1000 resultados para HR Planning


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Greene County, Iowa, overlay project, completed in October, 1973, was evaluated in October, 1978, after five years of service and most recently in October, 1983, after ten years of service. The 33 fibrous concrete sections, four CRCP sections, two mesh reinforced and two plain concrete sections with doweled reinforcement were rated relative to each other on a scale of 0 to 100. The rating was conducted by original members of the Project Planning Committee, Iowa DOT, Iowa County, Federal Highway Administration, University of Illinois and industry representatives. In all, there were 23 and 24 representatives who rated the project in 1978 and 1983 respectively. The 23 or 24 values were then averaged to provide a final rating number for each section or variable. All experimental overlay sections had performed quite well in the period from five through 10 years, experiencing only limited additional deterioration. Based upon this relatively good performance through 10 years, the sections will be maintained for further research with another evaluation at 15 years. The 4" thick nonfibrous mesh reinforced continuous reinforced concrete pavement overlay sections provided the best performance in this research project. Another nonfibrous 5" thick bar reinforced overlay section performed almost as well. The best performance of a fibrous reinforced concrete section was obtained with 160 pounds of fiber per cubic yard.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Self Instructional Math course book is designed to provide a basic math knowledge for those involved in the planning, design, and construction of highways. It was developed in a manner to allow the student to take the course with minimal supervision and at times that the work schedule allows. The first version of the course was developed in the early 1970's and due to its popularity was revised in the early 1990's to reflect changes in the highway construction math needs. The anticipated move to metric (System International) measurements by the highway industry has necessitated the need to change the math course problem values to metric units. The course includes the latest in Iowa DOT policy information relative to the selection and use of metric values for highway design, and construction. Each unit of the book contains instructional information, section quizzes and a comprehensive examination. All problem values are expressed in metric rather than dual (english and SI) units. The appendix contains useful conversion factors to assist the reader in making the change to metric.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In the administration, planning, design, and maintenance of road systems, transportation professionals often need to choose between alternatives, justify decisions, evaluate tradeoffs, determine how much to spend, set priorities, assess how well the network meets traveler needs, and communicate the basis for their actions to others. A variety of technical guidelines, tools, and methods have been developed to help with these activities. Such work aids include design criteria guidelines, design exception analysis methods, needs studies, revenue allocation schemes, regional planning guides, designation of minimum standards, sufficiency ratings, management systems, point based systems to determine eligibility for paving, functional classification, and bridge ratings. While such tools play valuable roles, they also manifest a number of deficiencies and are poorly integrated. Design guides tell what solutions MAY be used, they aren't oriented towards helping find which one SHOULD be used. Design exception methods help justify deviation from design guide requirements but omit consideration of important factors. Resource distribution is too often based on dividing up what's available rather than helping determine how much should be spent. Point systems serve well as procedural tools but are employed primarily to justify decisions that have already been made. In addition, the tools aren't very scalable: a system level method of analysis seldom works at the project level and vice versa. In conjunction with the issues cited above, the operation and financing of the road and highway system is often the subject of criticisms that raise fundamental questions: What is the best way to determine how much money should be spent on a city or a county's road network? Is the size and quality of the rural road system appropriate? Is too much or too little money spent on road work? What parts of the system should be upgraded and in what sequence? Do truckers receive a hidden subsidy from other motorists? Do transportation professions evaluate road situations from too narrow of a perspective? In considering the issues and questions the author concluded that it would be of value if one could identify and develop a new method that would overcome the shortcomings of existing methods, be scalable, be capable of being understood by the general public, and utilize a broad viewpoint. After trying out a number of concepts, it appeared that a good approach would be to view the road network as a sub-component of a much larger system that also includes vehicles, people, goods-in-transit, and all the ancillary items needed to make the system function. Highway investment decisions could then be made on the basis of how they affect the total cost of operating the total system. A concept, named the "Total Cost of Transportation" method, was then developed and tested. The concept rests on four key principles: 1) that roads are but one sub-system of a much larger 'Road Based Transportation System', 2) that the size and activity level of the overall system are determined by market forces, 3) that the sum of everything expended, consumed, given up, or permanently reserved in building the system and generating the activity that results from the market forces represents the total cost of transportation, and 4) that the economic purpose of making road improvements is to minimize that total cost. To test the practical value of the theory, a special database and spreadsheet model of Iowa's county road network was developed. This involved creating a physical model to represent the size, characteristics, activity levels, and the rates at which the activities take place, developing a companion economic cost model, then using the two in tandem to explore a variety of issues. Ultimately, the theory and model proved capable of being used in full system, partial system, single segment, project, and general design guide levels of analysis. The method appeared to be capable of remedying many of the existing work method defects and to answer society's transportation questions from a new perspective.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

