928 resultados para Management of protected areas
Resumo:
In 1975, the gray wolf (Canis lupus) population in Minnesota was protected by the federal Endangered Species Act (USA). At that time, there were 500-750 wolves. By 2004, the population had grown to an estimated 3,020 wolves. Over time, conflicts between wolves and livestock increased. Wolf depredation control programs have been conducted by the U.S. Fish and Wildlife Service (1975-1986) and by the U.S. Department of Agriculture’s Wildlife Services program (1986 to present). In 1978, Minnesota’s wolves were reclassified from endangered to threatened which allowed authorized federal agents to lethally remove wolves that had depredated on livestock or pets. A State funded wolf compensation program was also established in 1978. Wildlife Services’ wolf damage management approach utilizes both nonlethal and lethal methods of control. Currently, wolf depredations are verified at 60-85 farms annually and 125-175 wolves are taken each year. Wolf compensation payments to livestock producers have averaged $67,111 per year during the past five years. Most livestock losses occur during spring and summer. Selective removal of depredating wolves, coupled with improvements in animal husbandry practices, has potential for reducing wolf-livestock conflicts. Minnesota’s wolf population is currently considered to be fully recovered and federal delisting is expected to occur in the near future.
Resumo:
This NebGuide describes the life cycle of the army cutworm and pale western cutworm, and provides recommendations for management.The army cutworm, Euxoa auxiliaris, and the pale western cutworm, Agrotis orthogonia, are sporadic pests that are distributed throughout the Great Plains. The army cutworm can be found throughout Nebraska, but is more common in the western half of the state. Because of the drier environment, the pale western cutworm is found only in the western third of Nebraska. Both cutworms can feed on a vast array of crops and weeds. Their major economic impact is limited to winter wheat and alfalfa, because these are the vulnerable crops growing in the early spring when larval feeding activity occurs. However, they can also cause substantial damage to early spring row crops (sugarbeets and corn), especially in areas where winter cereal cover crops are used.
Resumo:
The neural control of the cardiovascular system is a complex process that involves many structures at different levels of nervous system. Several cortical areas are involved in the control of systemic blood pressure, such as the sensorimotor cortex, the medial prefrontal cortex and the insular cortex. Non-invasive brain stimulation techniques - repetitive transcranial magnetic stimulation (rTMS) and transcranial direct current stimulation (tDCS) - induce sustained and prolonged functional changes of the human cerebral cortex. rTMS and tDCS has led to positive results in the treatment of some neurological and psychiatric disorders. Because experiments in animals show that cortical modulation can be an effective method to regulate the cardiovascular system, non-invasive brain stimulation might be a novel tool in the therapeutics of human arterial hypertension. We here review the experimental evidence that non-invasive brain stimulation can influence the autonomic nervous system and discuss the hypothesis that focal modulation of cortical excitability by rTMS or tDCS can influence sympathetic outflow and, eventually, blood pressure, thus providing a novel therapeutic tool for human arterial hypertension. (C) 2009 Published by Elsevier Ltd.
Resumo:
Abstract Background This article aims to discuss the incorporation of traditional time in the construction of a management scenario for pink shrimp in the Patos Lagoon estuary (RS), Brazil. To meet this objective, two procedures have been adopted; one at a conceptual level and another at a methodological level. At the conceptual level, the concept of traditional time as a form of traditional ecological knowledge (TEK) was adopted. Method At the methodological level, we conduct a wide literature review of the scientific knowledge (SK) that guides recommendations for pink shrimp management by restricting the fishing season in the Patos Lagoon estuary; in addition, we review the ethno-scientific literature which describes traditional calendars as a management base for artisanal fishers in the Patos Lagoon estuary. Results Results demonstrate that TEK and SK describe similar estuarine biological processes, but are incommensurable at a resource management level. On the other hand, the construction of a “management scenario” for pink shrimp is possible through the development of “criteria for hierarchies of validity” which arise from a productive dialog between SK and TEK. Conclusions The commensurable and the incommensurable levels reveal different basis of time-space perceptions between traditional ecological knowledge and scientific knowledge. Despite incommensurability at the management level, it is possible to establish guidelines for the construction of “management scenarios” and to support a co-management process.
