887 resultados para Distribution network reconfiguration problem


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The development in power systems and the introduction of decentralized generation and Electric Vehicles (EVs), both connected to distribution networks, represents a major challenge in the planning and operation issues. This new paradigm requires a new energy resources management approach which considers not only the generation, but also the management of loads through demand response programs, energy storage units, EVs and other players in a liberalized electricity markets environment. This paper proposes a methodology to be used by Virtual Power Players (VPPs), concerning the energy resource scheduling in smart grids, considering day-ahead, hour-ahead and real-time scheduling. The case study considers a 33-bus distribution network with high penetration of distributed energy resources. The wind generation profile is based on a real Portuguese wind farm. Four scenarios are presented taking into account 0, 1, 2 and 5 periods (hours or minutes) ahead of the scheduling period in the hour-ahead and realtime scheduling.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Energy resource scheduling is becoming increasingly important, as the use of distributed resources is intensified and of massive electric vehicle is envisaged. The present paper proposes a methodology for day-ahead energy resource scheduling for smart grids considering the intensive use of distributed generation and Vehicle-to-Grid (V2G). This method considers that the energy resources are managed by a Virtual Power Player (VPP) which established contracts with their owners. It takes into account these contracts, the users' requirements subjected to the VPP, and several discharge price steps. The full AC power flow calculation included in the model takes into account network constraints. The influence of the successive day requirements on the day-ahead optimal solution is discussed and considered in the proposed model. A case study with a 33-bus distribution network and V2G is used to illustrate the good performance of the proposed method.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The operation of distribution networks has been facing changes with the implementation of smart grids and microgrids, and the increasing use of distributed generation. The specific case of distribution networks that accommodate residential buildings, small commerce, and distributed generation as the case of storage and PV generation lead to the concept of microgrids, in the cases that the network is able to operate in islanding mode. The microgrid operator in this context is able to manage the consumption and generation resources, also including demand response programs, obtaining profits from selling electricity to the main network. The present paper proposes a methodology for the energy resource scheduling considering power flow issues and the energy buying and selling from/to the main network in each bus of the microgrid. The case study uses a real distribution network with 25 bus, residential and commercial consumers, PV generation, and storage.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A sustentabilidade do sistema energético é crucial para o desenvolvimento económico e social das sociedades presentes e futuras. Para garantir o bom funcionamento dos sistemas de energia actua-se, tipicamente, sobre a produção e sobre as redes de transporte e de distribuição. No entanto, a integração crescente de produção distribuída, principalmente nas redes de distribuição de média e de baixa tensão, a liberalização dos mercados energéticos, o desenvolvimento de mecanismos de armazenamento de energia, o desenvolvimento de sistemas automatizados de controlo de cargas e os avanços tecnológicos das infra-estruturas de comunicação impõem o desenvolvimento de novos métodos de gestão e controlo dos sistemas de energia. O contributo deste trabalho é o desenvolvimento de uma metodologia de gestão de recursos energéticos num contexto de SmartGrids, considerando uma entidade designada por VPP que gere um conjunto de instalações (unidades produtoras, consumidores e unidades de armazenamento) e, em alguns casos, tem ao seu cuidado a gestão de uma parte da rede eléctrica. Os métodos desenvolvidos contemplam a penetração intensiva de produção distribuída, o aparecimento de programas de Demand Response e o desenvolvimento de novos sistemas de armazenamento. São ainda propostos níveis de controlo e de tomada de decisão hierarquizados e geridos por entidades que actuem num ambiente de cooperação mas também de concorrência entre si. A metodologia proposta foi desenvolvida recorrendo a técnicas determinísticas, nomeadamente, à programação não linear inteira mista, tendo sido consideradas três funções objectivo distintas (custos mínimos, emissões mínimas e cortes de carga mínimos), originando, posteriormente, uma função objectivo global, o que permitiu determinar os óptimos de Pareto. São ainda determinados os valores dos custos marginais locais em cada barramento e consideradas as incertezas dos dados de entrada, nomeadamente, produção e consumo. Assim, o VPP tem ao seu dispor um conjunto de soluções que lhe permitirão tomar decisões mais fundamentadas e de acordo com o seu perfil de actuação. São apresentados dois casos de estudo. O primeiro utiliza uma rede de distribuição de 32 barramentos publicada por Baran & Wu. O segundo caso de estudo utiliza uma rede de distribuição de 114 barramentos adaptada da rede de 123 barramentos do IEEE.