997 resultados para Costs assessments


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Farmers' exposure to pesticides is high in developing countries. As a result many farmers suffer from ill-health, both short and long term. Deaths are not uncommon. This paper addresses this issue. Field survey data from Sri Lanka are used to estimate farmers' expenditure on defensive behavior (DE) and to determine factors that influence DE. The avertive behavior approach is used to estimate costs. Tobit regression analysis is used to determine factors that influence DE. Field survey data show that farmers' expenditures on DE are low. This is inversely related to high incidence of ill health among farmers using pesticides.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Technology-based self-service (TBSS) enables consumers to complete services themselves using a technological interface. As evaluations of consumer satisfaction and commitment have typically focused on interpersonal interactions, the effect of TBSS on these is under researched . This paper explores the impact of TBSS on consumer satisfaction and on a multidimensional measure of consumer commitment.Data are collected from 241 hotel guests. The results suggest personal-service is more important for satisfaction and commitment. This has implications for marketing as the benefits of adopting TBSS are not clear. Multi-dimensional commitment provides some interesting findings and suggests the need for further research into TBSS and commitment.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Housing affordability is gaining increasing prominence in the Australian socioeconomic landscape, despite strong economic growth and prosperity. It is a major consideration for any new development. However, it is multi-dimensional, has many facets, is complex and interwoven. One factor widely held to impact housing affordability is holding costs. Although it is only one contributor, the nature and extent of its impact requires clarification. It is certainly more multifarious than simple calculation of the interest or opportunity cost of land holding. For example, preliminary analysis suggests that even small shifts in the regulatory assessment period can significantly affect housing affordability. Other costs associated with “holding” also impact housing affordability, however these costs cannot always be easily identified. Nevertheless it can be said that ultimately the real impact is felt by those whom can least afford it - new home buyers whom can be relatively easily pushed into the realms of un-affordability.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report presents the results of research projects conducted by The Australian Cooperative Research Centre for Construction Innovation, Queensland University of Technology, RMIT University, Queensland Government Department of Main Roads and Queensland Department of Public Works. The research projects aimed at developing a methodology for assessing variation and risk in investment in road network, including the application of the method in assessing road network performance and maintenance and rehabilitation costs for short- and long-term future investment.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Realistic estimates of short- and long-term (strategic) budgets for maintenance and rehabilitation of road assessment management should consider the stochastic characteristics of asset conditions of the road networks so that the overall variability of road asset data conditions is taken into account. The probability theory has been used for assessing life-cycle costs for bridge infrastructures by Kong and Frangopol (2003), Zayed et.al. (2002), Kong and Frangopol (2003), Liu and Frangopol (2004), Noortwijk and Frangopol (2004), Novick (1993). Salem 2003 cited the importance of the collection and analysis of existing data on total costs for all life-cycle phases of existing infrastructure, including bridges, road etc., and the use of realistic methods for calculating the probable useful life of these infrastructures (Salem et. al. 2003). Zayed et. al. (2002) reported conflicting results in life-cycle cost analysis using deterministic and stochastic methods. Frangopol et. al. 2001 suggested that additional research was required to develop better life-cycle models and tools to quantify risks, and benefits associated with infrastructures. It is evident from the review of the literature that there is very limited information on the methodology that uses the stochastic characteristics of asset condition data for assessing budgets/costs for road maintenance and rehabilitation (Abaza 2002, Salem et. al. 2003, Zhao, et. al. 2004). Due to this limited information in the research literature, this report will describe and summarise the methodologies presented by each publication and also suggest a methodology for the current research project funded under the Cooperative Research Centre for Construction Innovation CRC CI project no 2003-029-C.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the previous research CRC CI 2001-010-C “Investment Decision Framework for Infrastructure Asset Management”, a method for assessing variation in cost estimates for road maintenance and rehabilitation was developed. The variability of pavement strength collected from a 92km national highway was used in the analysis to demonstrate the concept. Further analysis was conducted to identify critical input parameters that significantly affect the prediction of road deterioration. In addition to pavement strength, rut depth, annual traffic loading and initial roughness were found to be critical input parameters for road deterioration. This report presents a method developed to incorporate other critical parameters in the analysis, such as unit costs, which are suspected to contribute to a certain degree to cost estimate variation. Thus, the variability of unit costs will be incorporated in this analysis. Bruce Highway located in the tropical east coast of Queensland has been identified to be the network for the analysis. This report presents a step by step methodology for assessing variation in road maintenance and rehabilitation cost estimates.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A shortage of affordable housing is a major problem in Australia today. This is mainly due to the limited supply of affordable housing that is provided by the non-government housing sector. Some private housing developers see the provision of affordable housing for lower income people as a high risk investment which offers a lower return than broader market-based housing. The scarcity of suitable land, a limited government ‘subsidy’, and increasing housing costs have not provided sufficient development incentives to encourage their investment despite the existing high demand for affordable housing. This study analyses the risk management process conducted by some private and not-for-profit housing providers in South East Queensland, and draws conclusions about the relationship between risk assessments/responses and past experiences. In-depth interviews of selected non-government housing providers have been conducted to facilitate an understanding of their approach to risk assessment/response in developing and in managing affordable housing projects. These developers use an informal risk management process as part of their normal business process in accordance with industry standards. A simple qualitative matrix has been used to analyse probability and impacts using a qualitative scale - low, medium and high. For housing providers who have considered investing in affordable housing but have not yet implemented any such projects, affordable housing development is seen as an opportunity that needs to be approached with caution. The risks associated with such projects and the levels of acceptance of these are not consistently identified by current housing providers. Many interviewees agree that the recognition of financial risk and the fear of community rejection of such housing projects have restrained them from committing to such investment projects. This study suggests that implementing improvements to the risk mitigation and management framework may assist in promoting the supply of affordable housing by non-government providers.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Aim To estimate the economic consequences of pressure ulcers attributable to malnutrition. Method Statistical models were developed to predict the number of cases of pressure ulcer, associated bed days lost and the dollar value of these losses in public hospitals in 2002/2003 in Queensland, Australia. The following input parameters were specified and appropriate probability distributions fitted • Number of at risk discharges per annum • Incidence rate for pressure ulcer • Attributable fraction of malnutrition in the development of pressure ulcer • Independent effect of pressure ulcer on length of hospital stay • Opportunity cost of hospital bed day One thousand random re-samples were made and the results expressed as (output) probabilistic distributions. Results The model predicts a mean 16060 (SD 5 671) bed days lost and corresponding mean economic cost of AU$12 968 668 (SD AU$4 924 148) (EUROS 6 925 268 SD 2 629 495; US$ 7 288 391 SD 2 767 371) of pressure ulcer attributable to malnutrition in 2002/2003 in public hospitals in Queensland, Australia. Conclusion The cost of pressure ulcer attributable to malnutrition in bed days and dollar terms are substantial. The model only considers costs of increased length of stay associated with pressure ulcer and not other factors associated with care.