992 resultados para Plan of arrangement


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Abstract: Critical reflection on the evaluation plan of the VARPUNEN project

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The government of Catalonia has developed a planning framework that seeks to establish the provision of cultural facilities throughout the country. The Cultural Facilities Plan of Catalonia (PECCAT) is based on an analysis of historical gaps and establishes a minimum spatial scheme. The plan responds to problems associated with the absence of a former similar instrument, which has led to an inconsistent and inappropriate cultural infrastructure that fails to fulfill its fundamental mission of securing the cultural rights of the population. The paper sets forth the aims of this policy and describes the objectives and basic characteristics of the plan and the expected outcomes. With the plan, the government of Catalonia seeks to rebalance the infrastructure within the territory and to ensure universal access to basic cultural services, while avoiding a logic of standardization and taking local communities into account. With the development of local plans in the municipalities, local governments encourage community participation processes to adapt and decide on priorities for action based on needs assessments and cultural opportunities for local sustainable development. The local plans focus on local cultural strengths, take advantage of opportunities, and aim to realize the cultural dynamics of a place through establishing an infrastructure that can best respond to the needs and cultural demands of the local communities, taking into account economic, social, and environmental sustainability.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of this master’s thesis was to document the present state and to create a development plan for Moventas Wind’s cost accounting. The current cost accounting system was evaluated and most fundamental problems were chosen as areas of focus in development work. The development plan includes both short- and long-term development proposals for problems identified. This report presents two alternative models for product costing. Benchmarking of cost accounting practices and modern cost accounting theories were used in development of cost accounting. It was found that the current cost accounting system functions quite well and the adjustments in unit cost rate calculation have only a minor influence on costs of goods sold. An OEE-based standard cycle concept was also developed and it was found that the implementation of this new system is worthwhile in the long-term.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of the Thesis was to evaluate the business environment of electrical vehicle charging equipment (EVSE) in USA, find the key issues of entering the US EVSE markets and to form a marketing plan for possible market entry. The external market research analyzed the environment, customers, competitors and demand of EVSEs. In the internal analysis the focus was on resources and capabilities, offering, performance, business relations and US related issues. The research about the business environment was done using already available information from market studies and seminars. In external analysis there were also two semi-structured interviews from market experts used. The internal analysis was done mostly by interviews, but also company’s internal data sources were used. The interviews were semi-constructed and included eight interviewees from each part of EVSE value chain. The research findings were analyzed using SWOT analysis, which was converted to a so called TOWS matrix for extracting strategies. As a result of the Thesis, valuable information about the US markets and their requirements for EVSEs was gained. By matching the strengths of the case company and market requirements, customer segmentation and targeting were done and a marketing plan was constructed for the case company to help their management to evaluate the feasibility of possible market entry and investments to USA.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pre 1913 plan showing the Grand Central Hotel and Santorium Co. Ltd. on St. Paul Street, St. Catharines, Ont.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

1 map :|bdigital, JPEG file

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Survey map and description of the land at the cut of the Chippewa or Welland River. Created by The Welland Canal Company. Included is a drawing of the land along with brief surveyors notes. Noteable features include; bridge, Welland River, road, Stone house, J. Cummings Esq. house, military line, military land, Old Fort, old military draw bridge. Surveyor notes are seen in pencil on the map.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A plan of part of the lands of the Six Nations Indians, dated January 26, 1833. A note on the plan reads “Part of the lands of the Six Nations Indians as surveyed by order of their Superintendent, John Brant, Esq. Dated at the Mohawk Village, the 29th day of April, 1831. Part of which was returned to the office of the Honourable, the Commissior of Crown Lands, on the 31st Oct. 1831, and now rendered more complete by a continuation of the survey under the same order in 1832, and by information obtained from private practice not connected with my official instructions all of which is most respectfully submitted to the inspection and for the information of His Majesty’s Government by Lewis Burwell, Surveyor”. The map shows the early loyalist land holdings in the Brantford area.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A map titled "Plan of Attack of a Iagdkommaudo west of Cantigny on 27 May 1918. There are two sketches and the legend indicates that sketch no. 1 is "Firing until 7A.M." and sketch no. 2 is "Firing after 7A.M."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A map titled "Plan of Organization of Conquered Position". There is a legend at the top right that reads: "Parallel of Surveillance, Parallel of Resistance, Parallel of the Redoubts, Limit between Bns., Final Objective, Final Line after Counter Attack." The map is dated 17 December 1918

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A map titled "Plan of Operation against Cantigny" and dated 17 December 1918.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Note to S.D. Woodruff regarding the plan of operation. First, “draw up a report showing the cost of work”. This note is unsigned, n.d.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Plan of levels of marsh land on the line of the proposed ditch from Lyons Creek Culvert on the Welland Canal to lot no. 32 in the 2nd concession of Wainfleet (1 page, hand drawn), n.d.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Blueprint of the plan of the City of Toronto (85 cm. x 140 cm.), 1857.