Resumo:
One of contemporary environmental issues refers to progressive and diverse generation of solid waste in urban areas or specific, and requires solutions because the traditional methods of treatment and disposal are becoming unviable over the years and, consequently, a significant contingent of these wastes presents final destination inappropriate. The diversity of solid waste generated as a result of human activities must have the appropriate allocation to specific legislation in force, such as landfill, incineration, among other procedures established by the competent bodies. Thus, also the waste generated in port activities or proceeding vessels require classification and segregation for proper disposal later. This article aims at presenting a methodology for the collection, transportation, treatment and disposal of solid waste port and also application of automation technology that makes possible the implementation of the same.
Resumo:
Elasmobranch stock assessment studies are usually made through fisheries surveys data. However, in large marine protected areas (MPAs) the use of destructive techniques must be dismissed in order to avoid population impacts. In 2005, while conducting a marine habitat survey in two marine Special Areas of Conservation (Sebadales de Playa de Inglés and Franja Marina de Mogán) in south Gran Canary Island (Canary Islands, Spain) with underwater towed video (UTV) and underwater visual census (UVC) transects, we recognized the opportunity rose to assess elasmobranch populations through UTV. Number of observed species and specimens, overall field work effort and total surveyed area were determined and compared between methods. Mean observations per day per unit of time (MOPUT) and mean observations per day per unit of surveyed area (MOPUA) were also compared through Mann–Whitney rank sum statistical test (α=0.05). Data analysis demonstrated that UTV is a very useful tool to rapidly assess elasmobranch populations in large MPAs in good visibility underwater environments. It can assess larger areas than UVC with the same effort (statistically significant difference found for the MOPUT; p=<0.001), leading to more observed species (5 vs 2) and specimens (46 vs 3) per day of work, with no loss in resolution power (MOPUA values were not significantly different between UTV and UVC; p=0.104).
Resumo:
Asset Management (AM) is a set of procedures operable at the strategic-tacticaloperational level, for the management of the physical asset’s performance, associated risks and costs within its whole life-cycle. AM combines the engineering, managerial and informatics points of view. In addition to internal drivers, AM is driven by the demands of customers (social pull) and regulators (environmental mandates and economic considerations). AM can follow either a top-down or a bottom-up approach. Considering rehabilitation planning at the bottom-up level, the main issue would be to rehabilitate the right pipe at the right time with the right technique. Finding the right pipe may be possible and practicable, but determining the timeliness of the rehabilitation and the choice of the techniques adopted to rehabilitate is a bit abstruse. It is a truism that rehabilitating an asset too early is unwise, just as doing it late may have entailed extra expenses en route, in addition to the cost of the exercise of rehabilitation per se. One is confronted with a typical ‘Hamlet-isque dilemma’ – ‘to repair or not to repair’; or put in another way, ‘to replace or not to replace’. The decision in this case is governed by three factors, not necessarily interrelated – quality of customer service, costs and budget in the life cycle of the asset in question. The goal of replacement planning is to find the juncture in the asset’s life cycle where the cost of replacement is balanced by the rising maintenance costs and the declining level of service. System maintenance aims at improving performance and maintaining the asset in good working condition for as long as possible. Effective planning is used to target maintenance activities to meet these goals and minimize costly exigencies. The main objective of this dissertation is to develop a process-model for asset replacement planning. The aim of the model is to determine the optimal pipe replacement year by comparing, temporally, the annual operating and maintenance costs of the existing asset and the annuity of the investment in a new equivalent pipe, at the best market price. It is proposed that risk cost provide an appropriate framework to decide the balance between investment for replacing or operational expenditures for maintaining an asset. The model describes a practical approach to estimate when an asset should be replaced. A comprehensive list of criteria to be considered is outlined, the main criteria being a visà- vis between maintenance and replacement expenditures. The costs to maintain the assets should be described by a cost function related to the asset type, the risks to the safety of people and property owing to declining condition of asset, and the predicted frequency of failures. The cost functions reflect the condition of the existing asset at the time the decision to maintain or replace is taken: age, level of deterioration, risk of failure. The process model is applied in the wastewater network of Oslo, the capital city of Norway, and uses available real-world information to forecast life-cycle costs of maintenance and rehabilitation strategies and support infrastructure management decisions. The case study provides an insight into the various definitions of ‘asset lifetime’ – service life, economic life and physical life. The results recommend that one common value for lifetime should not be applied to the all the pipelines in the stock for investment planning in the long-term period; rather it would be wiser to define different values for different cohorts of pipelines to reduce the uncertainties associated with generalisations for simplification. It is envisaged that more criteria the municipality is able to include, to estimate maintenance costs for the existing assets, the more precise will the estimation of the expected service life be. The ability to include social costs enables to compute the asset life, not only based on its physical characterisation, but also on the sensitivity of network areas to social impact of failures. The type of economic analysis is very sensitive to model parameters that are difficult to determine accurately. The main value of this approach is the effort to demonstrate that it is possible to include, in decision-making, factors as the cost of the risk associated with a decline in level of performance, the level of this deterioration and the asset’s depreciation rate, without looking at age as the sole criterion for making decisions regarding replacements.