HR-394 was a software and database development project. Via funding provided by the Iowa Highway Research Board, the Iowa County Engineer's Association Service Bureau oversaw the planning and implementation of an Internet based application that supports two major local-government transportation project activities: Project programming and Development tracking. The goals were to reduce errors and inconsistencies, speed up the processes, link people to both project data and each other, and build a framework that could eventually support a 'paperless' work flow. The work started in 1999 and initial development was completed by the fall of 2002. Since going live, several 'piggy back' applications have been required to make the Programming side better fit actual work procedures. This part of the system has proven adequate but will be rewritten in 2004 to make it easier to use. The original development side module was rejected by the users and so had to be rewritten in 2003. The second version has proven much better, is heavily used, and is interconnected with Iowa DOT project data systems. Now that the system is in operation, it will be maintained and operated by the ICEA Service Bureau as an ongoing service function.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Materials and Research Departments cooperated in planning and performing Research Project HR-1004 during the summer of 1974. The Research Department agreed to accept responsibility for the final report; it has been delayed because of our efforts to obtain a maximum amount of information from the data by means of various statistical analyses. This memorandum contains all of the data, hopefully in a manner that will permit you to proceed with your consideration of an experimental project using cathodic protection for the CRCP steel. A more detailed report will be prepared at a later date.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The report describes the state of the art video equipment used and experiences gained from the 6,800 mile field test. The first objective of this project was to determine if laser disc equipment could capture and store usable roadway images while operating in a mobile environment. The second objective was to evaluate methods of using optical disc storage and retrieval features to enhance highway planning and design function. Several highway departments have attempted to use video technology to replace the traditional 16 and 35 mm film format used in photologging. These attempts have met with limited success because of the distortion caused by video technology not being capable of dealing with highway speeds. The distortion has caused many highway signs to be unreadable and, therefore, clients have labeled the technology unusable. Two methods of using optical laser disc storage and retrieval have been successfully demonstrated by Wisconsin and Connecticut Departments of Transportation. Each method provides instantaneous retrieval and linking of images with other information. However, both methods gather the images using 35 mm film techniques. The 35 mm film image is then transferred to laser disc. Eliminating the film conversion to laser disc has potential for saving $4 to $5 per logging mile. In addition to a cost savings, the image would be available immediately as opposed to delays caused by film developing and transferring to laser disc. In June and November of 1986 Iowa DOT staff and cooperating equipment suppliers demonstrated the concept of direct image capture. The results from these tests were promising and an FHWA Demonstration program established. Since 1986 technology advancements have been incorporated into the design that further improve the image quality originally demonstrated.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This report presents an overview of where the computerized highway information system is now, and its status as a planning and programming tool for state highway agencies. A computerized highway information system is simply a computer linked system which can be used by many divisions of a transportation agency to obtain information to meet data reporting, analyses or other informational needs. The description of the highway information system includes: current use and status, applications, organization and system development, benefits and problems.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The successful performance of company in the market relates to the quality management of human capital aiming to improve the company's internal performance and external implementation of the core business strategy. Companies with matrix structure focusing on realization and development of innovation and technologies for the uncertain market need to select thoroughly the approach to HR management system. Human resource management has a significant impact on the organization and use a variety of instruments such as corporate information systems to fulfill their functions and objectives. There are three approaches to strategic control management depending on major impact on the major interference in employee decision-making, development of skills and his integration into the business strategy. The mainstream research has focus only on the framework of strategic planning of HR and general productivity of firm, but not on features of organizational structure and corporate software capabilities for human capital. This study tackles the before mentioned challenges, typical for matrix organization, by using the HR control management tools and corporate information system. The detailed analysis of industry producing and selling electromotor and heating equipment in this master thesis provides the opportunity to improve system for HR control and displays its application in the ERP software. The results emphasize the sustainable role of matrix HR input control for creating of independent project teams for matrix structure who are able to respond to various uncertainties of the market and use their skills for improving performance. Corporate information systems can be integrated into input control system by means of output monitoring to regulate and evaluate the processes of teams, using key performance indicators and reporting systems.