866 resultados para Watershed projects
Resumo:
Being highly discussed the problem of climate change and global warming has been keeping importance for several of decades. As a response to the world’s need in solution for climate change disasters, the United Nations Framework Convention on Climate Change was adopted in 1992 and supplemented with the Kyoto protocol in 1997. This work is aimed to give better understanding of the Convention, Kyoto Protocol with its mechanisms and their function, related to energy projects in such case countries, as Russia and China, in order to assist evaluation of projects cost-effectiveness. It provides basic information about the Convention and the Protocol with their regulations, overview of present situation and future post-Kyoto forecasts, while the most attention is concentrated on the clean development mechanism and joint implementation step-by-step project cycles and specific regulations in given countries. The current study disclosed that CDM and JI project cycles are resulting in a complicated process. By the moment it requires step-by-step following of a number of methodologies, spending time and finance to particular project development. Uncertainties about post-Kyoto period bring additional risk to the projects and complicate any business decision concerning Kyoto Protocol.
Resumo:
This paper reports the results of a three-year study of the effectiveness of mini-projects in a first year laboratory course in chemistry at a Scottish university. A mini-project is a short, practical problem which requires for its solution the application of the knowledge and skills developed in previously completed set experiments. A number of recommendations have been made about the most appropriate ways of introducing mini-projects into undergraduate laboratory course. The main hypothesis of this survey was concerned with the value of mini-projects in laboratory courses formulated within the context of Information Processing Theory.
Resumo:
Software integration is a stage in a software development process to assemble separate components to produce a single product. It is important to manage the risks involved and being able to integrate smoothly, because software cannot be released without integrating it first. Furthermore, it has been shown that the integration and testing phase can make up 40 % of the overall project costs. These issues can be mitigated by using a software engineering practice called continuous integration. This thesis work presents how continuous integration is introduced to the author's employer organisation. This includes studying how the continuous integration process works and creating the technical basis to start using the process on future projects. The implemented system supports software written in C and C++ programming languages on Linux platform, but the general concepts can be applied to any programming language and platform by selecting the appropriate tools. The results demonstrate in detail what issues need to be solved when the process is acquired in a corporate environment. Additionally, they provide an implementation and process description suitable to the organisation. The results show that continuous integration can reduce the risks involved in a software process and increase the quality of the product as well.
Resumo:
This paper reports how laboratory projects (LP) coupled to inquiry-based learning (IBL) were implemented in a practical inorganic chemistry course. Several coordination compounds have been successfully synthesised by students according to the proposed topics by the LP-IBL junction, and the chemistry of a number of metals has been studied. Qualitative data were collected from written reports, oral presentations, lab-notebook reviews and personal discussions with the students through an experimental course with undergraduate second-year students at the Universidad Nacional de Colombia during the last 5 years. Positive skills production was observed by combining LP and IBL. Conceptual, practical, interpretational, constructional (questions, explanations, hypotheses), communicational, environmental and application abilities were revealed by the students throughout the experimental course.
Resumo:
The purpose of this study was to investigate the nature of co-operation between a project owner and an outside engineering consultant in combined heat and power plant implementation projects. Moreover, as another focal subject of the study was to familiarize the purchasing behavior of the energy producer and how an outside engineering consultant participated into different stages of the purchasing process. The study was carried out as a multiple case study including altogether six Finnish power plant implementation projects that had been taken into commercial use during 1995 – 2015. By adjusting the findings of empirical interview data and comparing those to the theoretical framework concerning, among others, Finnish energy production, engineering consulting businesses, delivery methods of construction project and finally the purchasing process, it can be concluded that especially in the power plant implementation projects in the past have a great influence to decisions made during the project. The role of the main engineering consultant is to act as an assistant, who helps to achieve the project goals successfully rather than an advisor who only knows how the project should be conducted. At least in these five project cases this was the case, meaning that the final decision power always remaining with project owner.
Resumo:
The size and complexity of projects in the software development are growing very fast. At the same time, the proportion of successful projects is still quite low according to the previous research. Although almost every project's team knows main areas of responsibility which would help to finish project on time and on budget, this knowledge is rarely used in practice. So it is important to evaluate the success of existing software development projects and to suggest a method for evaluating success chances which can be used in the software development projects. The main aim of this study is to evaluate the success of projects in the selected geographical region (Russia-Ukraine-Belarus). The second aim is to compare existing models of success prediction and to determine their strengths and weaknesses. Research was done as an empirical study. A survey with structured forms and theme-based interviews were used as the data collection methods. The information gathering was done in two stages. At the first stage, project manager or someone with similar responsibilities answered the questions over Internet. At the second stage, the participant was interviewed; his or her answers were discussed and refined. It made possible to get accurate information about each project and to avoid errors. It was found out that there are many problems in the software development projects. These problems are widely known and were discussed in literature many times. The research showed that most of the projects have problems with schedule, requirements, architecture, quality, and budget. Comparison of two models of success prediction presented that The Standish Group overestimates problems in project. At the same time, McConnell's model can help to identify problems in time and avoid troubles in future. A framework for evaluating success chances in distributed projects was suggested. The framework is similar to The Standish Group model but it was customized for distributed projects.
