877 resultados para Project management


Relevância:

70.00% 70.00%

Publicador:

Resumo:

This is a qualitative study of female underrepresentation in leadership roles in project-based organisations in Australia, specifically the construction and property development industries. Using a gender lens, the underlying structural and cultural barriers to women's advancement to leadership in those organisations was studied and, in particular, what challenges they face in their career advancement and what attempts they make to resolve those challenges. The findings show that the unique characteristics of project-based organisations, with their perpetual masculine work practices, embedded masculine logic, gender-based bias and masculine organisational culture, all maintain the pattern of underrepresentation of women.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

As business environments become even more competitive, project teams are required to make an effort to operate external linkages from within an organization or across organizational boundaries. Nevertheless, some members boundary-span less extensively, isolating themselves and their project teams from external environments. Our study examines why some members boundary-span more or less through the framework of group attachment theory. Data from 521 project-team members in construction and engineering industries revealed that the more individuals worry about their project team’s acceptance (group attachment anxiety), the more likely they are to perceive intergroup competition, and thus put more efforts into operating external linkages and resources to help their own teams outperform competitors. In contrast, a tendency to distrust their project teams (group attachment avoidance) generates members’ negative construal of their team’s external image, and thus fewer efforts are made at operating external linkages. Thus, project leaders and members with high group-attachment-anxiety may be best qualified for external tasks.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The concession agreement is the core feature of BOT projects, with the concession period being the most essential feature in determining the time span of the various rights, obligations and responsibilities of the government and concessionaire. Concession period design is therefore crucial for financial viability and determining the benefit/cost allocation between the host government and the concessionaire. However, while the concession period and project life span are essentially interdependent, most methods to date consider their determination as contiguous events that are determined exogenously. Moreover, these methods seldom consider the, often uncertain, social benefits and costs involved that are critical in defining, pricing and distributing benefits and costs between the various parties and evaluating potentially distributable cash flows. In this paper, we present the results of the first stage of a research project aimed at determining the optimal build-operate-transfer (BOT) project life span and concession period endogenously and interdependently by maximizing the combined benefits of stakeholders. Based on the estimation of the economic and social development involved, a negotiation space of the concession period interval is obtained, with its lower boundary creating the desired financial return for the private investors and its upper boundary ensuring the economic feasibility of the host government as well as the maximized welfare within the project life. The outcome of the new quantitative model is considered as a suitable basis for future field trials prior to implementation. The structure and details of the model are provided in the paper with Hong Kong tunnel project as a case study to demonstrate its detailed application. The basic contributions of the paper to the theory of construction procurement are that the project life span and concession period are determined jointly and the social benefits taken into account in the examination of project financial benefits. In practical terms, the model goes beyond the current practice of linear-process thinking and should enable engineering consultants to provide project information more rationally and accurately to BOT project bidders and increase the government's prospects of successfully entering into a contract with a concessionaire. This is expected to generate more negotiation space for the government and concessionaire in determining the major socioeconomic features of individual BOT contracts when negotiating the concession period. As a result, the use of the model should increase the total benefit to both parties.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The driving force behind this study is the gap between the reality of the firms engaged in project business and the available studies covering project management and business process development. Previous studies show that project-based organizations were ‘immature’ in terms of the project-management ‘maturity model’, as few firms were found to be optimizing processes. Even within those, very little attention was paid to combine inter-organizational and intra-organizational perspectives. In this study an effort is made to elaborate some thoughts and views on project management, which interrelate firms’ external and internal activities. In line with the integration, the dissertation uses an approach to the management of project-business interdependencies in the networks of actors, activities and resources. Firstly, the study develops an understanding for inter-organizational perspectives by exploring the complementarities of process activities in the basic development of project business. It presents a framework that is elaborated on the basis of the reciprocal interactions of activities within and outside the organization—thus providing a coherent basis for continuous business-process improvement. In addition, the study presents new tools that can be used to develop project-business processes in each of its functional areas. The research demonstrates how project-business activities can be optimized using the right resources at the right time with the right actors and the right actions. The selected five articles included in this dissertation explain the basic framework for the development of project business. Each paper covers various aspects of inter-organizational and intra-organizational perspectives for project management. The study develops a valuable and procedural model for business-process improvement using the Delphi method that can be used not only in academia but also as a guide for practitioners that takes them through a series of well-defined steps when making informed, consistent and efficient changes to their business processes.