995 resultados para Caribbean Basin Initiative, 1983-
Resumo:
The Mount Isa Basin is a new concept used to describe the area of Palaeo- to Mesoproterozoic rocks south of the Murphy Inlier and inappropriately described presently as the Mount Isa Inlier. The new basin concept presented in this thesis allows for the characterisation of basin-wide structural deformation, correlation of mineralisation with particular lithostratigraphic and seismic stratigraphic packages, and the recognition of areas with petroleum exploration potential. The northern depositional margin of the Mount Isa Basin is the metamorphic, intrusive and volcanic complex here referred to as the Murphy Inlier (not the "Murphy Tectonic Ridge"). The eastern, southern and western boundaries of the basin are obscured by younger basins (Carpentaria, Eromanga and Georgina Basins). The Murphy Inlier rocks comprise the seismic basement to the Mount Isa Basin sequence. Evidence for the continuity of the Mount Isa Basin with the McArthur Basin to the northwest and the Willyama Block (Basin) at Broken Hill to the south is presented. These areas combined with several other areas of similar age are believed to have comprised the Carpentarian Superbasin (new term). The application of seismic exploration within Authority to Prospect (ATP) 423P at the northern margin of the basin was critical to the recognition and definition of the Mount Isa Basin. The Mount Isa Basin is structurally analogous to the Palaeozoic Arkoma Basin of Illinois and Arkansas in southern USA but, as with all basins it contains unique characteristics, a function of its individual development history. The Mount Isa Basin evolved in a manner similar to many well described, Phanerozoic plate tectonic driven basins. A full Wilson Cycle is recognised and a plate tectonic model proposed. The northern Mount Isa Basin is defined as the Proterozoic basin area northwest of the Mount Gordon Fault. Deposition in the northern Mount Isa Basin began with a rift sequence of volcaniclastic sediments followed by a passive margin drift phase comprising mostly carbonate rocks. Following the rift and drift phases, major north-south compression produced east-west thrusting in the south of the basin inverting the older sequences. This compression produced an asymmetric epi- or intra-cratonic clastic dominated peripheral foreland basin provenanced in the south and thinning markedly to a stable platform area (the Murphy Inlier) in the north. The fmal major deformation comprised east-west compression producing north-south aligned faults that are particularly prominent at Mount Isa. Potential field studies of the northern Mount Isa Basin, principally using magnetic data (and to a lesser extent gravity data, satellite images and aerial photographs) exhibit remarkable correlation with the reflection seismic data. The potential field data contributed significantly to the unravelling of the northern Mount Isa Basin architecture and deformation. Structurally, the Mount Isa Basin consists of three distinct regions. From the north to the south they are the Bowthorn Block, the Riversleigh Fold Zone and the Cloncurry Orogen (new names). The Bowthom Block, which is located between the Elizabeth Creek Thrust Zone and the Murphy Inlier, consists of an asymmetric wedge of volcanic, carbonate and clastic rocks. It ranges from over 10 000 m stratigraphic thickness in the south to less than 2000 min the north. The Bowthorn Block is relatively undeformed: however, it contains a series of reverse faults trending east-west that are interpreted from seismic data to be down-to-the-north normal faults that have been reactivated as thrusts. The Riversleigh Fold Zone is a folded and faulted region south of the Bowthorn Block, comprising much of the area formerly referred to as the Lawn Hill Platform. The Cloncurry Orogen consists of the area and sequences equivalent to the former Mount Isa Orogen. The name Cloncurry Orogen clearly distinguishes this area from the wider concept of the Mount Isa Basin. The South Nicholson Group and its probable correlatives, the Pilpah Sandstone and Quamby Conglomerate, comprise a later phase of now largely eroded deposits within the Mount Isa Basin. The name South Nicholson Basin is now outmoded as this terminology only applied to the South Nicholson Group unlike the original broader definition in Brown et al. (1968). Cored slimhole stratigraphic and mineral wells drilled by Amoco, Esso, Elf Aquitaine and Carpentaria Exploration prior to 1986, penetrated much of the stratigraphy and intersected both minor oil and gas shows plus excellent potential source rocks. The raw data were reinterpreted and augmented with seismic stratigraphy and source rock data from resampled mineral and petroleum stratigraphic exploration wells for this study. Since 1986, Comalco Aluminium Limited, as operator of a joint venture with Monument Resources Australia Limited and Bridge Oil Limited, recorded approximately 1000 km of reflection seismic data within the basin and drilled one conventional stratigraphic petroleum well, Beamesbrook-1. This work was the first reflection seismic and first conventional petroleum test of the northern Mount Isa Basin. When incorporated into the newly developed foreland basin and maturity models, a grass roots petroleum exploration play was recognised and this led to the present thesis. The Mount Isa Basin was seen to contain excellent source rocks coupled with potential reservoirs and all of the other essential aspects of a conventional petroleum exploration play. This play, although high risk, was commensurate with the enormous and totally untested petroleum potential of the basin. The basin was assessed for hydrocarbons in 1992 with three conventional exploration wells, Desert Creek-1, Argyle Creek-1 and Egilabria-1. These wells also tested and confrrmed the proposed basin model. No commercially viable oil or gas was encountered although evidence of its former existence was found. In addition to the petroleum exploration, indeed as a consequence of it, the association of the extensive base metal and other mineralisation in the Mount Isa Basin with hydrocarbons could not be overlooked. A comprehensive analysis of the available data suggests a link between the migration and possible generation or destruction of hydrocarbons and metal bearing fluids. Consequently, base metal exploration based on hydrocarbon exploration concepts is probably. the most effective technique in such basins. The metal-hydrocarbon-sedimentary basin-plate tectonic association (analogous to Phanerozoic models) is a compelling outcome of this work on the Palaeo- to Mesoproterozoic Mount lsa Basin. Petroleum within the Bowthom Block was apparently destroyed by hot brines that produced many ore deposits elsewhere in the basin.
