816 resultados para Partnership Principles


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This book was created as postgraduate lecture notes for Lappeenranta University of Technology's special course of steam power plants. But as with anything ever written the ideas shown have nurtured for a long time. Parts of these chapters have appeared elsewhere as individual papers or work documents. One of the most helpful episodes have been presentations and discussions during Pohto Operator training seminars. Input from those sessions can be seen in chapter firing. You who run recovery boilers, I salute you. The purpose of this text is to give the reader an overview of recovery boiler operation. Most parts of the recovery boiler operation are common to boilers burning other fuels. The furnace operation differs significantly from operation of other boiler furnaces. Oxygen rich atmosphere is needed to burn fuel efficiently. But the main function of recovery boiler is to reduce spent cooking chemicals. Reduction reactions happen best in oxygen deficient atmosphere. This dual, conflicting nature of recovery furnace makes understanding it so challenging. To understand the processes happening in the recovery furnace one must try to understand the detailed processes that might occur and their limitations. Therefore chapters on materials, corrosion and fouling have been added.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Imagine the potential implications of an organization whose business and IT processes are well aligned and are capable of reactively and proactively responding to the external and internal changes. The Philips IT Infrastructure and Operations department (I&O) is undergoing a series of transformation activities to help Philips business keeping up with the changes. I&O would serve a critical function in any business sectors; given that the I&Os strategy switched from design, build and run to specify, acquire and performance manage, that function is amplified. In 2013, I&Os biggest transforming programme I&O Futures engaged multiple interdisciplinary departments and programs on decommissioning legacy processes and restructuring new processes with respect to the Information Technology Internet Library (ITIL), helping I&O to achieve a common infrastructure and operating platform (CI&OP). The author joined I&O Futures in the early 2014 and contributed to the CI&OP release 1, during which a designed model Bing Box and its evaluations were conducted through the lens of six sigmas structured define-measure-analyze-improve-control (DMAIC) improvement approach. This Bing Box model was intended to firstly combine business and IT principles, namely Lean IT, Agile, ITIL best practices, and Aspect-oriented programming (AOP) into a framework. Secondly, the author implemented the modularized optimization cycles according to the defined framework into Philips ITIL-based processes and, subsequently, to enhance business process performance as well as to increase efficiency of the optimization cycles. The unique of this thesis is that the Bing Box model not only provided comprehensive optimization approaches and principles for business process performance, but also integrated and standardized optimization modules for the optimization process itself. The research followed a design research guideline that seek to extend the boundaries of human and organizational capabilities by creating new and innovative artifacts. The Chapter 2 firstly reviewed the current research on Lean Six Sigma, Agile, AOP and ITIL, aiming at identifying the broad conceptual bases for this study. In Chapter 3, we included the process of constructing the Bing Box model. The Chapter 4 described the adoption of Bing Box model: two-implementation case validated by stakeholders through observations and interviews. Chapter 5 contained the concluding remarks, the limitation of this research work and the future research areas. Chapter 6 provided the references used in this thesis.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The investments have always been considered as an essential backbone and so-called locomotive for the competitive economies. However, in various countries, the state has been put under tight budget constraints for the investments in capital intensive projects. In response to this situation, the cooperation between public and private sector has grown based on public-private mechanism. The promotion of favorable arrangement for collaboration between public and private sectors for the provision of policies, services, and infrastructure in Russia can help to address the problems of dry ports development that neither municipalities nor the private sector can solve alone. Especially, the stimulation of public-private collaboration is significant under the exposure to externalities that affect the magnitude of the risks during all phases of project realization. In these circumstances, the risk in the projects also is becoming increasingly a part of joint research and risk management practice, which is viewed as a key approach, aiming to take active actions on existing global and specific factors of uncertainties. Meanwhile, a relatively little progress has been made on the inclusion of the resilience aspects into the planning process of a dry ports construction that would instruct the capacity planner, on how to mitigate the occurrence of disruptions that may lead to million dollars of losses due to the deviation of the future cash flows from the expected financial flows on the project. The current experience shows that the existing methodological base is developed fragmentary within separate steps of supply chain risk management (SCRM) processes: risk identification, risk evaluation, risk mitigation, risk monitoring and control phases. The lack of the systematic approach hinders the solution of the problem of risk management processes of dry port implementation. Therefore, management of various risks during the investments phases of dry port projects still presents a considerable challenge from the practical and theoretical points of view. In this regard, the given research became a logical continuation