930 resultados para harvest scheduling


Relevância:

20.00% 20.00%

Publicador:

Resumo:

A report by the Iowa Department of Natural Resources on the trends of Iowa wildlife populations and harvest.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A report by the Iowa Department of Natural Resources on the trends of Iowa wildlife populations and harvest.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A report by the Iowa Department of Natural Resources on the trends of Iowa wildlife populations and harvest.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A report by the Iowa Department of Natural Resources on the trends of Iowa wildlife populations and harvest.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A report by the Iowa Department of Natural Resources on the trends of Iowa wildlife populations and harvest.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The objective of this work was to evaluate the effect on forage yield of sowing winter forage species before and after soybean harvest, at different nitrogen application levels. The experiment was set out in a randomized block design with a strip-split plot arrangement, and three replicates. Sowing methods (18 days before soybean harvest and six days after soybean harvest) were allocated in the main plots, and the combination among forage species (Avena strigosa cv. IAPAR 61 + Lolium multiflorum; A. strigosa cv. Comum + L. multiflorum; A. strigosa cv. Comum + L. multiflorum + Vicia villosa; A. strigosa cv. Comum + L. multiflorum + Raphanus sativus; and L. multiflorum) and nitrogen levels (0, 140, 280 and 420 kg ha-1) in the plots and subplots, respectively. Forage sowing before the soybean harvest made it possible to anticipate first grazing by 14 days, with satisfactory establishment of forage species without affecting forage production. This method permitted a longer grazing period, preventing the need for soil disking, besides allowing the use of no-tillage system. The mixture of forage species enables higher forage yield for pasture in relation to single species pastures, with response to nitrogen fertilization up to 360 kg ha-1.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report proposes, that for certain types of highway construction projects undertaken by the Iowa Department of Transportation, a scheduling technique commonly referred to as linear scheduling may be more effective than the Critical Path Method scheduling technique that is currently being used. The types of projects that appear to be good candidates for the technique are those projects that have a strong linear orientation. Like a bar chart, this technique shows when an activity is scheduled to occur and like a CPM schedule it shows the sequence in which activities are expected to occur. During the 1992 construction season, the authors worked with an inlay project on Interstate 29 to demonstrate the linear scheduling technique to the Construction Office. The as-planned schedule was developed from the CPM schedule that the contractor had developed for the project. Therefore, this schedule represents what a linear representation of a CPM schedule would look like, and not necessarily what a true linear schedule would look like if it had been the only scheduling technique applied to the project. There is a need to expand the current repertoire of scheduling techniques to address those projects for which the bar chart and CPM may not be appropriate either because of the lack of control information or due to overly complex process for the actual project characteristics. The scheduling approaches used today on transportation projects have many shortcomings for properly modeling the real world constraints and conditions which are encountered. Linear project's predilection for activities with variable production rates, a concept very difficult to handle with the CPM, is easily handled and visualized with the linear technique. It is recommended that work proceed with the refinement of the method of linear scheduling described above and the development of a microcomputer based system for use by the Iowa Department of Transportation and contractors for its implementation. The system will be designed to provide the information needed to adjust schedules in a rational understandable method for monitoring progress on the projects and alerting Iowa Department of Transportation personnel when the contractor is deviating from the plan.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The objective of this work was to assess the effect of different periods of water stress before harvest of pepper-rosmarin (Lippia sidoides) on the contents of essential oil and flavonoids. The experiment was carried out during 270 days of cultivation, with drainage lysimeters, in a completely randomized block design with five treatments: 0, 2, 4, 6, and 8 days of water suppression before harvest, with four replicates. Fresh and dry matter yield, essential oil content, total flavonoids content, and water potential and temperature of leaves were determined. There was a decrease of approximately 50% in oil content and of 60% in total flavonoid content with the reduction of leaf water potential in 0.3 MPa. Essential oil is more sensitive to water stress than total flavonoids.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The objective of this work was to test methods for pre-harvest sprouting assessment in wheat cultivars. Fourteen wheat cultivars were grown in Londrina and Ponta Grossa municipalities, Paraná state, Brazil. They were sampled at 10 and 17 days after physiological maturity and evaluated using the methods of germination by rainfall simulation (in a greenhouse), in-ear grain sprouting, and grains removed from the ears. The in-ear grain sprouting method allowed the differentiation of cultivars, but showed different resistance levels from the available description of cultivars. The sprouting of grain removed from the ears did not allow a reliable distinction of data on germination in any harvest date or location. The method of rainfall simulation is the most suitable for the assessment of cultivars as to pre-harvest sprouting, regardless of the sampling date and evaluated location.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Peer-reviewed