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A turvação é uma das principais preocupações das empresas de rede de distribuição de água potável. Para se saber a sua origem existem diversos mecanismos, sugeridos em bibliografia, que explicam a formação de depósitos de partículas nas tubagens, que se acumulam em camadas sobrepostas, criando entre si forças de coesão. A turvação pode surgir se o caudal ou a velocidade na tubagem aumentar, por alguma razão, pois um aumento da tensão de corte sobre o depósito, pode superar as forças de coesão levando à sua ressuspensão. Esta explicação é traduzida matematicamente pelo modelo PODDS (Prediction of Discolouration in Drinking Water Distribtuion System). O modelo PODDS foi compilado em EPANET recentemente por uma equipa de investigadores da Universidade de Sheffield e foi utilizado para fazer o estudo num ramal da empresa AdDP - Águas do Douro e Paiva, SA. Os resultados das simulações permitirão prever o caudal mínimo teórico a utilizar no ramal que origina o valor limite de turvação. Foram realizados ensaios de variação do caudal no ramal de Jovim-Ramalde para a calibração do modelo. Os parâmetros obtidos foram: Cmáx igual a 100 NTUm, b e n igual a 1, k é igual -1 NTUm3/N, e por fim, P igual a 0,0001 NTUm3/N.s. Após calibração do modelo realizaram-se simulações com atualização das forças de coesão para conhecer o caudal que provocaria a mobilização das partículas até uma turvação de 4 NTU e concluiu-se que o valor seria de 4,32 m3/s. O tempo necessário para regressar a valores inferiores a 1 NTU também foi determinado e 4 horas e 8 minutos foi o valor alcançado. Por fim realizou-se um estudo da influência da temperatura neste modelo e o resultado mostrou que este parâmetro é pouco influente para a gama de temperaturas considerada.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

All over the world, the liberalization of electricity markets, which follows different paradigms, has created new challenges for those involved in this sector. In order to respond to these challenges, electric power systems suffered a significant restructuring in its mode of operation and planning. This restructuring resulted in a considerable increase of the electric sector competitiveness. Particularly, the Ancillary Services (AS) market has been target of constant renovations in its operation mode as it is a targeted market for the trading of services, which have as main objective to ensure the operation of electric power systems with appropriate levels of stability, safety, quality, equity and competitiveness. In this way, with the increasing penetration of distributed energy resources including distributed generation, demand response, storage units and electric vehicles, it is essential to develop new smarter and hierarchical methods of operation of electric power systems. As these resources are mostly connected to the distribution network, it is important to consider the introduction of this kind of resources in AS delivery in order to achieve greater reliability and cost efficiency of electrical power systems operation. The main contribution of this work is the design and development of mechanisms and methodologies of AS market and for energy and AS joint market, considering different management entities of transmission and distribution networks. Several models developed in this work consider the most common AS in the liberalized market environment: Regulation Down; Regulation Up; Spinning Reserve and Non-Spinning Reserve. The presented models consider different rules and ways of operation, such as the division of market by network areas, which allows the congestion management of interconnections between areas; or the ancillary service cascading process, which allows the replacement of AS of superior quality by lower quality of AS, ensuring a better economic performance of the market. A major contribution of this work is the development an innovative methodology of market clearing process to be used in the energy and AS joint market, able to ensure viable and feasible solutions in markets, where there are technical constraints in the transmission network involving its division into areas or regions. The proposed method is based on the determination of Bialek topological factors and considers the contribution of the dispatch for all services of increase of generation (energy, Regulation Up, Spinning and Non-Spinning reserves) in network congestion. The use of Bialek factors in each iteration of the proposed methodology allows limiting the bids in the market while ensuring that the solution is feasible in any context of system operation. Another important contribution of this work is the model of the