751 resultados para Risk management
Resumo:
This research examined sex offender risk assessment and management in Ireland. It focused on the statutory agencies with primary responsibility (Garda Síochána and the Probation Service). The goal was to document the historical, contextual and current systems, in addition to identifying areas of concern/improvements. The research was a mixed-methods approach. Eight studies were conducted. This incorporated documentary reviews of four Commission to Inquire Reports, qualitative interviews/focus groups with Garda staff, Probation Service staff, statutory agencies, community stakeholders, various Non-Governmental Organisations (NGOs) and sex offenders. Quantitative questionnaires were also administered to Garda staff. In all over 70 interviews were conducted and questionnaires were forwarded to 270 Garda members. The overall findings are: •Sex offender management in Ireland has become formal only since 2001. Knowledge, skills and expertise is in its infancy and is still evolving. •Mixed reviews and questions regarding fitness for purpose of currently used risk assessments tools were noted. •The Sex Offender Act 2001 requires additional elements to ensure safe sex offender monitoring and public protection. A judicial review of the Sex Offender Act 2001 was recommended by many respondents. •Interagency working under SORAM was hugely welcomed. The sharing of information has been welcomed by managing agencies as the key benefit to improving sex offender management. •Respondents reported that in practice, sex offender management in Ireland is fragmented and unevenly implemented. The research concluded that an independent National Sex Offender Authority should be established as an oversight and regulatory body for policy, strategy and direction in sex offender management. Further areas of research were also highlighted: ongoing evaluation and audits of the joint agency process and systems in place; recidivism studies tracking the risk assessment ratings and subsequent offending; and an evaluation of the current status of sex offender housing in Ireland.
Resumo:
PPP (Public Private Partnerships) is a new operation mode of infrastructure projects, which usually undergo long periods and have various kinds of risks in technology, market, politics, policy, finance, society, natural conditions and cooperation. So the government and the private agency should establish the risk-sharing mechanism to ensure the successful implementation of the project. As an important branch of the new institutional economics, transaction cost economics and its analysis method have been proved to be beneficial to the proper allocation of risks between the two parts in PPP projects and the improvement of operation efficiency of PPP risk-sharing mechanism. This paper analyzed the transaction cost of the projects risk-sharing method and the both risk carriers. It pointed out that the risk-sharing method of PPP projects not only reflected the spirit of cooperation between public sector and private agency, but also minimized the total transaction cost of the risk sharing mechanism itself. Meanwhile, the risk takers had to strike a balance between the beforehand cost and the afterwards cost so as to control the cost of risk management. The paper finally suggested three ways which might be useful to reduce the transaction cost: to choose appropriate type of contract of PPP risk-sharing mechanism, to prevent information asymmetry and to establish mutual trust between the two participants.
Resumo:
Construction procurement organisations in the Australian framework provide broad guidelines on project management in setting benchmark performance measurements and processes for evaluating their projects. Despite this, little has been known in the project management practise in transport construction projects in Australia, in particular Queensland. Questionnaire data from 53 project management practitioners employed in State and City public sector organisations in Queensland,suggested that many practitioners in the public sector have little or a lack of understanding of government regulatory policies, which are used as economic evaluation tools for project options. Public sector project managers perceive socio-economic evaluation tools as inappropriate for public sector projects. The survey results also found conducting risk management analysis, developing a risk register and mitigation of risks were most effective way of managing risk. This study provides an opportunity for the public sector to review and provide training on project management practices and government regulatory policies governing public projects. This will improve project management practitioners’ understanding and interpretation of government regulatory policies.
Resumo:
With the increasing complexity of modern day threats and the growing sophistication of interlinked and interdependent operating environments, Business Continuity Management (BCM) has emerged as a new discipline, offering a strategic approach to safeguarding organisational functions. Of significant interest is the application of BCM frameworks and strategies within critical infrastructure, and in particular the aviation industry. Given the increased focus on security and safety for critical infrastructures, research into the adoption of BCM principles within an airport environment provides valuable management outcomes and research into a previously neglected area of inquisition. This research has used a single case study methodology to identify possible impediments to BCM adoption and implementation by the Brisbane Airport Corporation (BAC). It has identified a number of misalignments between the required breadth of focus for a BCM program, identified differing views on specific roles and responsibilities required during a major disruptive event and illustrated the complexities of the Brisbane Airport which impede the understanding and implementation of effective Business Continuity Management Strategies.
