919 resultados para OPM3 (Organizational Project Management Model Maturity)


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Dissertação apresentada ao Instituto Politécnico do Porto para obtenção do Grau de Mestre em Logística Orientada por: Prof. Dr. Pedro Godinho

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The development of economical relations increases the interaction between organizations and stakeholders. It is no more acceptable to manage an organization under a transactional perspective where suppliers had a fundamental role. Nowadays organizations are being managed under a relational perspective where relations and relationship management in general have consequences in identity management (Hakansson e Snehota, 1989, 1995). A correct perception and management of identity is necessary to achieve distinctiveness in the competitive environment. This way, identity is influenced by relations with stakeholders in general and particularly with competitors. The ICIG concept states that identity is related with the values of the organization and it helps creating distinctiveness in the competitive environment (Van Riel, Balmer, 1997); Baker and Balmer (1997) state that identity is what the organization is; Suvatjis and de Chernatony (2005) refer that expressing identity is a dynamic process that evolves the use of a management model to face context changes; Kapferer (1991) states that brand identity is the project, the self conception of the brand. After reviewing and confronting literature under the plethora of identities’ concepts and perspectives (He, Balmer, 2007) one can’t find an integrative answer with all the elements that contribute to identity of organizations. The authors are strongly interested to contribute to the elimination of this limitation and to answer to strategic management needs. In a marketing context one can find: - the corporate identity approach that is focused in the distinctive attributes of an organization (Abratt, Balmer, Marwick e Fill, Stuart, Balmer and Gray, Alessandri, Suvatjis and de Chernatony) - the brand identity approach (related with the application of corporate identity studies to brands) - Kapferer, Semprini, Aaker, de Chernatony). Kapferer (1991), one of the most prolific authors in this field was the first author to integrate identity in a brand concept. In his view, identity is an emission concept. This idea is shared also by Aaker (1996). Yet, identity has to be managed in a competitive environment which is constantly changing. After reviewing and confronting literature, authors select concepts that are generally accepted by the investigators in order to design a model to analyze and manage identity: - corporate identity models: personality, image/reputation, culture, philosophy, mission, strategy, structure, communication - some of these concepts derive from identity models and others from identity management models; - brand identity models – Kapferer (1991, 2008) identity prism, witch is basis of literature in this field: culture, physical facet, personality, relationship (between brand and consumer), reflected consumer, consumers` self-concept. After discussion authors decide to include other concept in line with other authors` view: country of origin (Aaker, 1996). A discussion eliminates the twin concepts and the final selection is as follows: personality, image/reputation, culture (including philosophy and mission), strategy, structure, communication, culture, physical facet, relationship (between brand and consumer), reflected consumer, consumers` self-concept and according to authors` reflections “relationships” deriving from competitors` actions in competitive environment. Competitors’ actions and decisions have a stronger influence in the organizations` positioning than any other stakeholder as stated before. This is a work in progress towards a new model in identity analysis and management so an exploratory study will follow inquiring experts on identity in order to evaluate these concepts and correct the theoretical perspectives.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mestrado em Contabilidade e Gestão das Instituições Financeiras

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Book Subtitle International Conference, CENTERIS 2010, Viana do Castelo, Portugal, October 20-22, 2010, Proceedings, Part II

