933 resultados para Construction work


Relevância:

70.00% 70.00%

Publicador:

Resumo:

The paper charts the history and development of the Hong Kong Housing Department (HKHD) Performance Assessment Scoring System (PASS) from 1990 to the present day and examines its effect on facilitating change to the quality of construction work of building contractors engaged in the production of public sector housing projects Hong Kong. The paper builds partly on empirical research carried out by the author as part of a doctoral thesis from 2000 to 2005, on experiential knowledge and also on some relevant case studies. The outcomes from this earlier research and validation of PASS based on results derived from the system since the research was originally undertaken are of benefit to practitioners and academics working and studying in the areas of performance assessment and organisational culture and change. The conclusions presented in the paper further underpin the connection established in previous research between strong organisational culture and project and corporate success. Organisational culture was measured using a survey instrument originally developed by Denison and Neale (1994), adapted for the environment of the study, and corporate success was measured by the PASS system mentioned above. The major results of the original study indicate that there is significant linkage between strong organisational cultures and business success and the detailed findings were that, (1) strong organisational culture was positively associated a high level of company effectiveness, (2) a high level of company effectiveness was positively associated with the cultural traits of ‘consistency’, ‘adaptability’ and ‘mission’, and (3) a high level of company effectiveness was positively associated with the combined cultural traits represented by the dimensions of ‘external focus’ and ‘stable culture’. Several opportunities to take forward this research have been identified, including extending the study to other countries and also longitudinally re-evaluating some of the original case studies to ascertain how organisational cultures have changed or further developed in relation to the changing construction climate in Hong Kong.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The inherent uncertainty and complexity of construction work make construction planning a particularly difficult task for project managers due to the need to anticipate and visualize likely future events. Conventional computer-assisted technology can help but is often limited to the constructability issues involved. Virtual prototyping, however, offers an improved method through the visualization of construction activities by computer simulation — enabling a range of ‘what-if’ questions to be asked and their implications on the total project to be investigated. This paper describes the use of virtual prototyping to optimize construction planning schedules by analyzing resource allocation and planning with integrated construction models, resource models, construction planning schedules and site-layout plans. A real-life case study is presented that demonstrates the use of a virtual prototyping enabled resource analysis to reallocate space, logistic on access road and arrange tower cranes to achieve a 6-day floor construction cycle.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Contractual relationships have become increasingly strained in recent years in the construction industry result in the use of the judicial system for the settlement of contractual disagreements. Why is this so? Evidence from anecdotes suggest that the lack of capacity amongst owners and contractors to carry out a contract using a good practice approach during the construction of a project contribute to the occurrence of conflicts, losses, deficient contractual relationships and poor performance of the construction work. Recognizing that current forms of contract in use today perpetuate a legacy of construction problems, we are conducting explanatory research to examine whether the widely publicized benefits of New Engineering Contract (NEC) could be realized in the Australian construction industry. This paper outlines a research agenda that will help shed light on how contract forms are able to be used as a mechanism to ensure construction projects are delivered successfully whilst also meeting the goals of multiple stakeholders. Understanding the Critical Success Factors (CSFs), commonly used construction contracts and the NEC system can help us address some of these issues. However, there are gaps in the validation of the benefits of NEC and its link with project success. We identify some of these gaps and propose a methodology by which to gain insights into this phenomenon. Keywords: Project Success, Construction Contracting, New Engineering Contract (NEC)

Relevância:

70.00% 70.00%

Publicador:

Resumo:

In general, the performance of construction projects, including their sustainability performance, does not meet optimal expectations. One aspect of this is the performance of the participants who are independent and make a significance impact on overall project outcomes. Of these participants, the client is traditionally the owner of the project, the architect or engineer is engaged as the lead designer and a contractor is selected to construct the facilities. Generally, the performance of the participants is gauged by considering three main factors, namely, time, cost and quality. As the level of satisfaction is a subjective issue, it is rarely used in the performance evaluation of construction work. Recently, various approaches to the measurement of satisfaction have been made in an attempt to determine the performance of construction project outcomes - for instance, client satisfaction, customer satisfaction, contractor satisfaction, occupant satisfaction and home buyer satisfaction. These not only identify the performance of the construction project but are also used to improve and maintain relationships. In addition, these assessments are necessary for the continuous improvement and enhanced cooperation of participants. The measurement of satisfaction levels primarily involves expectations and perceptions. An expectation can be regarded as a comparative standard of different needs, motives and beliefs, while a perception is a subjective interpretation that is influenced by moods, experiences and values. This suggests that the disparity between perceptions and expectations may possibly be used to represent different levels of satisfaction. However, this concept is rather new and in need of further investigation. This chapter examines the methods commonly practised in measuring satisfaction levels today and the advantages of promoting these methods. The results provide a preliminary review of the advantages of satisfaction measurement in the construction industry and recommendations are made concerning the most appropriate methods to use in identifying the performance of project outcomes.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