Resumo:
Throughout the alpine domain, shallow landslides represent a serious geologic hazard, often causing severe damages to infrastructures, private properties, natural resources and in the most catastrophic events, threatening human lives. Landslides are a major factor of landscape evolution in mountainous and hilly regions and represent a critical issue for mountainous land management, since they cause loss of pastoral lands. In several alpine contexts, shallow landsliding distribution is strictly connected to the presence and condition of vegetation on the slopes. With the aid of high-resolution satellite images, it's possible to divide automatically the mountainous territory in land cover classes, which contribute with different magnitude to the stability of the slopes. The aim of this research is to combine EO (Earth Observation) land cover maps with ground-based measurements of the land cover properties. In order to achieve this goal, a new procedure has been developed to automatically detect grass mantle degradation patterns from satellite images. Moreover, innovative surveying techniques and instruments are tested to measure in situ the shear strength of grass mantle and the geomechanical and geotechnical properties of these alpine soils. Shallow landsliding distribution is assessed with the aid of physically based models, which use the EO-based map to distribute the resistance parameters across the landscape.
Resumo:
We use a conceptual model to investigate how randomly varying building heights within a city affect the atmospheric drag forces and the aerodynamic roughness length of the city. The model is based on the assumptions regarding wake spreading and mutual sheltering effects proposed by Raupach (Boundary-Layer Meteorol 60:375-395, 1992). It is applied both to canopies having uniform building heights and to those having the same building density and mean height, but with variability about the mean. For each simulated urban area, a correction is determined, due to height variability, to the shear stress predicted for the uniform building height case. It is found that u (*)/u (*R) , where u (*) is the friction velocity and u (*R) is the friction velocity from the uniform building height case, is expressed well as an algebraic function of lambda and sigma (h) /h (m) , where lambda is the frontal area index, sigma (h) is the standard deviation of the building height, and h (m) is the mean building height. The simulations also resulted in a simple algebraic relation for z (0)/z (0R) as a function of lambda and sigma (h) /h (m) , where z (0) is the aerodynamic roughness length and z (0R) is z (0) found from the original Raupach formulation for a uniform canopy. Model results are in keeping with those of several previous studies.
Resumo:
PURPOSE: The purpose was to study the emergency management of patients with suspected meningitis to identify potential areas for improvement. METHODS: All patients who underwent cerebrospinal fluid puncture at the emergency department of the University Hospital of Bern from January 31, 2004, to October 30, 2008, were included. A total of 396 patients were included in the study. For each patient, we analyzed the sequence and timing for the following management steps: first contact with medical staff, administration of the first antibiotic dose, lumbar puncture (LP), head imaging, and blood cultures. The results were analyzed in relation to clinical characteristics and the referral diagnosis on admission. RESULTS: Of the 396 patient analyzed, 15 (3.7%) had a discharge diagnosis of bacterial meningitis, 119 (30%) had nonbacterial meningitis, and 262 (66.3%) had no evidence of meningitis. Suspicion of meningitis led to earlier antibiotic therapy than suspicion of an acute cerebral event or nonacute cerebral event (P < .0001). In patients with bacterial meningitis, the average time to antibiotics was 136 minutes, with a range of 0 to 340 minutes. Most patients (60.1%) had brain imaging studies performed before LP. On the other hand, half of the patients with a referral diagnosis of meningitis (50%) received antibiotics before performance of an LP. CONCLUSIONS: Few patients with suspected meningitis received antimicrobial therapy within the first 30 minutes after arrival, but most patients with pneumococcal meningitis and typical symptoms were treated early; patients with bacterial meningitis who received treatment late had complex medical histories or atypical presentations.
