747 resultados para Infrastructure Projects
Resumo:
Large projects evaluation rises well known difficulties because -by definition- they modify the current price system; their public evaluation presents additional difficulties because they modify too existing shadow prices without the project. This paper analyzes -first- the basic methodologies applied until late 80s., based on the integration of projects in optimization models or, alternatively, based on iterative procedures with information exchange between two organizational levels. New methodologies applied afterwards are based on variational inequalities, bilevel programming and linear or nonlinear complementarity. Their foundations and different applications related with project evaluation are explored. As a matter of fact, these new tools are closely related among them and can treat more complex cases involving -for example- the reaction of agents to policies or the existence of multiple agents in an environment characterized by common functions representing demands or constraints on polluting emissions.
Resumo:
El proyecto nace de la necesidad de implementar una herramienta de gestión a medida para la empresa Sonicon Systems S.L., dado que la herramienta actual no se adapta completamente a los requerimientos y, en algunos casos, es compleja o dispone de demasiada información.
Resumo:
Theoretical and empirical approaches have stressed the existence of financial constraints in innovative activities of firms. This paper analyses the role of financial obstacles on the likelihood of abandoning an innovation project. Although a large number of innovation projects are abandoned before their completion, the empirical evidence has focused on the determinants of innovation while failed projects have received little attention. Our analysis differentiates between internal and external barriers on the probability of abandoning a project and we examine whether the effects are different depending on the stage of the innovation process. In the empirical analysis carried out for a panel data of potential innovative Spanish firms for the period 2004-2010, we use a bivariate probit model to take into account the simultaneity of financial constraints and the decision to abandon an innovation project. Our results show that financial constraints most affect the probability of abandoning an innovation project during the concept stage and that low-technological manufacturing and non-KIS service sectors are more sensitive to financial constraints.
Resumo:
Advances in neuroscience research over the last few decades have increased our understanding of how individual neurons acquire their specific properties and assemble into complex circuits, and how these circuits are affected in disease. One of the important motives driving neuroscience research is the development of new scientific techniques and interdisciplinary cooperation. Compared to developed countries, many countries on the African continent are confronted with poor facilities, lack of funding or career development programs for neuroscientists, all of which deter young scientists from taking up neuroscience as a career choice. This article highlights some steps that are being taken to promote neuroscience education and research in Africa.
Resumo:
Theoretical and empirical approaches have stressed the existence of financial constraints in innovative activities of firms. This paper analyses the role of financial obstacles on the likelihood of abandoning an innovation project. Although a large number of innovation projects are abandoned before their completion, the empirical evidence has focused on the determinants of innovation while failed projects have received little attention. Our analysis differentiates between internal and external barriers on the probability of abandoning a project and we examine whether the effects are different depending on the stage of the innovation process. In the empirical analysis carried out for a panel data of potential innovative Spanish firms for the period 2004-2010, we use a bivariate probit model to take into account the simultaneity of financial constraints and the decision to abandon an innovation project. Our results show that financial constraints most affect the probability of abandoning an innovation project during the concept stage and that low-technological manufacturing and non-KIS service sectors are more sensitive to financial constraints. Keywords: barriers to innovation, failure of innovation projects, financial constraints JEL Classifications: O31, D21
Resumo:
Coffee and cocoa represent the main sources of income for small farmers in the Northern Amazon Region of Ecuador. The provinces of Orellana and Sucumbios, as border areas, have benefited from investments made by many public and private institutions. Many of the projects carried out in the area have been aimed at energising the production of coffee and cocoa, strengthening the producers’ associations and providing commercialisation infrastructure. Improving the quality of life of this population threatened by poverty and high migration flows mainly from Colombia is a significant challenge. This paper presents research highlighting the importance of associative commercialisation to raising income from coffee and cocoa. The research draws on primary information obtained during field work, and from official information from the Ministry of Agriculture. The study presents an overview of current organisational structures, initiatives of associative commercialisation, stockpiling of infrastructure and ownership regimes, as well as estimates for both ‘robusta’ coffee and national cocoa production and income. The analysis of the main constraints presents different alternatives for the implementation of public land policies. These policies are aimed at mitigating the problems associated with the organisational structure of the producers, with processes of commercialisation and with environmental aspects, among others.
Resumo:
This paper describes a pilot study centred on the technology-enhanced self-development of competences in lifelong learning education carried out in the challenging context of the Association of Participants Àgora. The pilot study shows that the use of the TENCompetence infrastructure, i.e. in this case the Personal Development Planner tool, provides various kinds of benefits for adult participants with low educational profiles and who are traditionally excluded from the use of innovative learning technologies and the knowledge society. The selforganized training supported by the PDP tool aims at allowing the learners to create and control their own learning plans based on their interests and educational background including informal and non-formal experiences. In this sense, the pilot participants had the opportunity to develop and improve their competences in English language (basic and advanced levels) and ICT competence profiles which are mostly related to functional and communicative skills. Besides, the use of the PDP functionalities, such as the self-assessment, the planning and the self-regulating elements allowed the participants to develop reflective skills. Pilot results also provide indications for future developments in the field of technology support for self-organized learners. The paper introduces the context and the pilot scenario, indicates the evaluation methodology applied and discusses the most significant findings derived from the pilot study.