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Despite thirty years of research in interorganizational networks and project business within the industrial networks approach and relationship marketing, collective capability of networks of business and other interorganizational actors has not been explicitly conceptualized and studied within the above-named approaches. This is despite the fact that the two approaches maintain that networking is one of the core strategies for the long-term survival of market actors. Recently, many scholars within the above-named approaches have emphasized that the survival of market actors is based on the strength of their networks and that inter-firm competition is being replaced by inter-network competition. Furthermore, project business is characterized by the building of goal-oriented, temporary networks whose aims, structures, and procedures are clarified and that are governed by processes of interaction as well as recurrent contracts. This study develops frameworks for studying and analysing collective network capability, i.e. collective capability created for the network of firms. The concept is first justified and positioned within the industrial networks, project business, and relationship marketing schools. An eclectic source of conceptual input is based on four major approaches to interorganizational business relationships. The study uses qualitative research and analysis, and the case report analyses the empirical phenomenon using a large number of qualitative techniques: tables, diagrams, network models, matrices etc. The study shows the high level of uniqueness and complexity of international project business. While perceived psychic distance between the parties may be small due to previous project experiences and the benefit of existing relationships, a varied number of critical events develop due to the economic and local context of the recipient country as well as the coordination demands of the large number of involved actors. The study shows that the successful creation of collective network capability led to the success of the network for the studied project. The processes and structures for creating collective network capability are encapsulated in a model of governance factors for interorganizational networks. The theoretical and management implications are summarized in seven propositions. The core implication is that project business success in unique and complex environments is achieved by accessing the capabilities of a network of actors, and project management in such environments should be built on both contractual and cooperative procedures with local recipient country parties.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The efforts involved in developing a small satellite for scientific purposes in China in recent years are introduced in the present paper. The project is arranged on a case to case principle depending upon requirements and financial support. The space technology of a satellite and rockets, which have been developed over a relatively longer period in China, have been transferred to the scientific research of small satellites for improvement of the quality requirements. The surplus payloads of the rocket and satellite are used as the payloads of the small satellite and scientific experiments at a low cost. As an example, the project of balloon satellites for atmospheric research was successfully completed in 1991. The experience of the project management is of great benefit for further organization and arrangement of other projects. Opportunities exist for surplus payloads to be used in the future, and a small satellite for magnetospheric research will be launched in 1993.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Atualmente não é possível pensar em gestão de projetos sem uma boa ferramenta apoiada em Tecnologia da Informação. Este trabalho estudou o processo de implantação e personalização do Microsoft Project Server na Câmara dos Deputados com o objetivo de avaliar se essa implantação se deu de maneira adequada segundo as melhores práticas de gestão de projetos, além de levantar as principais lições aprendidas no processo. Para tanto foi realizada uma pesquisa documental, em que, na primeira parte fez-se um apanhado em nível teórico das melhores práticas de gestão de projetos, notadamente PMBOK do PMI e a consulta a autores relevantes no contexto da gestão de projetos e da aprendizagem organizacional. Em um segundo momento foram pesquisados documentos relacionados ao processo de implantação como o edital de licitação, atas de reunião, atos normativos, dentre outros. Dos dados levantados foram identificadas falhas por parte da Câmara dos Deputados tais como elevado número de exigências de personalizações no ambiente e conhecimento limitado, a priori, da ferramenta, de suas capacidades e limitações. Por parte da contratada, observou-se falhas como desorganização, planejamento ruim, descumprimento de prazos, pendências, grandes atrasos e mudanças na equipe técnica do projeto. Pela análise dessas falhas, levantaram-se diversas lições aprendidas no processo. Por fim, concluiu-se que o processo de implantação do Microsoft Project Server na Câmara dos Deputados foi parcialmente adequado, pois apesar de ao final estar implantado de acordo com o escopo requerido, o processo como um todo apresentou muitas falhas.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The study was conducted to investigate the communities perception and compliance to community-based fisheries management (CBFM) in Turag-Bangshi floodplains under Kaliakoir, Gazipur District. Measures such as ban on use of the harmful fishing gears, seasonal fishing closure, halt of fry fishing, halt of dewatering of beels and the impact of establishment of sanctuaries on fish production and species diversity were introduced by MACH project. Almost all members of the communities in Turag-Bangshi MACH (Management of Aquatic Ecosystem through Community Husbandry) site welcomed the introduction and complied with the implementation of all management measures which helped stopped use of harmful fishing gears, ensured survival and breeding of brood fish in the rainy season, protected and allowed fry to grow big, restored lost and degraded fisheries and organized communities for sustainable development of the fisheries. A total of 51 species of fishes were found in Makosh beel (natural depression). Among these, small indigenous species (SIS) under Cyprinidae family (Puntius sophore) was the most dominant. Many species available in the past recorded disappeared from the Makosh beel due to loss of habitat and industrial pollution that damaged spawning and nursery grounds of fish. Introduction of some selective native endangered species (Nandus nandus, Notopterus notopterus, Ompok pabda and Labeo calbasu) by MACH in the Turag-Bangshi water bodies increased diversity of species from 82 to 95. Over a period of five years during MACH intervention, the average production remained nearly 200% higher than the baseline production of 57 kg/ha to present 207 kg/ha due to maintaining sanctuaries and the closed fishing seasons. Per capita daily fish consumption of the surrounding communities also increased by 78% (from 27 to 48 g/person/day) which is much higher than the national average fish consumption in Bangladesh. The implementation of community-based MACH project management measures substantially improved fish habitat, production, consumption and socio-economic conditions of the surrounding communities. The model can be used to improve the floodplains of Bangladesh.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

