907 resultados para Airport buildings.
Resumo:
Oporto Airport (OPO) is a success story among European regional airports. This success is expressed, among other ways, in the rapid expansion of routes and the strong growth in demand, as well as in the recognition of the airport’s quality by its users. Over the past decade, the volume of traffic increased by almost 3.4 million passengers, from the 2.6 million recorded in 2002 to over 6 million in 2012. In this paper, we analyse some of the factors that influenced the success of Oporto Airport, namely the expansion of capacity and improvements to infrastructure, the increase in the number of routes and the increased demand in response to the new capacities of this airport-airlines set. Particular emphasis is given to the role of low cost carriers (LCC) in the growth of Oporto Airport and to strategies of attracting more traffic. Some of the main opportunities and challenges that this airport will face in the coming years are also discussed.
Resumo:
This paper studies the application of commercial biocides to old maritime pine timber structures (Pinus pinaster Ait.) that have previously been impregnated with other products. A method was developed in the laboratory to be used in situ to determine the impregnation depth achieved by a new generation biocide product applied to timber from an old building. This timber had once been treated with an unknown product difficult to characterize without extensive analysis. The test was initially developed in laboratory conditions and later tested on elements of the roof structure of an 18th century building. In both cases the results were promising and mutually consistent with penetration depths for some treatments reaching 2.0 cm. The application in situ proved the tests viability and simplicity of execution giving a clear indication on the feasibility of possible re-treatments.
Resumo:
O presente relatório de estágio encontra-se inserido no âmbito do Trabalho Final de Mestrado, da área de especialização de Edificações, relativo ao curso de Engenharia Civil, do Instituto Superior de Engenharia de Lisboa, sobre a execução de Pré-esforço em Edifícios e Obras de Arte. O estágio foi desenvolvido na empresa VSL Sistemas Portugal S.A. - Préesforço, Equipamento e Montagens e teve como objectivo o acompanhamento da subempreitada de aplicação e execução de pré-esforço para três entidades: - Agrupamento complementar de empresas Teixeira Duarte / Zagope - Viaduto de Coina 1; - Lena Construções - Pontão de Coina; - BRITALAR - Hotel Tryp Aeroporto Lisboa. O estágio realizou-se junto do Departamento de Produção, ao nível do acompanhamento dos trabalhos em obra e trabalho administrativo inerente ao mesmo. O objectivo inicial do estágio foi o de interpretar as peças escritas e desenhadas relacionando-as com a aplicação do pré-esforço em obra, conhecer as técnicas e materiais a aplicar nas diferentes fases, relacionando assim, a sua utilização com a prevenção de eventuais patologias.
Impact of design options in zero energy building conception: the case of large buildings in Portugal
Resumo:
The new recast of Directive 2010/31/EU in order to implement the new concept NZEB in new buildings, is to be fully respected by all Member States, and is revealed as important measure to promote the reduction of energy consumption of buildings and encouraging the use of renewable energy. In this study, it was tested the applicability of the nearly zero energy building concept to a big size office building and its impact after a 50-years life cycle span.
Resumo:
Dissertação apresentada na faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para a obtenção do grau de Mestre em Engenharia Electrotécnica e de Computadores
Resumo:
Este artigo apresenta alguns dos benefícios e a aplicabilidade da automação predial e residencial, cuja denominação atual e Domótica. Esta tecnologia permite a integração dos serviços e tecnologias, aplicados a residências, escritórios, flats, apartamentos e casas com o propósito de automatizá-los buscando sempre como resultado principal um maior conforto, economia de energia eletrica, redução no consumo de recursos hídricos, segurança dos usuários e um gerenciamento mais centralizado e efetivo, integrando todas as soluções de automação. Serão apresentadas as varias classes de aplicação para a criação dos chamados “prédios inteligentes”, assim como as diversas tecnologias desenvolvidas para esta finalidade
Resumo:
This project aimed to create a communication and interaction channel between Madeira Airport and its passengers. We used the pre-existent touch enabled screens at the terminal since their potential was not being utilised to their full capacity. To achieve our goal, we have followed an agile strategy to create a testable prototype and take advantages of its results. The developed prototype is based on a plugin architecture turning it into a maintainable and highly customisable system. The collected usage data suggests that we have achieved the initially defined goals. There is no doubt that this new interaction channel is an improvement regarding the provided services and, supported by the usage data, there is an opportunity to explore additional developments to the channel.
Resumo:
A very important part of the globally produced energy is consumed in buildings, being an important share frequently used in the HVAC systems. These ones are increasing both in performance and in complexity, taking advantage from the use of the recent advances in mechanical and power electronic devices, particularly in the speed variation field. However the improved efficiency only occurs while the HVAC unit is working in the conditions specified by the manufacturer, otherwise the energy consumption raises to values considerably higher than the nominal ones. The adequate maintenance enforces the system to run on its nominal performance and the contrary has undesirable impact both in the performance and in the system expected life time. Therefore, HVAC field maintenance assumes a very important role in the global building sustainability concept. This work presents some results of an incorrect use of HVAC and the associated electric energy overconsumption that can assume values 50% higher than those that occur when the installation is operated according to the adequate maintenance plan.
Resumo:
The Azores archipelago is a zone with a vast cultural heritage, presenting a building stock mainly constructed in traditional stone masonry. It is known that this type of construction exhibits poor behaviour under seismic excitations; however it is extensively used in seismic prone areas, such as this case. The 9th of July of 1998 earthquake was the last seismic event in the islands, leaving many traditional stone constructions severely damaged or totally destroyed. This scenario led to an effort by the local government of improving the seismic resistance of these constructions, with the application of several reinforcement techniques. This work aims to study some of the most used reinforcement schemes after the 1998 earthquake, and to assess their effectiveness in the mitigation of the construction’s seismic vulnerability. A brief evaluation of the cost versus benefit of these retrofitting techniques is also made, seeking to identify those that are most suitable for each building typology. Thus, it was sought to analyze the case of real structures with different geometrical and physical characteristics, by establishing a comparison between the seismic performance of reinforced and non-reinforced structures. The first section contains the analysis of a total of six reinforcement scenarios for each building chosen. Using the recorded 1998 earthquake accelerograms, a linear time-history analysis was performed for each reinforcement scenario. A comparison was then established between the maximum displacements, inter-storey drift and maximum stress obtained, in order to evaluate the global seismic response of each reinforced structure. In the second part of the work, the examination of the performance obtained in the previous section, in relation to the cost of implementing each reinforcement technique, allowed to draw conclusions concerning the viability of implementing each reinforcement method, based on the book value of the buildings in study.
Resumo:
Dissertation submitted in partial fulfillment of the requirements for the Degree of Master of Science in Geospatial Technologies.
Resumo:
Dissertation submitted in partial fulfillment of the requirements for the Degree of Master of Science in Geospatial Technologies.
Resumo:
Dissertation submitted in partial fulfillment of the requirements for the Degree of Master of Science in Geospatial Technologies.
Resumo:
International Conference Durable Structures: from construction to rehabilitation. Lisbon, LNEC, 31 May-1 June 2012