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In progressive companies succession planning plays a vital role in leadership development. Some companies have neither succession planning nor ways to fill leadership gaps. On the academic side of research, this Capstone Project focuses on the role of succession planning in leadership development through various approaches and theories. The purpose of this Capstone Project is to provide HR professionals with solid mechanisms for identifying and preparing leaders for leadership roles through proper succession mapping within a company. Through the analysis of case studies and research, recommendations are made on the formulation of a decision tree so that succession planning may take a new place in leadership development in an organization.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In February of 1968 a cooperative research project by the Iowa State Highway Commission (Project No. HR-136) and the University of Iowa, Iowa City, Iowa was initiated in order to determine experimentally the creep and shrinkage characteristics of lightweight-aggregate concrete used in the State of Iowa. This report is concerned with Phase 1 of the Project as described in the Prospectus for the project submitted in November of 1967: "The State Highway Commission is planning to conduct pilot studies in prestressed-lightweight structures fabricated with materials that are proposed for use in bridge structures in the near future. Thus, Phase will have as its immediate objective, investigating the materials to be used in the above mentioned pilot studies.” (1) The work described in this report was also carried out in conjunction with a second cooperative project: "Time-Dependent Camber and Deflection of Non-Composite and Composite Lightweight-Prestressed Concrete Beams" (Project No. HR-137).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

to compare the general and specific health-related quality of life (HRQoL) between the Intervention (IG) and Control (CG) groups of coronary artery disease patients after the implementation of Action Planning and Coping Planning strategies for medication adherence and to verify the relationship between adherence and HRQoL. this was a controlled and randomized study. the sample (n=115) was randomized into two groups, IG (n=59) and CG (n=56). Measures of medication adherence and general and specific HRQoL were obtained in the baseline and after two months of monitoring. the findings showed that the combination of intervention strategies - Action Planning and Coping Planning for medication adherence did not affect the HRQoL of coronary artery disease patients in outpatient monitoring.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

PURPOSE: To report an uncommon case of osteochondroma affecting the mandibular condyle of a young patient and to illustrate the important contributions of different imaging resources to the diagnosis and treatment planning of this lesion. CASE DESCRIPTION: A 24-year-old female patient with the chief complaint of an increasing facial asymmetry and pain in the left pre-auricular region, revealing a reduced mouth opening, mandibular deviation and posterior cross-bite over a period of 18 months. Panoramic radiography revealed an enlargement of the left condyle, whereas computed tomography (CT) sections and three-dimensional CT showed a well-defined bone growth arising from condylar neck. The scintigraphy exam showed an abnormal osteogenic activity in the left temporomandibular joint. The condyle was surgically removed and after 18 months follow-up the panoramic radiography and CT scans showed no signs of recurrence. CONCLUSION: Although osteochondroma is a benign bone tumor that rarely arises in cranial and maxillofacial region, it should be considered in the differential diagnosis of slow-growing masses of the temporomandibular area and the use of different imaging exams significantly contribute to the correct diagnosis and treatment planning of this pathological condition.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The implementation of confidential contracts between a container liner carrier and its customers, because of the Ocean Shipping Reform Act (OSRA) 1998, demands a revision in the methodology applied in the carrier's planning of marketing and sales. The marketing and sales planning process should be more scientific and with a better use of operational research tools considering the selection of the customers under contracts, the duration of the contracts, the freight, and the container imbalances of these contracts are basic factors for the carrier's yield. This work aims to develop a decision support system based on a linear programming model to generate the business plan for a container liner carrier, maximizing the contribution margin of its freight.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The HR Del nova remnant was observed with the IFU-GMOS at Gemini North. The spatially resolved spectral data cube was used in the kinematic, morphological, and abundance analysis of the ejecta. The line maps show a very clumpy shell with two main symmetric structures. The first one is the outer part of the shell seen in H alpha, which forms two rings projected in the sky plane. These ring structures correspond to a closed hourglass shape, first proposed by Harman & O'Brien. The equatorial emission enhancement is caused by the superimposed hourglass structures in the line of sight. The second structure seen only in the [O III] and [N II] maps is located along the polar directions inside the hourglass structure. Abundance gradients between the polar caps and equatorial region were not found. However, the outer part of the shell seems to be less abundant in oxygen and nitrogen than the inner regions. Detailed 2.5-dimensional photoionization modeling of the three-dimensional shell was performed using the mass distribution inferred from the observations and the presence of mass clumps. The resulting model grids are used to constrain the physical properties of the shell as well as the central ionizing source. A sequence of three-dimensional clumpy models including a disk-shaped ionization source is able to reproduce the ionization gradients between polar and equatorial regions of the shell. Differences between shell axial ratios in different lines can also be explained by aspherical illumination. A total shell mass of 9 x 10(-4) M(circle dot) is derived from these models. We estimate that 50%-70% of the shell mass is contained in neutral clumps with density contrast up to a factor of 30.