also an extension of ideas of supplier-located product development as it includes production system development, and complements the literature on working with strategic suppliers. Specifically, we explicitly articulate the previously unreported issue of whether a supplier chosen for its innovation capabilities at the start of the new product development process will also be the most appropriate supplier during the production system development phase, when an ability to work collaboratively may be the most important attribute, or in the large-scale production phase when an ability to manufacture at low unit cost may be most important. Originality/value: The paper identifies a multi-phase approach to tendering within a fixed body of strategic suppliers which seeks to identify the optimum technological and process decisions as well as the traditional supplier sourcing choice. These areas have not been combined before and generate a valuable approach for firms to adopt as well as for researchers to extend our understanding of a highly complex process.
Resumo:
A Work Project, presented as part of the requirements for the Award of a Masters Double Degree in Economics and International Business from the NOVA – School of Business and Economics and Insper Instituto de Ensino e Pesquisa
Resumo:
Although the construction pollution index has been put forward and proved to be an efficient approach to reducing or mitigating pollution level during the construction planning stage, the problem of how to select the best construction plan based on distinguishing the degree of its potential adverse environmental impacts is still a research task. This paper first reviews environmental issues and their characteristics in construction, which are critical factors in evaluating potential adverse impacts of a construction plan. These environmental characteristics are then used to structure two decision models for environmental-conscious construction planning by using an analytic network process (ANP), including a complicated model and a simplified model. The two ANP models are combined and called the EnvironalPlanning system, which is applied to evaluate potential adverse environmental impacts of alternative construction plans.
Resumo:
There are strong uncertainties regarding LAI dynamics in forest ecosystems in response to climate change. While empirical growth & yield models (G&YMs) provide good estimations of tree growth at the stand level on a yearly to decennial scale, process-based models (PBMs) use LAI dynamics as a key variable for enabling the accurate prediction of tree growth over short time scales. Bridging the gap between PBMs and G&YMs could improve the prediction of forest growth and, therefore, carbon, water and nutrient fluxes by combining modeling approaches at the stand level.Our study aimed to estimate monthly changes of leaf area in response to climate variations from sparse measurements of foliage area and biomass. A leaf population probabilistic model (SLCD) was designed to simulate foliage renewal. The leaf population was distributed in monthly cohorts, and the total population size was limited depending on forest age and productivity. Foliage dynamics were driven by a foliation function and the probabilities ruling leaf aging or fall. Their formulation depends on the forest environment.The model was applied to three tree species growing under contrasting climates and soil types. In tropical Brazilian evergreen broadleaf eucalypt plantations, the phenology was described using 8 parameters. A multi-objective evolutionary algorithm method (MOEA) was used to fit the model parameters on litterfall and LAI data over an entire stand rotation. Field measurements from a second eucalypt stand were used to validate the model. Seasonal LAI changes were accurately rendered for both sites (R-2 = 0.898 adjustment, R-2 = 0.698 validation). Litterfall production was correctly simulated (R-2 = 0.562, R-2 = 0.4018 validation) and may be improved by using additional validation data in future work. In two French temperate deciduous forests (beech and oak), we adapted phenological sub-modules of the CASTANEA model to simulate canopy dynamics, and SLCD was validated using LAI measurements. The phenological patterns were simulated with good accuracy in the two cases studied. However, IA/max was not accurately simulated in the beech forest, and further improvement is required.Our probabilistic approach is expected to contribute to improving predictions of LAI dynamics. The model formalism is general and suitable to broadleaf forests for a large range of ecological conditions. (C) 2014 Elsevier B.V. All rights reserved.
Resumo:
This paper provides an insight to the development of a process model for the essential expansion of the automatic miniload warehouse. The model is based on the literature research and covers four phases of a warehouse expansion: the preparatory phase, the current state analysis, the design phase and the decision making phase. In addition to the literature research, the presented model is based on a reliable data set and can be applicable with a reasonable effort to ensure the informed decision on the warehouse layout. The model is addressed to users who are usually employees of logistics department, and is oriented on the improvement of the daily business organization combined with the warehouse expansion planning.