contribution of distributed energy resources in the ancillary services. In this way, a Virtual Power Player (VPP) is considered in order to aggregate, manage and interact with distributed energy resources. The VPP manages all the agents aggregated, being able to supply AS to the system operator, with the main purpose of participation in electricity market. In order to ensure their participation in the AS, the VPP should have a set of contracts with the agents that include a set of diversified and adapted rules to each kind of distributed resource. All methodologies developed and implemented in this work have been integrated into the MASCEM simulator, which is a simulator based on a multi-agent system that allows to study complex operation of electricity markets. In this way, the developed methodologies allow the simulator to cover more operation contexts of the present and future of the electricity market. In this way, this dissertation offers a huge contribution to the AS market simulation, based on models and mechanisms currently used in several real markets, as well as the introduction of innovative methodologies of market clearing process on the energy and AS joint market. This dissertation presents five case studies; each one consists of multiple scenarios. The first case study illustrates the application of AS market simulation considering several bids of market players. The energy and ancillary services joint market simulation is exposed in the second case study. In the third case study it is developed a comparison between the simulation of the joint market methodology, in which the player bids to the ancillary services is considered by network areas and a reference methodology. The fourth case study presents the simulation of joint market methodology based on Bialek topological distribution factors applied to transmission network with 7 buses managed by a TSO. The last case study presents a joint market model simulation which considers the aggregation of small players to a VPP, as well as complex contracts related to these entities. The case study comprises a distribution network with 33 buses managed by VPP, which comprises several kinds of distributed resources, such as photovoltaic, CHP, fuel cells, wind turbines, biomass, small hydro, municipal solid waste, demand response, and storage units.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Nos tempos atuais as empresas que atuam no ramo dos sistemas elétricos de energias enfrentam desafios cada vez mais exigentes, dado o enquadramento normativo a que estão sujeitas por parte da entidade reguladora dos serviços energéticos. No caso do Arquipélago dos Açores, o normativo relativo ao regulamento da qualidade de serviço entrou em vigor em 2006, trazendo à EDA,S.A. (Eletricidade dos Açores), entidade responsável pelo transporte e distribuição de energia na região, novas exigências para adequados níveis de eficiência e de garantias aos clientes, no que respeita à qualidade de serviço que lhes é prestado. No âmbito deste trabalho, é efetuado o estudo do trânsito de potência sobre a rede distribuição 15 kV da ilha Graciosa. Para tal, é realizada a modelização da rede no software de rede elétricas porwerworld 8.0. e são idealizados um conjunto de cenários de exploração da rede, que visam simular situações reais que ocorrem na exploração diária da rede de distribuição da ilha. Nas simulações a efetuar consideram-se dois cenários com perfil de carga distintos, um referente à ponta máxima, e outro referente ao vazio mínimo, verificados no ano de 2014. Quanto ao modo de exploração da rede nos cenários a simular, é contemplado o modo de exploração normalmente operado pela empresa gestora, bem como diversas reconfigurações sobre o modo de exploração normalmente operado, realizadas através da abertura e fecho dos aparelhos de corte constituintes da rede. Em todos os cenários simulados, é realizado um estudo relativamente à potência de perdas do sistema, ao perfil da tensão nos diversos postos de transformação, e ao congestionamento de energia verificado nas linhas de distribuição da rede.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Smart Grids (SGs) have emerged as the new paradigm for power system operation and management, being designed to include large amounts of distributed energy resources. This new paradigm requires new Energy Resource Management (ERM) methodologies considering different operation strategies and the existence of new management players such as several types of aggregators. This paper proposes a methodology to facilitate the coalition between distributed generation units originating Virtual Power Players (VPP) considering a game theory approach. The proposed approach consists in the analysis of the classifications that were attributed by each VPP to the distributed generation units, as well as in the analysis of the previous established contracts by each player. The proposed classification model is based in fourteen parameters including technical, economical and behavioural ones. Depending of the VPP strategies, size and goals, each parameter has different importance. VPP can also manage other type of energy resources, like storage units, electric vehicles, demand response programs or even parts of the MV and LV distribution network. A case study with twelve VPPs with different characteristics and one hundred and fifty real distributed generation units is included in the paper.