of fundamental research, existing in the financial models and theories (e.g., capital asset pricing model and real option theory), as well as provided a complementation for the portfolio theory. The goal of the current study is in the design of methods and models for the facilitation of dry port implementation through the mechanism of public-private partnership on the national market that implies the necessity to mitigate, first and foremost, the shortage of the investments and consequences of risks. The problem of the research was formulated on the ground of the identified contradictions. They rose as a continuation of the trade-off between the opportunities that the investors can gain from the development of terminal business in Russia (i.e. dry port implementation) and risks. As a rule, the higher the investment risk, the greater should be their expected return. However, investors have a different tolerance for the risks. That is why it would be advisable to find an optimum investment. In the given study, the optimum relates to the search for the efficient portfolio, which can provide satisfaction to the investor, depending on its degree of risk aversion. There are many theories and methods in finance, concerning investment choices. Nevertheless, the appropriateness and effectiveness of particular methods should be considered with the allowance of the specifics of the investment projects. For example, the investments in dry ports imply not only the lump sum of financial inflows, but also the long-term payback periods. As a result, capital intensity and longevity of their construction determine the necessity from investors to ensure the return on investment (profitability), along with the rapid return on investment (liquidity), without precluding the fact that the stochastic nature of the project environment is hardly described by the formula-based approach. The current theoretical base for the economic appraisals of the dry port projects more often perceives net present value (NPV) as a technique superior to other decision-making criteria. For example, the portfolio theory, which considers different risk preference of an investor and structures of utility, defines net present value as a better criterion of project appraisal than discounted payback period (DPP). Meanwhile, in business practice, the DPP is more popular. Knowing that the NPV is based on the assumptions of certainty of project life, it cannot be an accurate appraisal approach alone to determine whether or not the project should be accepted for the approval in the environment that is not without of uncertainties. In order to reflect the period or the projects useful life that is exposed to risks due to changes in political, operational, and financial factors, the second capital budgeting criterion discounted payback period is profoundly important, particularly for the Russian environment. Those statements represent contradictions that exist in the theory and practice of the applied science. Therefore, it would be desirable to relax the assumptions of portfolio theory and regard DPP as not fewer relevant appraisal approach for the assessment of the investment and risk measure. At the same time, the rationality of the use of both project performance criteria depends on the methods and models, with the help of which these appraisal approaches are calculated in feasibility studies. The deterministic methods cannot ensure the required precision of the results, while the stochastic models guarantee the sufficient level of the accuracy and reliability of the obtained results, providing that the risks are properly identified, evaluated, and mitigated. Otherwise, the project performance indicators may not be confirmed during the phase of project realization. For instance, the economic and political instability can result in the undoing of hard-earned gains, leading to the need for the attraction of the additional finances for the project. The sources of the alternative investments, as well as supportive mitigation strategies, can be studied during the initial phases of project development. During this period, the effectiveness of the investments undertakings can also be improved by the inclusion of the various investors, e.g. Russian Railways enterprises and other private companies in the dry port projects. However, the evaluation of the effectiveness of the participation of different investors in the project lack the methods and models that would permit doing the particular feasibility study, foreseeing the quantitative characteristics of risks and their mitigation strategies, which can meet the tolerance of the investors to the risks. For this reason, the research proposes a combination of Monte Carlo method, discounted cash flow technique, the theory of real options, and portfolio theory via a system dynamics simulation approach. The use of this methodology allows for comprehensive risk management process of dry port development to cover all aspects of risk identification, risk evaluation, risk mitigation, risk monitoring, and control phases. A designed system dynamics model can be recommended for the decision-makers on the dry port projects that are financed via a public-private partnership. It permits investors to make a decision appraisal based on random variables of net present value and discounted payback period, depending on different risks factors, e.g. revenue risks, land acquisition risks, traffic volume risks, construction hazards, and political risks. In this case, the statistical mean is used for the explication of the expected value of the DPP and NPV; the standard deviation is proposed as a characteristic of risks, while the elasticity coefficient is applied for rating of risks. Additionally, the risk of failure of project investments and guaranteed recoupment of capital investment can be considered with the help of the model. On the whole, the application of these modern methods of simulation creates preconditions for the controlling of the process of dry port development, i.e. making managerial changes and identifying the most stable parameters that contribute to the optimal alternative scenarios of the