877 resultados para buried infrastructure


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Underground tunnels are vulnerable to terrorist attacks which can cause collapse of the tunnel structures or at least extensive damage, requiring lengthy repairs. This paper treats the blast impact on a reinforced concrete segmental tunnel buried in soil under a number of parametric conditions; soil properties, soil cover, distance of explosive from the tunnel centreline and explosive weight and analyses the possible failure patterns. A fully coupled Fluid Structure Interaction (FSI) technique incorporating the Arbitrary Lagrangian-Eulerian (ALE) method is used in this study. Results indicate that the tunnel in saturated soil is more vulnerable to severe damage than that buried in either partially saturated soil or dry soil. The tunnel is also more vulnerable to surface explosions which occur directly above the centre of the tunnel than those that occur at any equivalent distances in the ground away from the tunnel centre. The research findings provide useful information on modeling, analysis, overall tunnel response and failure patterns of segmented tunnels subjected to blast loads. This information will guide future development and application of research in this field.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Typically only a limited number of consortiums are able to competitively bid for Public Private Partnership (PPP) projects. Consequently, this may lead to oligopoly pricing constraints and ineffective competition, thus engendering ex ante market failure. In addressing this issue, this paper aims to determine the optimal number of bidders required to ensure a healthy level of competition is available to procure major infrastructure projects. The theories of Structure-Conduct-Performance (SCP) paradigm; Game Theory and Auction Theory and Transaction Cost Economics are reviewed and discussed and used to produce an optimal level of competition for major infrastructure procurement, that prevents market failure ex ante (lack of competition) and market failure ex post (due to asymmetric lock-in).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Public-Private Partnerships (PPP) are established globally as an important mode of procurement and the features of PPP, not least of which the transfer of risk, appeal to governments and particularly in the current economic climate. There are many other advantages of PPP that are claimed as outweighing the costs of PPP and affording Value for Money (VfM) relative to traditionally financed projects or non-PPP. That said, it is the case that we lack comparative whole-life empirical studies of VfM in PPP and non-PPP. Whilst we await this kind of study, the pace and trajectory of PPP seem set to continue and so in the meantime, the virtues of seeking to improve PPP appear incontrovertible. The decision about which projects, or parts of projects, to offer to the market as a PPP and the decision concerning the allocation or sharing risks as part of engagement of the PPP consortium are among the most fundamental decisions that determine whether PPP deliver VfM. The focus in the paper is on latter decision concerning governments’ attitudes towards risk and more specifically, the effect of this decision on the nature of the emergent PPP consortium, or PPP model, including its economic behavior and outcomes. This paper presents an exploration into the extent to which the seemingly incompatible alternatives of risk allocation and risk sharing, represented by the orthodox/conventional PPP model and the heterodox/alliance PPP model respectively, can be reconciled along with suggestions for new research directions to inform this reconciliation. In so doing, an important step is taken towards charting a path by which governments can harness the relative strengths of both kinds of PPP model.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The network scenario is that of an infrastructure IEEE 802.11 WLAN with a single AP with which several stations (STAs) are associated. The AP has a finite size buffer for storing packets. In this scenario, we consider TCP controlled upload and download file transfers between the STAs and a server on the wireline LAN (e.g., 100 Mbps Ethernet) to which the AP is connected. In such a situation, it is known (see, for example, (3), [9]) that because of packet loss due to finite buffers at the Ap, upload file transfers obtain larger throughputs than download transfers. We provide an analytical model for estimating the upload and download throughputs as a function of the buffer size at the AP. We provide models for the undelayed and delayed ACK cases for a TCP that performs loss recovery only by timeout, and also for TCP Reno.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Improved information on the product quality of the plantation resource is needed to allow businesses to consider investing in the development of value-adding processing facilities. These facilities are likely to require customised design that optimises the utilisation of future small diameter plantation hardwood logs. This log resource will become available as wood supply in Queensland transitions from native forests to 100% from sustainable plantations. This resource will be controlled by plantations established prior to 2000. A survey of the three main growers (former Forest Enterprises Australia Pty Ltd, former Forestry Corporation of New South Wales, Hancock Queensland Plantation Pty Ltd) revealed that C. citriodora subsp.variegata – CCV (28.0%), Eucalyptus dunnii (27.5%), E. pilularis (23.0%), E. grandis (11.3%) and E. cloeziana –GMS (7.1%) were the most widely planted species in the southern Queensland and northern New South Wales subtropical hardwood estate and would potentially dominate the supply of plantation hardwoods to sawmill processing facilities.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Digital image

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Major infrastructure and construction (MIC) projects are those with significant traffic or environmental impact, of strategic and regional significance and high sensitivity. The decision making process of schemes of this type is becoming ever more complicated, especially with the increasing number of stakeholders involved and their growing tendency to defend their own varied interests. Failing to address and meet the concerns and expectations of stakeholders may result in project failures. To avoid this necessitates a systematic participatory approach to facilitate decision-making. Though numerous decision models have been established in previous studies (e.g. ELECTRE methods, the analytic hierarchy process and analytic network process) their applicability in the decision process during stakeholder participation in contemporary MIC projects is still uncertain. To resolve this, the decision rule approach is employed for modeling multi-stakeholder multi-objective project decisions. Through this, the result is obtained naturally according to the “rules” accepted by any stakeholder involved. In this sense, consensus is more likely to be achieved since the process is more convincing and the result is easier to be accepted by all concerned. Appropriate “rules”, comprehensive enough to address multiple objectives while straightforward enough to be understood by multiple stakeholders, are set for resolving conflict and facilitating consensus during the project decision process. The West Kowloon Cultural District (WKCD) project is used as a demonstration case and a focus group meeting is conducted in order to confirm the validity of the model established. The results indicate that the model is objective, reliable and practical enough to cope with real world problems. Finally, a suggested future research agenda is provided.