277 resultados para Dredging spoil


Relevância:

10.00% 10.00%

Publicador:

Resumo:

In October 1980 the U.S. Army Corps of Engineers conducted a beach nourishment project at the Lexington (Michigan) Harbor on the southwest shore of Lake Huron, a project designed to mitigate beach erosion attributable to the installation of the harbor. In response to a request from the Coastal Engineering Research Center (CERC), the U.S. Fish and Wildlife Service's Great Lakes Fishery Laboratory conducted a Corps-funded study from June 1980 to October 1981 along a 8.4-kilometer segment of shoreline adjacent to the harbor to determine the effect of the Corps' beach nourishment project on the nearshore aquatic environment. The study performed by the service included aerial photographic surveys of the study area; measurement of dissolved oxygen, turbidity, and suspended particulate matter levels; and collection of lake bottom sediments, macrozoobenthos and fish. Analysis of the aerial photographs showed that the beach face profile changed markedly during the study as a result of beach nourishment. Dredging of about 19,000 cubic meters of beach sediment from an accretion area adjacent to the harbor's north breakwater caused the beach face to recede, while deposition of this sediment on a feeder beach south of the harbor caused the beach face there to extend lakeward.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

"September 1993."

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

"U.S. Bureau of Mines contracts J0166054 and J0166055."

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Prepared for Illinois Dept. of Energy and Natural Resources, Energy and Environmental Affairs Division.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The potentially responsible parties (PRPs) have removed the beaver dams and have collected the sediment samples they need for treatability studies. The treatability studies will establish the correct silt fence to minimize releases of sediment during the actual dredging to occur this fall. The studies will also determine the types and amounts of materials (lime, kiln dust, fly ash, etc.) required to stabilize the sediment, chemically tie up the metals and insure the sediment mixture will bear the weight of the cap on the Interim Storage Cell where the sediment will be placed. The Illinois Environmental Protection Agency (Illinois EPA) anticipates work to be completed by late fall or early winter 2004, if lake and river levels that affect the South Ditch are at their normal seasonal levels.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Description based on: Vol. 16, no. 1 (Jan. 1912).

Relevância:

10.00% 10.00%

Publicador:

Resumo:

New surveys were completed and data from the field sheets were kindly furnished by the U. S. Coast and Geodetic Survey to the Woods Hole Oceanographic Institution for use in dredging and coring operations. This field work, first reported in 1936, was continued from time to time until 1941 as new soundings became available. Rock dredging and coring has been carried out in every major canyon on the slope from Corsair Canyon at the tip of Georges Bank to Norfolk Canyon off the entrance to the Chesapeake. Numerous cores have also been taken from the areas in between; and while the whole slope from Georges to the Chesapeake has not been covered, it is believed that no significant areas have been missed. In the following report the tows and cores will be described by areas from Georges Bank southwards, as the same region was revisited in successive years. The various samples, however, will be referred to by number followed by the year in which they were taken. The material is in storage in the Woods Hole Oceanographic Institution and in the Museum of Comparative Zoology at Harvard University.