Resumo:
Invasive plant species threaten natural areas by reducing biodiversity and altering ecosystem functions. They also impact agriculture by reducing crop and livestock productivity. Millions of dollars are spent on invasive species control each year, and traditionally, herbicides are used to manage invasive species. Herbicides have human and environmental health risks associated with them; therefore, it is essential that land managers and stakeholders attempt to reduce these risks by utilizing the principles of integrated weed management. Integrated weed management is a practice that incorporates a variety of measures and focuses on the ecology of the invasive plant to manage it. Roadways are high risk areas that have high incidence of invasive species. Roadways act as conduits for invasive species spread and are ideal harborages for population growth; therefore, roadways should be a primary target for invasive species control. There are four stages in the invasion process which an invasive species must overcome: transport, establishment, spread, and impact. The aim of this dissertation was to focus on these four stages and examine the mechanisms underlying the progression from one stage to the next, while also developing integrated weed management strategies. The target species were Phragmites australis, common reed, and Cisrium arvense, Canada thistle. The transport and establishment risks of P. australis can be reduced by removing rhizome fragments from soil when roadside maintenance is performed. The establishment and spread of C. arvense can be reduced by planting particular resistant species, e.g. Heterotheca villosa, especially those that can reduce light transmittance to the soil. Finally, the spread and impact of C. arvense can be mitigated on roadsides through the use of the herbicide aminopyralid. The risks associated with herbicide drift produced by application equipment can be reduced by using the Wet-Blade herbicide application system.
Resumo:
The purpose of this study was to investigate the knowledge of school teachers about the emergency management of dental trauma, after an educational poster campaign. A total of 1000 questionnaires were sent to 100 schools in the area where the poster had been distributed. This was compared to another 100 schools (1000 questionnaires) in an area, Where the poster had not been distributed. The questionnaire surveyed demographic data, basic knowledge of emergency management of tooth fracture, luxation and avulsion injuries. A total of 511 questionnaires were returned (25.5%) and analyzed. Results showed differences between the two assessed areas. Teachers, who worked in the area with poster distribution, had better knowledge in handling tooth injuries. For the management of tooth fractures the portion of teachers, who knew the correct handling procedure, was 78.9% (area with poster campaign) vs 72.1% (area with no poster campaign), for the management of tooth luxation it was 87% vs 84% and for the management of tooth avulsion it was 71% vs 54%. In the area with the poster campaign 49% (n = 90 out of 185) of the teachers stated to have gained some knowledge about this topic beforehand. Out of these, 75 teachers (75/90 = 83%), had gained their information from the educational poster. Out of the 75 teachers, who had seen a poster on this topic, 68 (68/75 = 91%) would have managed such an emergency correctly. The present study shows the positive effect of educational poster campaigns. It therefore should encourage professionals in this field to embark on similar projects.
Resumo:
Information management and geoinformation systems (GIS) have become indispensable in a large majority of protected areas all over the world. These tools are used for management purposes as well as for research and in recent years have become even more important for visitor information, education and communication. This study is divided into two parts: the first part provides a general overview of GIS and information management in a selected number of national park organizations. The second part lists and evaluates the needs of evolving large protected areas in Switzerland. The results show a wide use of GIS and information management tools in well established protected areas. The more isolated use of singular GIS tools has increasingly been replaced by an integrated geoinformation management. However, interview partners pointed out that human resources for GIS in most parks are limited. The interviews also highlight uneven access to national geodata. The view of integrated geoinformation management is not yet fully developed in the park projects in Switzerland. Short-term needs, such as software and data availability, motivate a large number of responses collected within an exhaustive questionnaire. Nevertheless, the need for coordinated action has been identified and should be followed up. The park organizations in North America show how an effective coordination and cooperation might be organized.