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This article presents an optimization methodology of batch production processes assembled by shared resources which rely on a mapping of state-events into time-events allowing in this way the straightforward use of a well consolidated scheduling policies developed for manufacturing systems. A technique to generate the timed Petri net representation from a continuous dynamic representation (Differential-Algebraic Equations systems (DAEs)) of the production system is presented together with the main characteristics of a Petri nets-based tool implemented for optimization purposes. This paper describes also how the implemented tool generates the coverability tree and how it can be pruned by a general purpose heuristic. An example of a distillation process with two shared batch resources is used to illustrate the optimization methodology proposed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The objective of this work was to determine the efficiency of the Papadakis method on the quality evaluation of experiments with multiple-harvest oleraceous crops, and on the estimate of the covariate and the ideal plot size. Data from nine uniformity trials (five with bean pod, two with zucchini, and two with sweet pepper) and from one experiment with treatments (with sweet pepper) were used. Through the uniformity trials, the best way to calculate the covariate was defined and the optimal plot size was calculated. In the experiment with treatments, analyses of variance and covariance were performed, in which the covariate was calculated by the Papadakis method, and experimental precision was evaluated based on four statistics. The use of analysis of covariance with the covariate obtained by the Papadakis method increases the quality of experiments with multiple-harvest oleraceous crops and allows the use of smaller plot sizes. The best covariate is the one that considers a neighboring plot of each side of the reference plot.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Tutkimuksen päätavoite on arvioida, ovatko neljä ohjelmistovaihtoehtoa riittäviä tuotannon aikataulutuksen työkaluja ja mikä työkaluista sopii toimeksiantajayritykselle. Alatavoitteena on kuvata tuotannon aikataulutuksen nyky- ja tahtotila prosessimallinnuksen avulla, selvittää työkalun käyttäjätarpeet ja määritellä priorisoidut valintakriteerit työkalulle.Tutkimuksen teoriaosuudessa tutkitaan tuotannon aikataulutuksen logiikkaa ja haasteita. Työssä tarkastellaan aikataulutusohjelmiston valintaa rinnakkain prosessinmallinnuksen kanssa. Aikataulutusohjelmistovaihtoehdot ja metodit käyttäjätarpeiden selvittämiseksi käydään läpi. Empiriaosuudessa selvitetään tutkimuksen suhde toimeksiantajayrityksen strategiaan. Käyttäjätarpeet selvitetään haastattelujen avulla jaanalysoidaan QFD matriisin avulla. Toimeksiantajayrityksen tuotannon aikataulutuksen nyky- ja tahtotilaprosessit mallinnetaan, jotta ohjelmistojen sopivuutta, aikataulutusprosessia tukevana työkaluna voidaan arvioida.Tutkimustuloksena ovatpriorisoidut valintakriteerit aikataulutustyökalulle eli käyttäjätarpeista johdetut tärkeimmät toiminnalliset ominaisuudet, järjestelmätoimittaja-arvio sekä suositukset jatkotoimenpiteistä ja lisätutkimuksesta.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The object of this project is to schedule a ctitious European basketball competition with many teams situated a long distances. The schedule must be fair, feasible and economical, which means that the total distance trav- eled by every team must be the minimal possible. First, we de ne the sport competition terminology and study di erent competition systems, focusing on the NBA and the Euroleague systems. Then we de ne concepts of graph theory and spherical distance that will be needed. Next we propose a com- petition system, explaining where will be allocated the teams and how will be the scheduling. Then there is a description of the programs that have been implemented, and, nally, the complete schedule is displayed, and some possible improvements are mentioned.