Resumo:
Agile coaching of a project team is one way to aid learning of the agile methods. The objective of this thesis is to present the agile coaching plan and to follow how complying the plan affects to the project teams. Furthermore, the agile methods are followed how they work in the projects. Two projects are used to help the research. From the thesis point of view, the task for the first project is to coach the project team and two new coaches. The task for the second project is also to coach the project team, but this time so that one of the new coaches acts as the coach. The agile methods Scrum process and Extreme programming are utilized by the projects. In the latter, the test driven development, continuous integration and pair programming are concentrated more precisely. The results of the work are based on the observations from the projects and the analysis derived from the observations. The results are divided to the effects of the coaching and to functionality of the agile methods in the projects. Because of the small sample set, the results are directional. The presented plan, to coach the agile methods, needs developing, but the results of the functionality of the agile methods are encouraging.
Resumo:
Diplomityön tarkoituksena oli tutkia vaatimusten hallintaa suunnittelu- ja konsultointiyrityksen kannalta Suomen ydinvoimaprojekteissa keskittyen ydinturvallisuus- ja laatuvaatimuksiin. Ydinvoimaprojekteissa toimiminen on edellyttänyt menettelyohjeiden ja laatujärjestelmän uudelleen organisointia yrityksessä ja esiin on noussut haasteita liittyen muun muassa vaatimusten tunnistamiseen ja todentamiseen erityyppisissä ja erilaajuisissa projekteissa. Työ toteutettiin perehtymällä ydinvoimaan liittyvään lainsäädäntöön Suomessa, ohjeisiin ja standardeihin sekä haastattelemalla yrityksen omia asiantuntijoita. Viimeaikaisista sekä meneillään olevista projekteista kerättiin kokemuksia sekä arvioitiin ydinvoima projekteja varten laaditun projektin toteutusohjeen toimivuutta ja käytettävyyttä esimerkkiprojektin avulla. Suurimmiksi haasteiksi tunnistettiin lainsäädännöllisten vaatimusten, kuten ydinvoima- laitosohjeiden (YVL) muuttuminen ja tulkinnanvaraisuus sekä asiakkaiden perehtymät- tömyys Suomen lainsäädäntöön ja vaatimustasoon liittyen ydinturvallisuuteen. Työn tuloksena tunnistettiin hyviä vaatimusten hallintaan liittyviä projektinhallintaa ja ydin- turvallisuutta edistäviä asioita, kuten vaatimusten täsmentäminen jo sopimustasolla sekä niiden täyttymisen seuranta projektin aikana. Erillisen vaatimustietokannan luomista ydinvoimaprojekteja varten tutkittiin, mutta siitä luovuttiin teknisten vaatimusten osalta kannattamattomana, sillä standardien ja vaatimusten määrä kasvoi niin suureksi, että niiden hallitseminen vaatisi enemmän työtä kuin mitä projektien taso yleensä sallisi.
Resumo:
The deficient environmental preservation on agricultural properties has reflected in great soil losses for erosion and the high rate of sedimentation. Therefore, this work brings the application of software to demonstrate that planters can get benefits by the conservationist practices. The benefits will be obtained from the environment aspect (erosion and sedimentation control), as well as economical aspect (financial incentives). A proposal has been created by the Technical Chamber of Rural Water Use and Conservation (CT-Rural) to estimate the reduction in raw water use charge for the rural water users of the PCJ Watershed - this reduction is being possible since January 2007, at the PCJ Committee. The software develops a simple relationship, so that if the rural conservationist action goes more efficient, such as if the conserved rural area goes larger, then the reduction value will bring better benefits for the rural water users. Within the purposes of this study, there is the idealization of mechanisms that may support specific management matters related to the water users of federal rivers from the rural sector of PCJ Watershed.
Resumo:
Kuraattorit Anna-Kaisa Rastenberger ja Tero Puha, Biennaalin pääkuraattori Peter Weibel
Resumo:
The Brazilian Law stipulates that water is a limited natural resource doted of economic value, thus it is necessary to develop mechanisms for its adequate management. Actions that encourage the farmers to apply soil conservation practices with the purpose of increase water yield from springs and to promote improvement of its quality, reducing production of sediment transportation, is being encouraged by governments, even with financial compensation for owners. From these assertions, this study aims to quantify the benefits of the conservation actions of the management units and to characterize a Water Yield Indicator (WYI) to support sustainable actions in the watershed of Alto Rio Grande region, in the state of Minas Gerais (MG). To assess the impact of actions it were identified four scenarios of land use and occupation of the watershed from Marcela stream which is located in Alto Rio Grande Region. After analyzing the results, it can be stated that the scenarios simulation has demonstrated important changes in water yield and that the definition of the Water Yield Index from the junction of the erosion potential with the water storage potential, has proved effective, as it integrate quantity and quality of water.
Resumo:
Springs are outcrops of aquifers surface, and the water cycle in this environment pass through the recharge, generally defined as the amount of water added to the aquifer, which may occur locally from rainwater infiltration. This study uses the Water Table Fluctuation (WTF) method to estimate the direct recharge and a groundwater balance to estimate the deep recharge on unconfined aquifers. The WTF method employs data of the aquifer water levels and its specific yield to estimate the direct recharge. The groundwater balance considers the direct recharge estimated by the WTF method, as the water input in the system and outputs as the base flow and deep recharge. The recharge was estimated at four areas at the watershed of Alto Rio Grande city, Minas Gerais (MG) state, in Brazil. The direct recharge estimate was 121.11; 64.62; 83.99; 152.46 (mm/year) for the L1, L2, M1 and M2 areas. The effect of the presence of forest in the recharge area can prevail over slope of relief, allowing more direct recharge, even in sources with steeper relief. The runoff from the springs in the study period exceeded the direct recharge, indicating a situation in which the saturated zone feeds the vadose zone. The annual flow was above the direct recharge pointing a situation of over exploitation of the aquifer, a non sustainable situation. The specific yield of the aquifers could also have been underestimated.