project realization in the uncertain environment. System dynamics model allows analyzing the interactions in the most complex mechanism of risk management process of the dry ports development and making proposals for the improvement of the effectiveness of the investments via an estimation of different risk management strategies. For the comparison and ranking of these alternatives in their order of preference to the investor, the proposed indicators of the efficiency of the investments, concerning the NPV, DPP, and coefficient of variation, can be used. Thus, rational investors, who averse to taking increased risks unless they are compensated by the commensurate increase in the expected utility of a risky prospect of dry port development, can be guided by the deduced marginal utility of investments. It is computed on the ground of the results from the system dynamics model. In conclusion, the outlined theoretical and practical implications for the management of risks, which are the key characteristics of public-private partnerships, can help analysts and planning managers in budget decision-making, substantially alleviating the effect from various risks and avoiding unnecessary cost overruns in dry port projects.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This research acknowledges the difficulties experienced by teachers presenting integrated arts curricula. Instructional support is offered by arts organizations that provide arts partnerships with local schools boards. The study focuses on the experiences of 8 teachers from a Catholic school board in southern Ontario who participated in integrated arts programs offered by The Royal Conservatory of Music's Learning Through the Arts (LTTATM) program and a local art gallery's Art Based Integrated Learning (ABIL) program and examines their responses to the programs and their perception of personal and professional development through this association. Additionally, questions were posed to the . "aftisfs"from-tneSe]Jfograrrrs;-and"they liiscussedhow"participating in-collaboration with teachers in the development of in-school programs enabled them to experience personal and professional development as well. Seven themes emerged from the data. These themes included: teachers' feelings of a lack of preparedness to teach the arts; the value of the arts and arts partnerships in schools; the role of the artists in the education of teachers; professional development for both teachers and artists; the development of collegiality; perceptions of student engagement; and the benefits and obstacles of integrating the arts into the curriculum. This document highlights the benefits to both teachers and artists of arts partnerships between schools and outside arts organizations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study examined the strategies used by elementary school principals to facilitate and nurture the development of professional learning communities (PLC) within their school settings. Using a reputational sample of administrators whose schools were demonstrating observable characteristics of PLCs, this study documented and described the strategies and actions taken by the principals to move their schools forward. Data collection included the use of open-ended interviews as well as observations capturing the means by which the principals addressed the areas of culture, processes, and structures within their school setting. A grounded theory approach to data analysis uncovered 4 guiding principles used by the principals to facilitate the development of the PLCs within their school: (a) protecting the purpose; (b) attending to relationships; (c) sharing the responsibility; and (d) valuing the journey. The guiding principles were used by each administrator to anchor the decisions they made and develop responsive, contextspecific strategies to support the PLC at their school. The results highlighted the complex role of the principal and the supports required to tackle the difficult work of facilitating PLCs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Efforts to reform the public sector reflect the social, political and economic environment within which government must function. The recent demands by the public for more consensual decision-making, as well as more efficient, effective and responsive public service, have resulted in a number of reform initiatives, including an emphasis on partnership development. The purpose of this thesis is to examine partnership arrangements within the public sector. Specifically, the thesis will assess the value of partnerships and their impact on government by examining six partnership arrangements involving the Ontario Ministry of Natural Resources (OMNR). The OMNR, having recently been awarded the 1992 Institute of Public Administration of Canada Award for Innovative Management, on the theme of partnership development, is being lauded as an example for other government agencies considering similar alliances. The thesis begins by introducing the concept and practice of partnership within the public sector in general and the OMNR specifically. Descriptive analysis of six OMNR partnerships is provided and a number of criteria are used to determine the success of each of these arrangements. Special attention is paid to the political implications of partnerships and to those attributes which appear to contribute to the successful establishment and iii maintenance of partnership arrangements. The conclusion is drawn that partnerships provide the government with an opportunity to address public demands for greater involvement in decision-making while accommodating government's limited financial resources. However, few truly collaborative partnerships exist within the public sector. There are also significant political implications associated with partnerships which must be dealt with both at the political and bureaucratic levels of government. Lastly, it is argued that while partnerships within the OMNR are experiencing some difficulties, they constitute a genuine attempt to broaden the base of decision-making and to incorporate the concerns of stakeholders into resource management.