This book explores the processes for retrieval, classification, and integration of construction images in AEC/FM model based systems. The author describes a combination of techniques from the areas of image and video processing, computer vision, information retrieval, statistics and content-based image and video retrieval that have been integrated into a novel method for the retrieval of related construction site image data from components of a project model. This method has been tested on available construction site images from a variety of sources like past and current building construction and transportation projects and is able to automatically classify, store, integrate and retrieve image data files in inter-organizational systems so as to allow their usage in project management related tasks. objects. Therefore, automated methods for the integration of construction images are important for construction information management. During this research, processes for retrieval, classification, and integration of construction images in AEC/FM model based systems have been explored. Specifically, a combination of techniques from the areas of image and video processing, computer vision, information retrieval, statistics and content-based image and video retrieval have been deployed in order to develop a methodology for the retrieval of related construction site image data from components of a project model. This method has been tested on available construction site images from a variety of sources like past and current building construction and transportation projects and is able to automatically classify, store, integrate and retrieve image data files in inter-organizational systems so as to allow their usage in project management related tasks.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Le projet de construction au XXIe siècle :nouveaux acteurs, nouvelles responsabilités. L’apparition de nouveaux intervenants dans les projets de contruction bouleverse le schéma classique Maître d’ouvrage – Architecte – Entrepreneur. Parmi ceux-ci, le Project Manager occupe une place de premier rang, dès lors qu’il interviendra bien souvent dès l’entame du projet et jusqu’à complétion de celui-ci. L’ouvrage offre une première analyse complète de sa situation juridique, en mêlant littérature juridique (belge, française et américaine) et pratique de terrain. Envisagé ici à travers le prisme de sa relation contractuelle avec le Maître d’ouvrage, le Project manager reçoit une définition légale d’où sont déduits les éléments essentiels de se son contrat. Son statut, ses missions ainsi que ses responsabilités sont identiés précisément et articulés harmonieusement avec ceux d’autre professionnels (arhitectes et entrepreneurs). Spécialement sur la question des reponsabilités, l’ouvrage démontre que certains cas de responsabilité traditionnellement imputés à l’un de ces autres acteurs pourront être imputés au Project Manager, allant dans le sens d’un régime unifié de responsabilité pour l’ensemble de ces acteurs. L’ouvrage s’enrichit encore d’un modèle contractuel de base et d’une bibliographie.Incontestablement, l’ouvrage vient combler un vide doctrinal et constituera un guide essentiel, tant pour les Maîtres d’ouvrage que pour les Project Manager.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Research This paper outlines some of the key findings from an evaluation of the project and demonstrates that EC funded projects such as this, which seek to promote cross border collaboration and understanding (i.e. across organisational, sectoral and geographical boundaries) offer considerable learning potential – not least about variances in health politics across different communities. However, for this learning to be realised a comprehensive system of knowledge management needs to be an integral part of project planning alongside a system for sustaining embryonic professional networks. The concept of managing relationships was also a key part of the projects success. Executing a project funded by the EU demands the development of complex organisational skills to negotiate all the administrative challenges en route to successful completion and this project in particular relied for its success on the development of social relationships of trust and mutual respect across national, professional and social boundaries. Context A three–year European Commission funded project designed to exchange a wide range of staff (professional semiprofessional and voluntary staff in health and social care) project led by the University of Greenwich (UK) and the Université Catholique de Lille, France was completed this year (February 2008). The project was complex because it involved working in different national contexts, was multi-disciplinary, and demanded the negotiation of multiple boundaries. Theories A mixed method evaluation including written reports gathered immediately after each exchange visit and a post hoc series of individual interviews and focus groups was conducted in order to gain qualitative information (from the participants perspective) on their experiences and to identify any learning gained. Results Analysis of the data provided evidence of learning on a number of levels; personally, inter and intra professionally and organisationally as well as across sectors and also from a project management perspective. The learning crystallised around the extent of the differences noted by the participants between the UK and the French health and social care systems despite geographical proximity, common membership of the EU and many shared challenges in health and social care. The extent of these differences, noted at every level from policy to practice proved a rich source for reflection on organisational philosophies, ways of working, distribution of resources, professional roles and autonomy and professional registration and mobility - in short on health politics at ‘macro’ and ‘micro’ levels.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

