798 resultados para Opportunity costs
Resumo:
Objective Working through a depressive illness can improve mental health but also carries risks and costs from reduced concentration, fatigue, and poor on-the-job performance. However, evidence-based recommendations for managing work attendance decisions, which benefit individuals and employers, are lacking. Therefore, this study has compared the costs and health outcomes of short-term absenteeism versus working while ill (“presenteeism”) amongst employed Australians reporting lifetime major depression. Methods Cohort simulation using state-transition Markov models simulated movement of a hypothetical cohort of workers, reporting lifetime major depression, between health states over one- and five-years according to probabilities derived from a quality epidemiological data source and existing clinical literature. Model outcomes were health service and employment-related costs, and quality-adjusted-life-years (QALYs), captured for absenteeism relative to presenteeism, and stratified by occupation (blue versus white-collar). Results Per employee with depression, absenteeism produced higher mean costs than presenteeism over one- and five-years ($42,573/5-years for absenteeism, $37,791/5-years for presenteeism). However, overlapping confidence intervals rendered differences non-significant. Employment-related costs (lost productive time, job turnover), and antidepressant medication and service use costs of absenteeism and presenteeism were significantly higher for white-collar workers. Health outcomes differed for absenteeism versus presenteeism amongst white-collar workers only. Conclusions Costs and health outcomes for absenteeism and presenteeism were not significantly different; service use costs excepted. Significant variation by occupation type was identified. These findings provide the first occupation-specific cost evidence which can be used by clinicians, employees, and employers to review their management of depression-related work attendance, and may suggest encouraging employees to continue working is warranted.
Resumo:
Assessments of students in primary and secondary education are debated among practitioners, policy-makers, and parents. In some countries, assessment scores serve a criterion for passage between levels of education, for example, from secondary school to post-secondary education. Those practices are often traditions and while they come under criticism, they are a long-accepted part of the educational practices within a country. In those countries, the students’ assessment and examination scores are posted in public places or published in local news media. In other countries, assessments are used for the periodic checks on individual student progress. The results of assessments may be used for rating schools, and in some cases, they are used for evaluating the performance of teachers. Assessments are used less often to analyze student performance and make judgments regarding the performance of the curriculum. Even less often, assessments serve to critically establish strategies for the improvement of student learning and educational practices. The ends on the continuum of the assessment debate often focus on the opportunities that assessments present to improve education on one end. The other end is that assessments serve as a major distraction from the important work of teachers by removing classroom room time from instruction. The debate on those issues continues.
Resumo:
This research provides additional knowledge on the benefits and costs to society, in particular of road transport procured through Public-Private Partnership (PPP) arrangements. Currently, the public sector comparator (PSC) and cost-benefit analysis (CBA) used to evaluate and measure the benefits and costs of PPP are limited in their capacity to predict and forecast long-term events. PPP is attractive to governments due to the non-upfront payment, perceived value for money, and risk allocation and transfer to the private investor. However, public sector remains the guarantor, and under-writer of the private investor's loan from financial institutions and other voluntary risks which are unlimited to future compensatory claims. The new knowledge from this research is the introduction of a framework capable of evaluating, and measuring the associated PPP benefits, as well as the costs, effects, and impacts to society which are protracted and sporadic by nature.