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Distributed Network Protocol v3.0 (DNP3) is one of the most widely used protocols to control national infrastructure. The move from point-to-point serial connections to Ethernet-based network architectures, allowing for large and complex critical infrastructure networks. However, networks and con- figurations change, thus auditing tools are needed to aid in critical infrastructure network discovery. In this paper we present a series of intrusive techniques used for reconnaissance on DNP3 critical infrastructure. Our algorithms will discover DNP3 outstation slaves along with their DNP3 addresses, their corresponding master, and class object configurations. To validate our presented DNP3 reconnaissance algorithms and demonstrate it’s practicality, we present an implementation of a software tool using a DNP3 plug-in for Scapy. Our implementation validates the utility of our DNP3 reconnaissance technique. Our presented techniques will be useful for penetration testing, vulnerability assessments and DNP3 network discovery.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Prediction of thermodynamic parameters of protein-protein and antigen-antibody complex formation from high resolution structural parameters has recently received much attention, since an understanding of the contributions of different fundamental processes like hydrophobic interactions, hydrogen bonding, salt bridge formation, solvent reorganization etc. to the overall thermodynamic parameters and their relations with the structural parameters would lead to rational drug design. Using the results of the dissolution of hydrocarbons and other model compounds the changes in heat capacity (DeltaCp), enthalpy (DeltaH) and entropy (DeltaS) have been empirically correlated with the polar and apolar surface areas buried during the process of protein folding/unfolding and protein-ligand complex formation. In this regard, the polar and apolar surfaces removed from the solvent in a protein-ligand complex have been calculated from the experimentally observed values of changes in heat capacity (DeltaCp) and enthalpy (DeltaH) for protein-ligand complexes for which accurate thermodynamic and high resolution structural data are available, and the results have been compared with the x-ray crystallographic observations. Analyses of the available results show poor correlation between the thermodynamic and structural parameters. Probable reasons for this discrepancy are mostly related with the reorganization of water accompanying the reaction which is indeed proven by the analyses of the energetics of the binding of the wheat germ agglutinin to oligosaccharides.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The network scenario is that of an infrastructure IEEE 802.11 WLAN with a single AP with which several stations (STAs) are associated. The AP has a finite size buffer for storing packets. In this scenario, we consider TCP-controlled upload and download file transfers between the STAs and a server on the wireline LAN (e.g., 100 Mbps Ethernet) to which the AP is connected. In such a situation, it is well known that because of packet losses due to finite buffers at the AP, upload file transfers obtain larger throughputs than download transfers. We provide an analytical model for estimating the upload and download throughputs as a function of the buffer size at the AP. We provide models for the undelayed and delayed ACK cases for a TCP that performs loss recovery only by timeout, and also for TCP Reno. The models are validated incomparison with NS2 simulations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There has been a recent spate of high profile infrastructure cost overruns in Australia and internationally. This is just the tip of a longer-term and more deeply-seated problem with initial budget estimating practice, well recognised in both academic research and industry reviews: the problem of uncertainty. A case study of the Sydney Opera House is used to identify and illustrate the key causal factors and system dynamics of cost overruns. It is conventionally the role of risk management to deal with such uncertainty, but the type and extent of the uncertainty involved in complex projects is shown to render established risk management techniques ineffective. This paper considers a radical advance on current budget estimating practice which involves a particular approach to statistical modelling complemented by explicit training in estimating practice. The statistical modelling approach combines the probability management techniques of Savage, which operate on actual distributions of values rather than flawed representations of distributions, and the data pooling technique of Skitmore, where the size of the reference set is optimised. Estimating training employs particular calibration development methods pioneered by Hubbard, which reduce the bias of experts caused by over-confidence and improve the consistency of subjective decision-making. A new framework for initial budget estimating practice is developed based on the combined statistical and training methods, with each technique being explained and discussed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Transient natural convection flow on a heated cylinder buried in a semi-infinite liquid-saturated porous medium has been studied. The unsteadiness in the problem arises due to the cylinder which is heated (cooled) suddenly and then maintained at that temperature. The coupled partial differential equations governing the flow and heat transfer are cast into stream function-temperature formulation, and the solutions are obtained from the initial time to the time when steady state is reached. The heat transfer is found to change significantly with increasing time in a small time interval immediately after the start of the impulsive change, and steady state is reached after some time. The average Nusselt number is found to increase with Rayleigh number When the surface of the cylinder is suddenly cooled, there is a change in the direction of the heat transfer in a small time interval immediately after the start of the impulsive change in the surface temperature;however when the surface temperature is suddenly increased, no such phenomenon is observed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The interaction of transient electromagnetic field due to an NEMP with buried cables has been studied in this paper. The cables studied were of two types: shielded as well as unshielded cables. Using transmission line analysis, the induced voltage and current are computed at the load end of the cable for different soil conductivities, different depths of burial of cable and for different lengths of the cable. Effect of shielding on the induced voltage on the cable inner conductor as well as the dependence of the induced voltage on the shield thickness are also studied.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A comprehensive study was conducted on potential systems of integrated building utilities and transport power solutions that can simultaneously contain rising electricity, hot water and personal transport costs for apartment residents. The research developed the Commuter Energy and Building Utilities System (CEBUS) and quantified the economic, social and environmental benefits of incorporating such a system in future apartment developments. A decision support tool was produced to assist the exploration of the CEBUS design variants. A set of implementation guidelines for CEBUS was also developed for the property development industry.