This case study examines how the lean ideas behind the Toyota production system can be applied to software project management. It is a detailed investigation of the performance of a nine-person software development team employed by BBC Worldwide based in London. The data collected in 2009 involved direct observations of the development team, the kanban boards, the daily stand-up meetings, semistructured interviews with a wide variety of staff, and statistical analysis. The evidence shows that over the 12-month period, lead time to deliver software improved by 37%, consistency of delivery rose by 47%, and defects reported by customers fell 24%. The significance of this work is showing that the use of lean methods including visual management, team-based problem solving, smaller batch sizes, and statistical process control can improve software development. It also summarizes key differences between agile and lean approaches to software development. The conclusion is that the performance of the software development team was improved by adopting a lean approach. The faster delivery with a focus on creating the highest value to the customer also reduced both technical and market risks. The drawbacks are that it may not fit well with existing corporate standards.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The construction industry is inherently risky, with a significant number of accidents and disasters occurring, particularly on confined construction sites. This research investigates and identifies the various issues affecting successful management of health and safety in confined construction sites. The rationale is that identifying the issues would assist the management of health and safety particularly in inner city centres which are mostly confined sites. Using empiricism epistemology, the methodology was based on qualitative research approach by means of multiple case studies in three different geographical locations of Ireland, UK and USA. Data on each case study were collected through individual interviews and focus group discussion with project participants. The findings suggest that three core issues are the underlying factors affecting management of health and safety on confined construction sites. It include, (i) lack of space, (ii) problem of co-ordination and management of site personnel, and (iii) overcrowding of workplace. The implication of this is that project teams and their organisations should see project processes from a holistic point of view, as a unified single system, where quick intervention in solving a particular issue should be the norm, so as not to adversely affect interrelated sequence of events in project operations. Proactive strategies should be devised to mitigate these issues and may include detail project programming, space management, effective constructability review and efficient co-ordination of personnel, plant and materials among others. The value of this research is to aid management and operation of brownfield sites by identifying issues impacting on health and safety management in project process.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to identify, clarify and tabulate the various managerial issues encountered, to aid in the management of the complex health and safety concerns which occur within a confined construction site environment.

Design/methodology/approach – This is achieved through conducting extensive qualitative and qualitative research in the form of case studies, interviews and questionnaire survey.

Findings – The leading managerial issues in the management of health and safety on a confined construction site are found to be: “Difficulty to move materials around site safely”; “Lack of adequate room for the effective handling of materials”; “Difficulty in ensuring site is tidy and all plant and materials are stored safely”; “Close proximity of individuals to operation of large plant and machinery”; and joint fifth “Difficulty in ensuring proper arrangement and collection of waste materials on-site” along with “Difficulty in controlling hazardous materials and equipment on site”.

Practical implications – The resulting implication for practice of these results can be summarised by identifying that with sustained development of urban centres on a global scale, coupled with the increasing complexity of architectural designs, the majority of on-site project management professionals are faced with the onerous task of completing often intricate designs within a limited spatial environment, under strict health and safety parameters.

Originality/value – The subsequent value of the findings are such that just as on-site management professionals successfully identify the various managerial issues highlighted, the successful management of health and safety on a confined construction site is attainable.