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Conceitos como Globalização, Internacionalização, Localização e Tradução surgem, na realidade da indústria da língua, com uma grande interligação, mas com perspectivas nem sempre concordantes. O nosso trabalho analisa, por isso, as diferentes definições propostas dedicando especial atenção ao conceito de localização, uma vez que o nosso projecto analisa o processo de localização de uma página Web desenvolvido num contexto empresarial real. O nosso enfoque recai mais específicamente sobre a localização de páginas Web, objecto do nosso projecto, identificando não só as suas particularidades, como também os intervenientes e o tipo de competências necessárias para o desenvolvimento de um trabalho nesta área da tradução e as ferramentas disponíveis para o profissional da tradução/ localização, de que se destacam as freeware. O processo de localização impõe metas de qualidade exigentes, pelo que, partindo da definição do conceito de qualidade, analisamos o tipo de requisitos necessários a uma correcta definição de tarefas e objectivos no contexto da localização. Esta definição de conceitos e a análise do processo de localização suportaram, em seguida, o desenvolvimento do objecto do nosso projecto - o processo de localização da página Web da empresa Pinto & Cruz, ao mesmo tempo que permitiram uma prévia identificação de todos os passos a desenvolver e do tipo de dificuldades e problemas a enfrentar. Assim, e em função das condicionantes impostas pelo modelo de gestão da página, definimos um fluxo de trabalho, em que identificamos as diferentes fases e intervenientes, mediante a utilização de uma plataforma de trabalho disponibilizada pelo webmaster do sítio em questão. O processo seguido para a localização da página é descrito, as suas especificidades documentadas e as dúvidas e dificuldades identificadas. Pretendeu-se, com o desenvolvimento deste projecto e com a descrição feita sistematizar uma abordagem ao processo e alertar para o tipo de dificuldades inerentes à sua prossecução, sobretudo para quem se dispõem a fazê-lo pela primeira vez.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Flexible forms of work like project work are gaining importance in industry and services. Looking at the research on project work, the vast majority of present literature is on project management, but increasingly, problems concerning the quality of work and the efficiency of project teams become visible. The question now is how project work can be structured in order to simultaneously provide efficient and flexible work and healthy working conditions ensuring the development of human resources for a long time. Selected results of publicly funded research into project work will be presented based on case studies in 7 software development /IT consulting project teams (N=34). A set of different methods was applied: interviews with management/project managers, group interviews on work constraints, a monthly diary about well-being and critical incidences in the course of the project, and a final evaluation questionnaire on project outcomes focusing on economic and health aspects. Findings reveal that different types of projects exist with varying degree of team members’ autonomy and influence on work structuring. An effect of self-regulation on mental strain could not be found. The results emphasize, that contradicting requirements and insufficient organizational resources with respect to the work requirements lead to an increased work intensity or work obstruction. These contradicting requirements are identified as main drivers for generating stress. Finally, employees with high values on stress for more than 2 months have significantly higher exhaustion rates than those with only one month peaks. Structuring project work and taking into account the dynamics of project work, there is a need for an active role of the project team in contract negotiation or the detailed definition of work – this is not only a question of individual autonomy but of negotiation the range of option for work structuring. Therefore, along with the sequential definition of the (software) product, the working conditions need to be re-defined.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents a genetic algorithm for the resource constrained multi-project scheduling problem. The chromosome representation of the problem is based on random keys. The schedules are constructed using a heuristic that builds parameterized active schedules based on priorities, delay times, and release dates defined by the genetic algorithm. The approach is tested on a set of randomly generated problems. The computational results validate the effectiveness of the proposed algorithm.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mestrado em Intervenção Sócio-Organizacional na Saúde - Área de especialização: Políticas de Administração e Gestão de Serviços de Saúde

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The resource constrained project scheduling problem (RCPSP) is a difficult problem in combinatorial optimization for which extensive investigation has been devoted to the development of efficient algorithms. During the last couple of years many heuristic procedures have been developed for this problem, but still these procedures often fail in finding near-optimal solutions. This paper proposes a genetic algorithm for the resource constrained project scheduling problem. The chromosome representation of the problem is based on random keys. The schedule is constructed using a heuristic priority rule in which the priorities and delay times of the activities are defined by the genetic algorithm. The approach was tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

- The resource constrained project scheduling problem (RCPSP) is a difficult problem in combinatorial optimization for which extensive investigation has been devoted to the development of efficient algorithms. During the last couple of years many heuristic procedures have been developed for this problem, but still these procedures often fail in finding near-optimal solutions. This paper proposes a genetic algorithm for the resource constrained project scheduling problem. The chromosome representation of the problem is based on random keys. The schedule is constructed using a heuristic priority rule in which the priorities and delay times of the activities are defined by the genetic algorithm. The approach was tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Dissertation submitted to Faculdade de Ciências e Tecnologia of Universidade Nova de Lisboa for the achievement of Integrated Master´s degree in Industrial Management Engineering

