857 resultados para Arachis major
Resumo:
This paper reports on a study of ERP lifecycle major issues from the perspectives of individuals with substantial and diverse involvement with SAP Financials in Queensland Government. A survey was conducted of 117 ERP system project participants in five closely related state government agencies. A modified Delphi technique identified, rationalized and weighed perceived major issues in ongoing ERP life cycle implementation, management and support. The five agencies each implemented SAP Financials simultaneously using a common implementation partner. The three survey rounds of the Delphi technique, together with coding and synthesizing procedures, resulted in a set of 10 major issue categories with 38 sub-issues. Relative scores of issue importance are compared across government agencies, roles (client vs implementation partner) and organizational levels (strategic, technical and operational). Study findings confirm the importance of this finer partitioning of the data, and distinctions identified reflect the circumstances of ERP lifecycle implementation, management and support among the stakeholder groups. The study findings should also be of interest to stakeholders who seek to better understand the issues surrounding ERP systems and to better realise the benefits of ERP.
Resumo:
Major infrastructure assets are often governed by a mix of public and private organizations, each fulfilling a specific and separate role i.e. policy, ownership, operation or maintenance. This mix of entities is a legacy of Public Choice Theory influenced NPM reforms of the late 20th century. The privatization of the public sector has resulted in agency theory based ‘self-interest’ relationships and governance arrangements for major infrastructure assets which emphasize economic efficiency but which do not do not advance non-economic public values and the collective Public Interest. The community is now requiring that governments fulfill their stewardship role of also satisfying non-economic public values such as sustainability and intergenerational responsibility. In the 21st century governance arrangements which minimize individual self-interest alone and look to also pursue the interests of other stakeholders have emerged. Relational contracts, Public-Private Partnerships (PPP’s) and hybrid mixes of organizations from the state, market and network modes (Keast et al 2006) provide options for governance which better meet the interests of contractors, government and the community there is emerging a body of research which extends the consideration of the immediate governance configuration to the metagovernance environment constituted by hierarchy, regulation, industry standards, trust, culture and values. Stewardship theory has reemerged as a valuable aid in the understanding of the features of governance configurations which establish relationships between principal and agent which maximize the agent acting in the interests of the principal, even to the detriment of the agent. This body of literature suggests that an improved stewardship outcome from infrastructure governance configurations can be achieved by the application of the emerging options as to the immediate governance configuration, and the surrounding metagovernance environment. Stewardship theory provides a framework for the design of the relationships within that total governance environment, focusing on the achievement of a better, complete stewardship outcome. This paper explores the directions future research might take in seeking to improve the understanding of the design of the governance of major, critical infrastructure assets.
Resumo:
The learner licence is an important component of the graduated driver licensing system. This research describes the driving and licensing experiences of learner drivers in Queensland and New South Wales licensed prior to the changes made to the system in mid-2007. The sample consisted of 392 participants who completed a telephone interview just after they obtained their provisional licence. The results suggest that learner drivers in the two states had many similar experiences when they were obtaining a learner licence. However, once a learner licence was obtained, there were differences in the amount of practice, the supervisor learners practised with, the type of vehicle they used and the amount of unlicensed driving. This paper provides important baseline descriptive data that can be used to measure the impact of the changes that were introduced to the learner licence phase in mid-2007 in both of these states.
Resumo:
The innovation diffusion and knowledge management literature strongly supports the importance of communities of practice (COP) for enabling knowledge about how to use and adopt innovation initiatives. One of the most powerful tools for innovation diffusion is word-of-mouth wisdom from committed individuals who mentor and support each other. Close proximity for face-to-face interaction is highly effective, however, many organisations are geographically dispersed with projects being virtual linked sub-organisations using ICT to communicate. ICT has also introduced a useful facilitating technology for developing knowledge networks. This paper presents findings from a research program concentrating on ICT innovation diffusion in the Australian construction industry. One way in which ICT diffusion is taking place was found to be through within-company communities of practice. We undertook in-depth unstructured interviews with three of the major 10 to 15 contractors in Australia to discuss their ICT diffusion strategies. We discovered that in all three cases,within company networked communities of practice was a central strategy. Further, effective diffusion of ICT groupware tools can be critical in developing COP where they are geographically dispersed.
Resumo:
Objective - We report the first randomised controlled trial (RCT) using a combination of St. John’s wort (SJW) and Kava for the treatment of major depressive disorder (MDD) with comorbid anxiety. Methods - Twenty-eight adults with MDD and co-occurring anxiety were recruited for a double-blind RCT. After a placebo run-in of 2 weeks, the trial had a crossover design testing SJW and Kava against placebo over two controlled phases, each of 4 weeks. The primary analyses used intention-to-treat and completer analyses. Results - On both intention-to-treat ( p¼0.047) and completer analyses ( p¼0.003), SJW and Kava gave a significantly greater reduction in self-reported depression on the Beck Depression Inventory (BDI-II) over placebo in the first controlled phase. However, in the crossover phase, a replication of those effects in the delayed medication group did not occur. Nor were there significant effects on anxiety or quality of life. Conclusion - There was some evidence of antidepressant effects using SJW and Kava in a small sample with comorbid anxiety. Possible explanations for the absence of anxiolysis may include a potential interaction with SJW, the presence of depression, or an inadequate dose of Kava.