Resumo:
Background: This article describes infection prevention and control professionals’ (ICPs’) staffing levels, patient outcomes, and costs associated with the provision of infection prevention and control services in Australian hospitals. A secondary objective was to determine the priorities for infection control units. Methods: A cross-sectional study design was used. Infection control units in Australian public and private hospitals completed a Web-based anonymous survey. Data collected included details about the respondent; hospital demographics; details and services of the infection control unit; and a description of infection prevention and control-related outputs, patient outcomes, and infection control priorities. Results: Forty-nine surveys were undertaken, accounting for 152 Australian hospitals. The mean number of ICPs was 0.66 per 100 overnight beds (95% confidence interval, 0.55-0.77). Privately funded hospitals have significantly fewer ICPs per 100 overnight beds compared with publicly funded hospitals (P < .01). Staffing costs for nursing staff in infection control units in this study totaled $16,364,392 (mean, $380,566). Infection control units managing smaller hospitals (<270 beds) identified the need for increased access to infectious diseases or microbiology support. Conclusion: This study provides valuable information to support future decisions by funders, hospital administrators, and ICPs on service delivery models for infection prevention and control. Further, it is the first to provide estimates of the resourcing and cost of staffing infection control in hospitals at a national level. Copyright
Resumo:
Purpose of this paper One way in which the tendering process can be further improved is by reviewing and clarifying the high costs that participants face during the course of the tendering phase. The study aims to provide project teams working in construction tender preparation a clear picture of what to expect when tendering for infrastructure projects. Design/methodology/approach Firstly, a review of current literature on tendering in infrastructure projects is conducted to identify the associated costs affecting traditional and PPP procurements as well as the potential measures contributing to tendering cost-reduction. A theoretical framework and its corresponding research hypotheses, which are based on the literature reviewed, are then proposed. An industry-wide questionnaire survey is currently under design to solicit industry practitioners’ views on tendering costs and the associated tendering cost-reduction measures. The data collected in the survey will subject to statistical analysis to test the proposed research hypotheses, which will be reported in a forthcoming paper. Findings and value The direct and indirect costs in public-private procurement have been identified and have been categorised into internal and external costs arising from working on tender submissions. A theoretical framework, mainly composed of five mechanisms of cost reduction, has been proposed and will be tested in a forthcoming industry-wide questionnaire survey. Originality/value of paper The findings are expected to lead to a transparent tendering process in infrastructure procurement, in which there is increased engagement from the private sector as well as an increase in competitive tendering.
Resumo:
This proposal describes the innovative and competitive lunar payload solution developed at the Queensland University of Technology (QUT)–the LunaRoo: a hopping robot designed to exploit the Moon's lower gravity to leap up to 20m above the surface. It is compact enough to fit within a 10cm cube, whilst providing unique observation and mission capabilities by creating imagery during the hop. This first section is deliberately kept short and concise for web submission; additional information can be found in the second chapter.
Resumo:
In Juniper Property Holdings No.15 Pty Ltd v Caltabiano [2015] QSC 95, Jackson J considered what he described as a 'novel point' as to whether the court had jurisdiction to make a determination of the liability of receivers and managers appointed to the plaintiff to pay any costs orders that may be made in favour of the defendant.
Resumo:
In Lessbrook Pty Ltd (in liq) v Whap; Stephen; Bowie; Kepa & Kepa [2014] QCA 63 the Queensland Court of Appeal dealt with significant questions of general application relating to the appointment of assessors to conduct an assessment of costs under the Uniform Civil Procedure Rules 1999 (Qld) (UCPR).
Resumo:
The direct and indirect health effects of increasingly warmer temperatures are likely to further burden the already overcrowded hospital emergency departments (EDs). Using current trends and estimates in conjunction with future population growth and climate change scenarios, we show that the increased number of hot days in the future can have a considerable impact on EDs, adding to their workload and costs. The excess number of visits in 2030 is projected to range between 98–336 and 42–127 for younger and older groups, respectively. The excess costs in 2012–13 prices are estimated to range between AU$51,000–184,000 (0–64) and AU$27,000–84,000 (65+). By 2060, these estimates will increase to 229–2300 and 145–1188 at a cost of between AU$120,000–1,200,000 and AU$96,000–786,000 for the respective age groups. Improvements in climate change mitigation and adaptation measures are likely to generate synergistic health co-benefits and reduce the impact on frontline health services.
Resumo:
A central dimension of the State’s responsibility in a liberal democracy and any just society is the protection of individuals’ central rights and freedoms, and the creation of the minimum conditions under which each individual has an opportunity to lead a life of sufficient equality, dignity and value. A special subset of this responsibility is to protect those who are unable to protect themselves from genuine harm. Substantial numbers of children suffer serious physical, emotional and sexual abuse, and neglect at the hands of their parents and caregivers or by other known parties. Child abuse and neglect occurs in a situation of extreme power asymmetry. The physical, social, behavioural and economic costs to the individual, and the social and economic costs to communities, are vast. Children are not generally able to protect themselves from serious abuse and neglect. This enlivens both the State’s responsibility to protect the child, and the debate about how that responsibility can and should be discharged. A core question arises for all societies, given that most serious child maltreatment occurs in the family sphere, is unlikely to be disclosed, causes substantial harm to both individual and community, and infringes fundamental individual rights and freedoms. The question is: how can society identify these situations so that the maltreatment can be interrupted, the child’s needs for security and safety, and health and other rehabilitation can be met, and the family’s needs can be addressed to reduce the likelihood of recurrence? This chapter proposes a theoretical framework applicable for any society that is considering justifiable and effective policy approaches to identify and respond to cases of serious child abuse and neglect. The core of the theoretical framework is based on major principles from both classical liberal political philosophy (Locke and Mill), and leading political philosophers from the twentieth century and the first part of the new millennium (Rawls, Rorty, Okin, Nussbaum), and is further situated within fundamental frameworks of civil and criminal law, and health and economics.