Resumo:
Accurate owner budget estimates are critical to the initial decision-to-build process for highway construction projects. However, transportation projects have historically experienced significant construction cost overruns from the time the decision to build has been taken by the owner. This paper addresses the problem of why highway projects overrun their predicted costs. It identifies the owner risk variables that contribute to significant cost overrun and then uses factor analysis, expert elicitation, and the nominal group technique to establish groups of importance ranked owner risks. Stepwise multivariate regression analysis is also used to investigate any correlation of the percentage of cost overrun with risks, together with attributes such as highway project type, indexed cost, geographics location, and project delivery method. The research results indicate a correlation between the reciprocal of project budgets size and percentage cost overrun. This can be useful for owners in determining more realistic decision-to-build highway budget estimates by taking into account the economies of scale associated with larger projects.
Resumo:
Tarrant argues that a solid risk management strategy is critical to building effective, transformational and adaptive organisations. Organisations are a fundamental part of our society and economic system whether they are private, public or not-for-profits. There are very few aspects of our society and economy that don’t rely wholly or in part on the performance of organisations. Disasters and crises are complex and very challenging environments for organisations. How can effective transformational and adaptive capacity become institutionalised and a core part of good governance of organisations? Effective risk management is a critical element in meeting organisational objectives in a turbulent and uncertain environment.
Resumo:
Objective: Diarrhoea in the enterally tube fed (ETF) intensive care unit (ICU) patient is a multifactorial problem. Diarrhoeal aetiologies in this patient cohort remain debatable; however, the consequences of diarrhoea have been well established and include electrolyte imbalance, dehydration, bacterial translocation, peri anal wound contamination and sleep deprivation. This study examined the incidence of diarrhoea and explored factors contributing to the development of diarrhoea in the ETF, critically ill, adult patient. ---------- Method: After institutional ethical review and approval, a single centre medical chart audit was undertaken to examine the incidence of diarrhoea in ETF, critically ill patients. Retrospective, non-probability sequential sampling was used of all emergency admission adult ICU patients who met the inclusion/exclusion criteria. ---------- Results: Fifty patients were audited. Faecal frequency, consistency and quantity were considered important criteria in defining ETF diarrhoea. The incidence of diarrhoea was 78%. Total patient diarrhoea days (r = 0.422; p = 0.02) and total diarrhoea frequency (r = 0.313; p = 0.027) increased when the patient was ETF for longer periods of time. Increased severity of illness, peripheral oxygen saturation (Sp02), glucose control, albumin and white cell count were found to be statistically significant factors for the development of diarrhoea. ---------- Conclusion: Diarrhoea in ETF critically ill patients is multi-factorial. The early identification of diarrhoea risk factors and the development of a diarrhoea risk management algorithm is recommended.
Resumo:
This paper presents a comprehensive discussion of vegetation management approaches in power line corridors based on aerial remote sensing techniques. We address three issues 1) strategies for risk management in power line corridors, 2) selection of suitable platforms and sensor suite for data collection and 3) the progress in automated data processing techniques for vegetation management. We present initial results from a series of experiments and, challenges and lessons learnt from our project.
Resumo:
This study used the Australian Environmental Health Risk Assessment Framework to assess the human health risk of dioxin exposure through foods for local residents in two wards of Bien Hoa City, Vietnam. These wards are known hot-spots for dioxin and a range of stakeholders from central government to local levels were involved in this process. Publications on dioxin characteristics and toxicity were reviewed and dioxin concentrations in local soil, mud, foods, milk and blood samples were used as data for this risk assessment. A food frequency survey of 400 randomly selected households in these wards was conducted to provide data for exposure assessment. Results showed that local residents who had consumed locally cultivated foods, especially fresh water fish and bottom-feeding fish, free-ranging chicken, duck, and beef were at a very high risk, with their daily dioxin intake far exceeding the tolerable daily intake recommended by the WHO. Based on the results of this assessment, a multifaceted risk management program was developed and has been recognized as the first public health program ever to have been implemented in Vietnam to reduce the risks of dioxin exposure at dioxin hot-spots.