Resumo:
As the requirements for health care hospitalization have become more demanding, so has the discharge planning process become a more important part of the health services system. A thorough understanding of hospital discharge planning can, then, contribute to our understanding of the health services system. This study involved the development of a process model of discharge planning from hospitals. Model building involved the identification of factors used by discharge planners to develop aftercare plans, and the specification of the roles of these factors in the development of the discharge plan. The factors in the model were concatenated in 16 discrete decision sequences, each of which produced an aftercare plan.^ The sample for this study comprised 407 inpatients admitted to the M. D. Anderson Hospital and Tumor Institution at Houston, Texas, who were discharged to any site within Texas during a 15 day period. Allogeneic bone marrow donors were excluded from the sample. The factors considered in the development of discharge plans were recorded by discharge planners and were used to develop the model. Data analysis consisted of sorting the discharge plans using the plan development factors until for some combination and sequence of factors all patients were discharged to a single site. The arrangement of factors that led to that aftercare plan became a decision sequence in the model.^ The model constructs the same discharge plans as those developed by hospital staff for every patient in the study. Tests of the validity of the model should be extended to other patients at the MDAH, to other cancer hospitals, and to other inpatient services. Revisions of the model based on these tests should be of value in the management of discharge planning services and in the design and development of comprehensive community health services.^
Resumo:
As levels of investment in advanced manufacturing systems increase, effective project management becomes ever more critical. This paper demonstrates how the model proposed by Mintzberg, Raisinghani and Theoret in 1976, which structures complicated strategic decision processes, can be applied to the design of new production systems for both descriptive and analytical research purposes. This paper sets a detailed case study concerning the design and development of an advanced manufacturing system within the Mintzberg decision model and so breaks down the decision sequence into constituent parts. It thus shows how a structured model can provide a framework for the researcher who wishes to study decision episodes in the design of manufacturing facilities in greater depth.
Resumo:
This paper investigates neural network-based probabilistic decision support system to assess drivers' knowledge for the objective of developing a renewal policy of driving licences. The probabilistic model correlates drivers' demographic data to their results in a simulated written driving exam (SWDE). The probabilistic decision support system classifies drivers' into two groups of passing and failing a SWDE. Knowledge assessment of drivers within a probabilistic framework allows quantifying and incorporating uncertainty information into the decision-making system. The results obtained in a Jordanian case study indicate that the performance of the probabilistic decision support systems is more reliable than conventional deterministic decision support systems. Implications of the proposed probabilistic decision support systems on the renewing of the driving licences decision and the possibility of including extra assessment methods are discussed.
Resumo:
This paper deals with the problem of using the data mining models in a real-world situation where the user can not provide all the inputs with which the predictive model is built. A learning system framework, Query Based Learning System (QBLS), is developed for improving the performance of the predictive models in practice where not all inputs are available for querying to the system. The automatic feature selection algorithm called Query Based Feature Selection (QBFS) is developed for selecting features to obtain a balance between the relative minimum subset of features and the relative maximum classification accuracy. Performance of the QBLS system and the QBFS algorithm is successfully demonstrated with a real-world application
Resumo:
This appendix describes the Order Fulfillment process followed by a fictitious company named Genko Oil. The process is freely inspired by the VICS (Voluntary Inter-industry Commerce Solutions) reference model1 and provides a demonstration of YAWL’s capabilities in modelling complex control-flow, data and resourcing requirements.
Resumo:
While Business Process Management (BPM) is an established discipline, the increased adoption of BPM technology in recent years has introduced new challenges. One challenge concerns dealing with process model complexity in order to improve the understanding of a process model by stakeholders and process analysts. Features for dealing with this complexity can be classified in two categories: 1) those that are solely concerned with the appearance of the model, and 2) those that in essence change the structure of the model. In this paper we focus on the former category and present a collection of patterns that generalize and conceptualize various existing features. The paper concludes with a detailed analysis of the degree of support of a number of state-of-the-art languages and language implementations for these patterns.
Resumo:
Process models are used by information professionals to convey semantics about the business operations in a real world domain intended to be supported by an information system. The understandability of these models is vital to them actually being used. After all, what is not understood cannot be acted upon. Yet until now, understandability has primarily been defined as an intrinsic quality of the models themselves. Moreover, those studies that looked at understandability from a user perspective have mainly conceptualized users through rather arbitrary sets of variables. In this paper we advance an integrative framework to understand the role of the user in the process of understanding process models. Building on cognitive psychology, goal-setting theory and multimedia learning theory, we identify three stages of learning required to realize model understanding, these being Presage, Process, and Product. We define eight relevant user characteristics in the Presage stage of learning, three knowledge construction variables in the Process stage and three potential learning outcomes in the Product stage. To illustrate the benefits of the framework, we review existing process modeling work to identify where our framework can complement and extend existing studies.