Resumo:
This paper describes an experiment to explore the effects of the TENCompetence infrastructure for supporting lifelong competence development which is now in development. This infrastructure provides structured, multi-leveled access to learning materials, based upon competences. People can follow their own learning path, supported by a listing of competences and their components, by competence development plans attached to competences and by the possibility to mark elements as complete. We expected the PCM to have an effect on (1) control of participants of their own learning, and (2) appreciation of their learning route, (3) of the learning resources, (4) of their competence development, and (5) of the possibilities of collaboration. In the experiment, 44 Bulgarian teachers followed a distance learning course on a specific teaching methodology for six weeks. Part of them used the TENCompetence infrastructure, part used an infrastructure which was similar, except for the characterizing elements mentioned above. The results showed that in the experimental condition, more people passed the final competence assess-ment, and people felt more in control of their own learning. No differences between the two groups were found on the amount and appreciation of collaboration and on further measures of competence development.
Resumo:
The increasing volume of data describing humandisease processes and the growing complexity of understanding, managing, and sharing such data presents a huge challenge for clinicians and medical researchers. This paper presents the@neurIST system, which provides an infrastructure for biomedical research while aiding clinical care, by bringing together heterogeneous data and complex processing and computing services. Although @neurIST targets the investigation and treatment of cerebral aneurysms, the system’s architecture is generic enough that it could be adapted to the treatment of other diseases.Innovations in @neurIST include confining the patient data pertaining to aneurysms inside a single environment that offers cliniciansthe tools to analyze and interpret patient data and make use of knowledge-based guidance in planning their treatment. Medicalresearchers gain access to a critical mass of aneurysm related data due to the system’s ability to federate distributed informationsources. A semantically mediated grid infrastructure ensures that both clinicians and researchers are able to seamlessly access andwork on data that is distributed across multiple sites in a secure way in addition to providing computing resources on demand forperforming computationally intensive simulations for treatment planning and research.
Resumo:
The choice of a research path in attacking scientific and technological problems is a significant component of firms’ R&D strategy. One of the findings of the patent races literature is that, in a competitive market setting, firms’ noncooperative choices of research projects display an excessive degree of correlation, as compared to the socially optimal level. The paper revisits this question in a context in which firms have access to trade secrets, in addition to patents, to assert intellectual property rights (IPR) over their discoveries. We find that the availability of multiple IPR protection instruments can move the paths chosen by firms engaged in an R&D race toward the social optimum.
Resumo:
This final year project presents the design principles and prototype implementation of BIMS (Biomedical Information Management System), a flexible software system which provides an infrastructure to manage all information required by biomedical research projects.The BIMS project was initiated with the motivation to solve several limitations in medical data acquisition of some research projects, in which Universitat Pompeu Fabra takes part. These limitations,based on the lack of control mechanisms to constraint information submitted by clinicians, impact on the data quality, decreasing it.BIMS can easily be adapted to manage information of a wide variety of clinical studies, not being limited to a given clinical specialty. The software can manage both, textual information, like clinical data (measurements, demographics, diagnostics, etc ...), as well as several kinds of medical images (magnetic resonance imaging, computed tomography, etc ...). Moreover, BIMS provides a web - based graphical user interface and is designed to be deployed in a distributed andmultiuser environment. It is built on top of open source software products and frameworks.Specifically, BIMS has been used to represent all clinical data being currently used within the CardioLab platform (an ongoing project managed by Universitat Pompeu Fabra), demonstratingthat it is a solid software system, which could fulfill requirements of a real production environment.
Resumo:
This report is of the projects for the capital.
Resumo:
Traffic volume increases and an aging infrastructure create the need for reconstruction, rehabilitation, and maintenance of existing facilities. As more motorists feel that delays should be minimal during highway renewal projects, lane closures that reduce capacity through the work zone should not create unreasonable delays. In order to facilitate the determination of when a lane closure is permitted during the day, some state transportation agencies (STAs) have developed lane closure policies, or strategies, that they use as guidance in determining daily permitted lane closure times. Permitted lane closure times define what times of the day, week, or season a lane closure is allowed on a facility and at a specific location or segment. This research addresses the lane closure policies of several STAs that were reputed to have good lane closures policies or strategies and that were selected by the project advisory committee for further research.
Resumo:
Audit report on Highway Safety Projects administered by The Integer Group Midwest for the year ended September 30, 2006