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Este artigo apresenta uma nova abordagem (MM-GAV-FBI), aplicável ao problema da programação de projectos com restrições de recursos e vários modos de execução por actividade, problema conhecido na literatura anglo-saxónica por MRCPSP. Cada projecto tem um conjunto de actividades com precedências tecnológicas definidas e um conjunto de recursos limitados, sendo que cada actividade pode ter mais do que um modo de realização. A programação dos projectos é realizada com recurso a um esquema de geração de planos (do inglês Schedule Generation Scheme - SGS) integrado com uma metaheurística. A metaheurística é baseada no paradigma dos algoritmos genéticos. As prioridades das actividades são obtidas a partir de um algoritmo genético. A representação cromossómica utilizada baseia-se em chaves aleatórias. O SGS gera planos não-atrasados. Após a obtenção de uma solução é aplicada uma melhoria local. O objectivo da abordagem é encontrar o melhor plano (planning), ou seja, o plano que tenha a menor duração temporal possível, satisfazendo as precedências das actividades e as restrições de recursos. A abordagem proposta é testada num conjunto de problemas retirados da literatura da especialidade e os resultados computacionais são comparados com outras abordagens. Os resultados computacionais validam o bom desempenho da abordagem, não apenas em termos de qualidade da solução, mas também em termos de tempo útil.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents a genetic algorithm for the Resource Constrained Project Scheduling Problem (RCPSP). The chromosome representation of the problem is based on random keys. The schedule is constructed using a heuristic priority rule in which the priorities of the activities are defined by the genetic algorithm. The heuristic generates parameterized active schedules. The approach was tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Atualmente a elaboração de plano de trabalhos (utilizando a ferramenta Microsoft Project) é prática corrente em muitas empresas, como são o caso das empresas de construção civil, como meio de auxílio para o estabelecimento de prazos e articulação com as diversas subempreitadas que uma qualquer obra tem ao longo da sua execução. O presente trabalho visa demonstrar a importância da elaboração de um plano de trabalhos para o planeamento e controlo de uma instalação de Aquecimento, Ventilação e Ar Condicionado (AVAC). Recorrendo ao uso do software Microsoft Project foi elaborado um modelo de planeamento e controlo, utilizando dados reais, para o planeamento e controlo de uma instalação de AVAC. Foi ainda elaborado, através do Microsoft Excel, um plano anual de manutenções preventivas para os contratos de manutenção em vigor. No final, são indicadas as principais conclusões e as vantagens da utilização deste modelo na obtenção de melhores resultados no cumprimento de prazos e redução de custos com o pessoal afeto à empresa. São ainda perspetivados futuros desenvolvimentos utilizando essa ferramenta. Com o modelo criado, a empresa tem meios para planear e controlar uma série de parâmetros, como os prazos de entrega dos equipamentos a instalar, o número de trabalhadores necessários para desempenhar uma determinada função, os custos associados à mão-de-obra e/ou equipamento, o cumprimento de prazos estabelecidos pela empresa de construção civil e outros dados que possam vir a ser relevantes para a melhoria da rentabilidade dos projetos.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

O presente trabalho, desenvolvido sob a orientação do Prof. Jaime Gabriel Silva, centra-se na procura e aplicação de metodologias de planeamento com apoio de ferramentas informáticas de análise de risco, que permitem realizar, em tempo útil, o cálculo dos prazos resultantes de inúmeras combinações possíveis associadas à incerteza das durações das atividades, recorrendo a modelos estocásticos. O trabalho aborda inicialmente o contexto da Gestão na Construção, com particular enfase na Gestão do Risco. Nessa fase inicial, fez-se também um pequeno inquérito a profissionais com diferentes níveis de responsabilidade organizacional e empresas do setor. A parte fundamental do trabalho, incide nos procedimentos a adotar na elaboração do planeamento de empreitadas. Nesta parte do trabalho, introduzem-se os conceitos da análise de risco com recurso a uma ferramenta informática de apoio, o @Risk, que permite a utilização do Método de Monte Carlo, para obtenção de resultados num contexto de uma tomada de decisão baseada no risco. Refira-se que houve vários contactos com o fornecedor do programa, que permitiram tirar partido de outro programa da Palisade, Evolver, direcionado para otimização matemática, podendo ser utilizado, por exemplo, na perspetiva da minimização dos custos, o que pode interessar pela relação destes com as opções adotadas na elaboração do planeamento de empreendimentos. Finalmente, toma-se um exemplo real do planeamento de uma empreitada em execução à data da realização deste trabalho, onde se aplicaram os conceitos desenvolvidos no trabalho, confrontando os resultados com o andamento da obra.