997 resultados para Geotechnical instrumentation


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The economic development of a region depends on the speed that people and goods can travel. The reduction of people and goods travel time can be achieved by planning smooth road layouts, which are obtained by crossing natural obstacles such as hills, by tunneling at great depths, and allowing the reduction of the road alignment length. The stress state in rock masses at such depths, either because of the overburden or due to the tectonic conditions of the rock mass induces high convergences of the tunnel walls. These high convergence values are incompatible with the supports structural performance installed in the excavation stabilization. In this article it is intended to evaluate and analyze some of the solutions already implemented in several similar geological and geotechnical situations, in order to establish a methodological principle for the design of the tunnels included in a highway section under construction in the region influenced by the Himalayas, in the state of Himachal Pradesh (India) and referenced by "four laning of Kiratpur to Ner Chowk section".

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Infraestrutura com mais de um século de história, o Porto de Leixões encontra-se em fase de renovação com a criação de um emblemático Edifício de Terminal de Cruzeiros. Obra de arquitetura arrojada, o edifício é implantado em condições geológico-geotécnicas adversas e na convivência com o efeito da água do mar e das respetivas marés. O presente relatório é relativo a um Estágio realizado na obra numa fase de execução dos trabalhos de fundações e de contenções periféricas (ensecadeira). Apresentam-se as soluções sugeridas em projeto, as soluções apresentadas inicialmente pelo construtor e as alternativas a estas, propostas já durante a obra. Descrevem-se as diferentes soluções, identificando os equipamentos, recursos humanos e procedimentos envolvidos. Comparam-se os respetivos rendimentos e custos. Apresenta-se o Plano de Instrumentação e de Monitorização implementado em obra. Descreve-se em pormenor o trabalho realizado pelo estagiário, em obra, no decurso do estágio.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação para obtenção do Grau de Doutor em Engenharia Física

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper highlights how transportation geotechnics can interact with transportation infrastructures and how through the planning, design, construction and maintenance can contribute to ensure solutions more safe, reliable and resilient in the future. In this context sustainable concepts are discussed and applied as best practices to preserve natural resources and assuring socio-economic and environment benefits for the society

Relevância:

20.00% 20.00%

Publicador:

Resumo:

OBJECTIVE: To assess the Dixtal DX2710 automated oscillometric device used for blood pressure measurement according to the protocols of the BHS and the AAMI. METHODS: Three blood pressure measurements were taken in 94 patients (53 females 15 to 80 years). The measurements were taken randomly by 2 observers trained to measure blood pressure with a mercury column device connected with an automated device. The device was classified according to the protocols of the BHS and AAMI. RESULT: The mean of blood pressure levels obtained by the observers was 148±38/93±25 mmHg and that obtained with the device was 148±37/89±26 mmHg. Considering the differences between the measurements obtained by the observer and those obtained with the automated device according to the criteria of the BHS, the following classification was adopted: "A" for systolic pressure (69% of the differences < 5; 90% < 10; and 97% < 15 mmHg); and "B" for diastolic pressure (63% of the differences < 5; 83% < 10; and 93% < 15 mmHg). The mean and standard deviation of the differences were 0±6.27 mmHg for systolic pressure and 3.82±6.21 mmHg for diastolic pressure. CONCLUSION: The Dixtal DX2710 device was approved according to the international recommendations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Transmission of Cherenkov light through the atmosphere is strongly influenced by the optical clarity of the atmosphere and the prevailing weather conditions. The performance of telescopes measuring this light is therefore dependent on atmospheric effects. This thesis presents software and hardware developed to implement a prototype sky monitoring system for use on the proposed next-generation gamma-ray telescope array, VERITAS. The system, consisting of a CCD camera and a far-infrared pyrometer, was successfully installed and tested on the ten metre atmospheric Cherenkov imaging telescope operated by the VERITAS Collaboration at the F.L. Whipple Observatory in Arizona. The thesis also presents the results of observations of the BL Lacertae object, 1ES1959+650, made with the Whipple ten metre telescope. The observations provide evidence for TeV gamma-ray emission from the BL Lacertae object, 1ES1959+650, at a level of more than 15 standard deviations above background. This represents the first unequivocal detection of this object at TeV energies, making it only the third extragalactic source seen at such levels of significance in this energy range. The flux variability of the source on a number of timescales is also investigated.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

OBJECT Monoenergetic imaging with dual-energy CT has been proposed to reduce metallic artifacts in comparison with conventional polychromatic CT. The purpose of this study is to systematically evaluate and define the optimal dual-energy CT imaging parameters for specific cervical spinal implant alloy compositions. METHODS Spinal fixation rods of cobalt-chromium or titanium alloy inserted into the cervical spine section of an Alderson Rando anthropomorphic phantom were imaged ex vivo with fast-kilovoltage switching CT at 80 and 140 peak kV. The collimation width and field of view were varied between 20 and 40 mm and medium to large, respectively. Extrapolated monoenergetic images were generated at 70, 90, 110, and 130 kiloelectron volts (keV). The standard deviation of voxel intensities along a circular line profile around the spine was used as an index of the magnitude of metallic artifact. RESULTS The metallic artifact was more conspicuous around the fixation rods made of cobalt-chromium than those of titanium alloy. The magnitude of metallic artifact seen with titanium fixation rods was minimized at monoenergies of 90 keV and higher, using a collimation width of 20 mm and large field of view. The magnitude of metallic artifact with cobalt-chromium fixation rods was minimized at monoenergies of 110 keV and higher; collimation width or field of view had no effect. CONCLUSIONS Optimization of acquisition settings used with monoenergetic CT studies might yield reduced metallic artifacts.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of this paper is to highlight scientific information resources that list journal and country rankings. These databases usually focus on the use of citation counts and number of publications to evaluate the interest, visibility and impact of research performance. The exposed resources are platforms that provide added value to authors improving their knowledge about research trends and also where to submit their papers.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Approach slab pavement at integral abutment (I-A) bridges are prone to settlement and cracking, which has been long recognized by the Iowa Department of Transportation (DOT). A commonly recommended solution is to integrally attach the approach slab to the bridge abutment. This study sought to supplement a previous project by instrumenting, monitoring, and analyzing the behavior of an approach slab tied to a integral abutment bridge. The primary objective of this investigation was to evaluate the performance of the approach slab. To satisfy the research needs, the project scope involved reviewing a similar previous study, implementing a health monitoring system on the approach slab, interpreting the data obtained during the evaluation, and conducting periodic visual inspections of the bridge and approach slab. Based on the information obtained from the testing, the following general conclusions were made: the integral connection between the approach slab and the bridge appears to function well with no observed distress at this location and no relative longitudinal movement measured between the two components; the measured strains in the approach slabs indicate a force exists at the expansion joint and should be taken into consideration when designing both the approach slab and the bridge and the observed responses generally followed an annual cyclic and/or short term cyclic pattern over time; the expansion joint at one side of the approach slab does not appear to be functioning as well as elsewhere; much larger frictional forces were observed in this study compared to the previous study.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document contains a discussion of the reasons why the project did not succeed. A detailed discussion of the steps taken by the Iowa Department of Transportation to make the experiment work are contained in this document, along with recommendations for future projects.