Resumo:
This lecture addresses the contribution of research by insolvency specialists to the development of insolvency law and practice, in particular to the (re-)design of insolvency systems. It draws on examples from Australia of government enquiries to reform insolvency law as well as other areas of law with which it intersects. It comments on the role that insolvency specialists can play in such policy debates – not only insolvency academics but also scholarly practitioners – for the public good.
Resumo:
Purpose: This chapter discusses the opportunity of Islamic project financing implementation for public infrastructure development in Indonesia. Design/Methodology/Approach: This chapter, firstly, reviewed existing literature on Islamic finance to explore the applicability of Islamic financing in infrastructure development. Interviews were conducted as the first stage of Delphi method approach. This was then followed by reviewing Indonesia’s government policies and regulations in infrastructure industry and Islamic financing. Findings: This chapter enlightens the implementation of Islamic financing on infrastructure project financing in Indonesia. The findings indicate that the government policies and regulations on both infrastructure investment and Islamic financing support the implementation of Islamic project financing, whereas, an improvement is still needed in order to overarch infrastructure business and Islamic financing investment. Research: Financing framework development for Indonesia infrastructure projects. Limitations/Implications: The result reported comprises the preliminary study of Islamic project paper written based on published research papers and interviews. Furthermore, the data collected for the study are limited to the case of Indonesian infrastructure projects. Practical Implication: Islamic financing in Indonesia infrastructure projects development has not been optimally implemented. Therefore, this chapter serves as a catalyst to explore alternative financial scheme such as Islamic financing for infrastructure development. Originality/Value: This chapter highlights possibilities and obstacles in applying Islamic scheme to infrastructure project financing. This provides a framework to analyse the steps to implement Islamic financing successfully in infrastructure development.
Resumo:
As design research continues to gain momentum in South America, design researchers and practitioners in the region have begun to consider how to the field may address regionally-specific issues, including on-going political struggles. By bringing approaches such as Participatory Design and Adversarial Design that consider political aspects of design, local researchers have explored various forms that these two approaches could take that are tailored to the needs and values of different communities across the region. This paper focuses on identifying opportunities for developing design research projects in community-based and grassroots-oriented contexts. The paper presents the findings of our study about the understanding and experience of design researchers and experts who have been working closely with community groups and grassroots organisations in South America. Five themes emerged, highlighting opportunities and challenges related to positioning contemporary design research in the region, integration of adversarial perspectives into design processes, leveraging local obstacles through creativity, and the potential of building capacity within community groups and grassroots organisations for sustainability and autonomy.
Resumo:
The window of opportunity is a concept critical to rheumatoid arthritis treatment. Early treatment changes the outcome of rheumatoid arthritis treatment, in that response rates are higher with earlier disease-modifying anti-rheumatic drug treatment and damage is substantially reduced. Axial spondyloarthritis is an inflammatory axial disease encompassing both nonradiographic axial spondyloarthritis and established ankylosing spondylitis. In axial spondyloarthritis, studies of magnetic resonance imaging as well as tumor necrosis factor inhibitor treatment and withdrawal studies all suggest that early effective suppression of inflammation has the potential to reduce radiographic damage. This potential would suggest that the concept of a window of opportunity is relevant not only to rheumatoid arthritis but also to axial spondyloarthritis. The challenge now remains to identify high-risk patients early and to commence treatment without delay. Developments in risk stratification include new classification criteria, identification of clinical risk factors, biomarkers, genetic associations, potential antibody associations and an ankylosing spondylitis-specific microbiome signature. Further research needs to focus on the evidence for early intervention and the early identification of high-risk individuals.