Resumo:
A literature review was conducted to examine the evidence for nutritional interventions in depression. It revealed a number of significant conclusions. Interestingly, more positive clinical trials were found to support adjuvant, rather than monotherapeutic, use of nutrients to treat depression. Much evidence exists in the area of adjuvant application of folic acid, S-adenosyl-methionine, omega-3, and L-tryptophan with antidepressants. Current evidence does not support omega-3 as an effective monotherapy to treat depression. However, this may be due, at least in part, to olive oil being used as the control intervention, some studies using docosahexaenoic acid alone or a higher docosahexaenoic acid to eicosapentaenoic acid ratio, and significant heterogeneity regarding depressive populations. Nevertheless, adjunctive prescription of omega-3 with antidepressants, or in people with dietary deficiency, may be beneficial. Inositol lacks evidence as an effective antidepressant and cannot be currently recommended. Evidence on the use of L-trytophan for depression is inconclusive and additional studies utilizing a more robust methodology are required.
Resumo:
The establishment of corporate objectives regarding economic, environmental, social, and ethical responsibilities, to inform business practice, has been gaining credibility in the business sector since the early 1990’s. This is witnessed through (i) the formation of international forums for sustainable and accountable development, (ii) the emergence of standards, systems, and frameworks to provide common ground for regulatory and corporate dialogue, and (iii) the significant quantum of relevant popular and academic literature in a diverse range of disciplines. How then has this move towards greater corporate responsibility become evident in the provision of major urban infrastructure projects? The gap identified, in both academic literature and industry practice, is a structured and auditable link between corporate intent and project outcomes. Limited literature has been discovered which makes a link between corporate responsibility; project performance indicators (or critical success factors) and major infrastructure provision. This search revealed that a comprehensive mapping framework, from an organisation’s corporate objectives through to intended, anticipated and actual outcomes and impacts has not yet been developed for the delivery of such projects. The research problem thus explored is ‘the need to better identify, map and account for the outcomes, impacts and risks associated with economic, environmental, social and ethical outcomes and impacts which arise from major economic infrastructure projects, both now, and into the future’. The methodology being used to undertake this research is based on Checkland’s soft system methodology, engaging in action research on three collaborative case studies. A key outcome of this research is a value-mapping framework applicable to Australian public sector agencies. This is a decision-making methodology which will enable project teams responsible for delivering major projects, to better identify and align project objectives and impacts with stated corporate objectives.
Brain-derived neurotrophic factor (BDNF) gene : no major impact on antidepressant treatment response
Resumo:
The brain-derived neurotrophic factor (BDNF) has been suggested to play a pivotal role in the aetiology of affective disorders. In order to further clarify the impact of BDNF gene variation on major depression as well as antidepressant treatment response, association of three BDNF polymorphisms [rs7103411, Val66Met (rs6265) and rs7124442] with major depression and antidepressant treatment response was investigated in an overall sample of 268 German patients with major depression and 424 healthy controls. False discovery rate (FDR) was applied to control for multiple testing. Additionally, ten markers in BDNF were tested for association with citalopram outcome in the STAR*D sample. While BDNF was not associated with major depression as a categorical diagnosis, the BDNF rs7124442 TT genotype was significantly related to worse treatment outcome over 6 wk in major depression (p=0.01) particularly in anxious depression (p=0.003) in the German sample. However, BDNF rs7103411 and rs6265 similarly predicted worse treatment response over 6 wk in clinical subtypes of depression such as melancholic depression only (rs7103411: TT
Resumo:
Against a background of already thin markets in some sectors of major public sector infrastructure in Australia and the desire of Australian federal government to leverage private finance, concerns about ensuring sufficient levels of competition are prompting federal government to seek new sources of in-bound Foreign Direct Income. The aim of this paper is to justify and develop a means to deploying the eclectic paradigm of internationalisation that forms part of an Australian federally funded research project designed to explain the determinants of multinational contractors' willingness to bid for Australian public sector major infrastructure projects. Despite the dominance of the eclectic paradigm as a theory of internationalisation for over two decades, it has seen limited application in terms of multinational construction. It is expected that the research project will be the first empirical study to deploy the eclectic paradigm to inbound FDI to Australia whilst using the dominant economic theories advocated for use within the eclectic paradigm. Furthermore, the research project is anticipated to yield a number of practical benefits. These include estimates of the potential scope to attract more multinational contractors to bid for Australian public sector infrastructure, including the nature and extent to which this scope can be influenced by Australian governments responsible for the delivery of infrastructure. On the other hand, the research is also expected to indicate the extent to which indigenous and other multinational contractors domiciled in Australia are investing in special purpose technology and achieving productivity gains relative to foreign multinational contractors.
Resumo:
The significant challenge faced by government in demonstrating value for money in the delivery of major infrastructure resolves around estimating costs and benefits of alternative modes of procurement. Faced with this challenge, one approach is to focus on a dominant performance outcome visible on the opening day of the asset, as the means to select the procurement approach. In this case, value for money becomes a largely nominal concept and determined by selected procurement mode delivering, or not delivering, the selected performance outcome, and notwithstanding possible under delivery on other desirable performance outcomes, as well as possibly incurring excessive transaction costs. This paper proposes a mind-set change in this particular practice, to an approach in which the analysis commences with the conditions pertaining to the project and proceeds to deploy transaction cost and production cost theory to indicate a procurement approach that can claim superior value for money relative to other competing procurement modes. This approach to delivering value for money in relative terms is developed in a first-order procurement decision making model outlined in this paper. The model developed could be complementary to the Public Sector Comparator (PSC) in terms of cross validation and the model more readily lends itself to public dissemination. As a possible alternative to the PSC, the model could save time and money in preparation of project details to lesser extent than that required in the reference project and may send a stronger signal to the market that may encourage more innovation and competition.