It is recognized that, in general, the performance of construction projects does not meet optimal expectations. One aspect of this is the performance of each participant, which is interdependent and makes a significance impact on overall project outcomes. Of these, the client is traditionally the owner of the project, the architect or engineer is engaged as the lead designer and a contractor is selected to construct the facilities. Generally, the performance of the participants is gauged by considering three main factors, namely time, cost and quality. As the level of satisfaction is a subjective measurement, it is rarely used in the performance evaluation of construction work. Recently, various approaches to the measurement of satisfaction have been made in attempting to determine the performance of construction project outcomes – for instance client satisfaction, consultant satisfaction, contractor satisfaction, customer satisfaction and home buyer satisfaction. These not only identify the performance of the construction project, but are also used to improve and maintain relationships. In addition, these assessments are necessary for continuous improvement and enhanced cooperation between participants. The measurement of satisfaction levels primarily involves expectations and perceptions. An expectation can be regarded as a comparison standard of different needs, motives and beliefs, while a perception is a subjective interpretation that is influenced by moods, experiences and values. This suggests that the disparity between perceptions and expectations may be used to represent different levels of satisfaction. However, this concept is rather new and in need of further investigation. This paper examines the current methods commonly practiced in measuring satisfaction level and the advantages of promoting these methods. The results provided are a preliminary review of the advantages of satisfaction measurement in the construction industry and recommendations are made concerning the most appropriate methods for use in identifying the performance of project outcomes.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Understanding the motion characteristics of on-site objects is desirable for the analysis of construction work zones, especially in problems related to safety and productivity studies. This article presents a methodology for rapid object identification and tracking. The proposed methodology contains algorithms for spatial modeling and image matching. A high-frame-rate range sensor was utilized for spatial data acquisition. The experimental results indicated that an occupancy grid spatial modeling algorithm could quickly build a suitable work zone model from the acquired data. The results also showed that an image matching algorithm is able to find the most similar object from a model database and from spatial models obtained from previous scans. It is then possible to use the matched information to successfully identify and track objects.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Design-build (DB) system is well-known to be a popular and effective delivery method of construction work worldwide. It has been demonstrated as superior to the traditional delivery system in regards to time and cost performance. However, it suffers a major flaw, in that the performance of project quality cannot be guaranteed. This paper aims to investigate the underlying factors attributing to the poor quality performance of design-build projects in Queensland. Five major factors were first identified through a comprehensive literature review, which relate to (1) project briefing and scope definition, (2) client’s role and responsibility, (3) procurement selection, (4) contractor’s incentive, and (5) design document quality. A questionnaire survey with 127 DB professionals was conducted to determine how these factors affect various quality criteria, i.e. functional quality, architectural quality, technical quality, workmanship quality, client satisfaction and overall quality. With the architectural quality reduced greatly, the research findings reveal that the DB projects in Queensland have the reduced overall quality compared with traditional projects. The impacts of different factors on the quality performance of DB projects have been closely examined and summarized. The research findings will facilitate project stakeholder’s better understanding of the delivery process of the DB system and provide guidelines to improve the quality performance.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Work in the Australian construction industry is fraught with risk and the potential for serious harm. The industry is consistently placed within the three most hazardous industries to work along with other industries such as mining and transport (National Occupational Health and Safety Commission, 2003). In the 2001 to 2002 period, construction work killed 39 people and injured 13,250 more. Hence, more effort is required to reduce the injury rate and maximise the value of the rehabilitation/back-to-work process.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Estimated 638,400 persons suffered a work-related injury or illness in 2009-2010 and 337 lost their lives as a result in 2009-2010. In 2013-2014, there were 186 fatalities with 29 (16%) occurring in construction. Very little is known about what proportion of accidents are directly attributable to the effects of AOD. Anecdotal evidence highlights issues of AOD and its association with safety risk on construction sites. Research Objective: • To scientifically evaluate the relationship between the use of AOD and the safety impacts within the Australian construction industry to engender a cultural change in the workforce • A nationally consistent and collaborative approach involving government, employers and employees, unions and other key industry stakeholders

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Construction work taking place at the Glenridge Campus.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Construction work taking place inside the Glenridge Campus.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Construction work taking placce at the site of the Aquatic Centre.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Construction work continuing on the Decew Residence.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

This picture shows construction work underway on the Thistle Complex. The groundwork, supporting pillars, and preliminary work on the concrete walls can be seen. The most notable feature is the exposed foundation of the Thistle Theatre to the left. The adjacent lecture halls are also taking form to the right.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

This picture shows construction work underway on the Thistle Complex. The groundwork, supporting pillars, and concrete walls can be seen. The most notable feature is the exposed foundation of the Thistle Theatre to the left. The adjacent lecture halls are also taking form to the right.