Resumo:
Every day we hear someone complain that this or that patent should not have been granted. People complain that the patent system is now a threat to existing business and innovation be- cause the patent office grants with alarming regularity patents for inventions that are neither novel nor non-obvious. People argue that the patent office cannot keep up with the job of examining the backlog of hundreds of thousands of patents and that, even if it could, the large volumes of prior art literature that need to be considered each time a patent application is received make the decision as to whether a patent should be granted or not a treacherous one.
Resumo:
The business of helping children to grow up as ‘custodians’, or ‘future managers’ of the Murray-Darling Basin is not simple, and that single sources of information and ways of seeing the environment are not enough. Children (and adults) need to be able to relate individually, emotionally and aesthetically to their places if they are to learn to love them. However, they also need access to a variety of ways of thinking and seeing those same places if they are to be able to take action to sustain them – action that inevitably involves forms of communication with their fellow citizens. This chapter documents the writing and art program Special Forever, with its focus on communications, as an important intervention into promoting eco-social sustainability.
Resumo:
Aims: The primary objective was to describe the usage pattern of hormone therapy (HT) in a sample of urban Australian women in 2001 and to assess the characteristics of users vs. non-users. The second objective was to determine whether there had been any change in usage since the publication of the results of the combined oestrogen plus progestagen arm of the Women's Health Initiative (WHI) in 2002. Methods: A cohort of 374 postmenopausal women aged 50–80 years participated in this substudy of the LAW (Longitudinal Assessment of Ageing in Women) project: a 5-year multidisciplinary, observational study. Participants completed an annual medical assessment including details of the use of HT and the reasons for use, as well as demographic and psychosocial data. Results: In December 2001, 30.8% of the participants were using HT, whereas 55.4% were ever users. The management of vasomotor symptoms and mood disturbance were the primary reasons for use. Of those who had been using HT in December 2001 (24.4%) women ceased using HT in the 3 months following publication of the WHI results. The percentage of women using HT in December 2003 (13.9%) was less than half of that of December 2001. Conclusion: The rate of HT use and the reasons for use, in 2001 in Brisbane was similar to that of other Australian regions. Usage of HT decreased since the publication of the WHI results in 2002 which may reflect changing attitudes by patients and practitioners regarding HT.
Resumo:
Objective: This paper describes the first phase of a larger project that utilizes participatory action research to examine complex mental health needs across an extensive group of stakeholders in the community. Method: Within an objective qualitative analysis of focus group discussions the social ecological model is utilized to explore how integrative activities can be informed, planned and implemented across multiple elements and levels of a system. Seventy-one primary care workers, managers, policy-makers, consumers and carers from across the southern metropolitan and Gippsland regions of Victoria, Australia took part in seven focus groups. All groups responded to an identical set of focusing questions. Results: Participants produced an explanatory model describing the service system, as it relates to people with complex needs, across the levels of social ecological analysis. Qualitative themes analysis identified four priority areas to be addressed in order to improve the system's capacity for working with complexity. These included: (i) system fragmentation; (ii) integrative case management practices; (iii) community attitudes; and (iv) money and resources. Conclusions: The emergent themes provide clues as to how complexity is constructed and interpreted across the system of involved agencies and interest groups. The implications these findings have for the development and evaluation of this community capacity-building project were examined from the perspective of constructing interventions that address both top-down and bottom-up processes.
Resumo:
In a world of intense competition, Six Sigma is considered to be an important management philosophy, supporting organisations in their efforts to obtain satisfied customers. As financial service organisations have been slow to adopt Six Sigma, issues concerning its implementation are of major importance. For its implementation a large number of tools and techniques have been suggested by academics and practitioners. Intriguingly, despite the extensive effort that has been invested and benefits that can be obtained, the systematic implementation of Six Sigma in financial service organisations is limited. This paper presents a conceptual framework derived from literature and empirical results with a focus on financial services. Using this framework a financial service company should be able to cope with the relevant critical success factors. Thus, the framework allows identifying relevant aspects for a sustainable and successful implementation of a Six Sigma initiative.
Resumo:
Government programs to finance small firms or start-ups have attracted a little empirical attention. From an economical perspective, the effect of government grants is evaluated by a measure of innovation or firm productivity. Yet, this paper takes a different approach from economical view aiming to address the research question “How do start ups firms view the relationship between government grants and their co-efficient innovation effort?” Semi-structured interviews with grant recipients (start-up business owners revealed that the grants assist firms to leverage their resource limitations but at the same time the grants also act as a major roadblock for their product development success.
Resumo:
The National Hand Hygiene Initiative, implemented in Australia in 2009, is currently being evaluated for effectiveness and cost-effectiveness by a multidisciplinary team of researchers. Data from a wide range of sources are being harvested to address the research questions. The data are observational and appropriate statistical and economic modelling methods are being used. Decision makers will be provided with new knowledge about how hand hygiene interventions should be organised and what investment decisions are justified. This is novel research and the authors are unaware of any other evaluation of hand hygiene improvement initiatives. This paper describes the evaluation currently underway.