Resumo:
Digital technology offers enormous benefits (economic, quality of design and efficiency in use) if adopted to implement integrated ways of representing the physical world in a digital form. When applied across the full extent of the built and natural world, it is referred to as the Digital Built Environment (DBE) and encompasses a wide range of approaches and technology initiatives, all aimed at the same end goal: the development of a virtual world that sufficiently mirrors the real world to form the basis for the smart cities of the present and future, enable efficient infrastructure design and programmed maintenance, and create a new foundation for economic growth and social well-being through evidence-based analysis. The creation of a National Data Policy for the DBE will facilitate the creation of additional high technology industries in Australia; provide Governments, industries and citizens with greater knowledge of the environments they occupy and plan; and offer citizen-driven innovations for the future. Australia has slipped behind other nations in the adoption and execution of Building Information Modelling (BIM) and the principal concern is that the gap is widening. Data driven innovation added $67 billion to the Australian economy in 20131. Strong open data policy equates to $16 billion in new value2. Australian Government initiatives such as the Digital Earth inspired “National Map” offer a platform and pathway to embrace the concept of a “BIM Globe”, while also leveraging unprecedented growth in open source / open data collaboration. Australia must address the challenges by learning from international experiences—most notably the UK and NZ—and mandate the use of BIM across Government, extending the Framework for Spatial Data Foundation to include the Built Environment as a theme and engaging collaboration through a “BIM globe” metaphor. This proposed DBE strategy will modernise the Australian urban planning and the construction industry. It will change the way we develop our cities by fundamentally altering the dynamics and behaviours of the supply chains and unlocking new and more efficient ways of collaborating at all stages of the project life-cycle. There are currently two major modelling approaches that contribute to the challenge of delivering the DBE. Though these collectively encompass many (often competing) approaches or proprietary software systems, all can be categorised as either: a spatial modelling approach, where the focus is generally on representing the elements that make up the world within their geographic context; and a construction modelling approach, where the focus is on models that support the life cycle management of the built environment. These two approaches have tended to evolve independently, addressing two broad industry sectors: the one concerned with understanding and managing global and regional aspects of the world that we inhabit, including disciplines concerned with climate, earth sciences, land ownership, urban and regional planning and infrastructure management; the other is concerned with planning, design, construction and operation of built facilities and includes architectural and engineering design, product manufacturing, construction, facility management and related disciplines (a process/technology commonly known as Building Information Modelling, BIM). The spatial industries have a strong voice in the development of public policy in Australia, while the construction sector, which in 2014 accounted for around 8.5% of Australia’s GDP3, has no single voice and because of its diversity, is struggling to adapt to and take advantage of the opportunity presented by these digital technologies. The experience in the UK over the past few years has demonstrated that government leadership is very effective in stimulating industry adoption of digital technologies by, on the one hand, mandating the use of BIM on public procurement projects while at the same time, providing comparatively modest funding to address the common issues that confront the industry in adopting that way of working across the supply chain. The reported result has been savings of £840m in construction costs in 2013/14 according to UK Cabinet Office figures4. There is worldwide recognition of the value of bringing these two modelling technologies together. Australia has the expertise to exercise leadership in this work, but it requires a commitment by government to recognise the importance of BIM as a companion methodology to the spatial technologies so that these two disciplinary domains can cooperate in the development of data policies and information exchange standards to smooth out common workflows. buildingSMART Australasia, SIBA and their academic partners have initiated this dialogue in Australia and wish to work collaboratively, with government support and leadership, to explore the opportunities open to us as we develop an Australasian Digital Built Environment. As part of that programme, we must develop and implement a strategy to accelerate the adoption of BIM processes across the Australian construction sector while at the same time, developing an integrated approach in concert with the spatial sector that will position Australia at the forefront of international best practice in this area. Australia and New Zealand cannot afford to be on the back foot as we face the challenges of rapid urbanisation and change in the global environment. Although we can identify some exemplary initiatives in this area, particularly in New Zealand in response to the need for more resilient urban development in the face of earthquake threats, there is still much that needs to be done. We are well situated in the Asian region to take a lead in this challenge, but we are at imminent risk of losing the initiative if we do not take action now. Strategic collaboration between Governments, Industry and Academia will create new jobs and wealth, with the potential, for example, to save around 20% on the delivery costs of new built assets, based on recent UK estimates.