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A solFORM é uma empresa de Consultoria e Formação Profissional nas áreas da Energia e Eletricidade, Higiene e Segurança no Trabalho e Comportamental. O seu foco de atuação é a oferta de formação profissional especializada a empresas que trabalham na rede de distribuição de energia elétrica. O diagnóstico realizado permitiu identificar como potencialidade de intervenção os serviços de recursos humanos prestados pela empresa, mais especificamente conceber uma metodologia de avaliação de competências e de identificação de necessidades de desenvolvimento para os técnicos do setor elétrico. A aplicação deste projeto permite adequar as competências dos colaboradores dos clientes da solFORM, empresas do setor elétrico, aos perfis profissionais exigidos pela agência reguladora da formação do setor, a AQTSE - Associação para a Qualificação Técnica do Setor Energético. Assim, o objetivo final será que a solFORM possa propor planos de desenvolvimento adequados às necessidades específicas dos colaboradores das suas empresas clientes. Depois de definido o planeamento estratégico e operacional da nova metodologia foi implementada num grupo piloto. Ao longo da implementação e no final foram avaliados os indicadores que demonstram o cumprimento dos objetivos estabelecidos, assim como a finalidade do projeto.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A presente dissertação insere-se no âmbito da unidade curricular “ Dissertação” do 2º ano do mestrado em Engenharia Eletrotécnica – Sistemas Elétricos de Energia. Com o aumento crescente do número de consumidores de energia, é cada vez mais imperioso a adoção de medidas de racionalização e gestão dos consumos da energia elétrica. Existem diferentes tipos de dificuldades no planeamento e implementação de novas centrais produtoras de energia renovável, pelo que também por este motivo é cada vez mais importante adoção de medidas de gestão de consumos, quer ao nível dos clientes alimentados em média tensão como de baixa tensão. Desta forma será mais acessível a criação de padrões de eficiência energética elevados em toda a rede de distribuição de energia elétrica. Também a economia é afetada por uma fraca gestão dos consumos por parte dos clientes. Elevados desperdícios energéticos levam a que mais energia tenha que ser produzida, energia essa que contribui ainda mais para a elevada taxa de dependência energética em Portugal, e para o degradar da economia nacional. Coloca-se assim a necessidade de implementar planos e métodos que promovam a eficiência energética e a gestão racional de consumos de energia elétrica. Apresenta-se nesta dissertação várias propostas, algumas na forma de projetos já em execução, que visam sensibilizar o consumidor para a importância da utilização eficiente de energia e, ao mesmo tempo, disponibilizam as ferramentas tecnológicas adequadas para auxiliar a implementação dos métodos propostos. Embora os planos apresentados, sobejamente conhecidos, tenham imensa importância, a implementação nos vários consumidores de sistemas capazes de efetivamente reduzir consumos tem um papel fundamental. Equipamentos de gestão de consumos, que são apresentados nesta dissertação, permitem ao consumidor aceder diretamente ao seu consumo. Podem aceder não apenas ao consumo global da instalação mas também ao consumo específico por equipamento, permitindo perceber onde se verifica a situação mais desfavorável. Funcionalidades de programação de perfis tipo, com limitações de potência em vários períodos horários, bem como possibilidades de controlo remoto com recurso a aplicações para Smartphones permitem a redução de consumos ao nível da rede de distribuição e, desta forma, contribuir para a redução dos desperdícios e da dependência energética em Portugal. No âmbito do trabalho de dissertação é desenvolvida uma metodologia de comercialização de potência, que é apresentada nesta tese. Esta metodologia propõem que o consumidor, em função dos seus consumos, pague apenas a quantidade de potência que efetivamente necessita num certo período de tempo. Assim, o consumidor deixa de pagar uma tarifa mensal fixa associada á sua potência contratada, e passará a pagar um valor correspondente apenas à potência que efetivamente solicitou em todas as horas durante o mês. Nesta metodologia que é apresentada, o consumidor poderá também fazer uma análise do seu diagrama de cargas e simular uma alteração da sua tarifa, tarifa esta que varia entre tarifa simples, bi-horária semanal, bi-horária diária, tri-horária semanal ou tri-horária diária, de forma a perceber em qual destas pagará um menor valor pela mesma energia. De forma a que o consumidor possa perceber se haverá vantagem de uma alteração para uma potência contratada flexível, ou para uma outra tarifa associada á energia, tem ao seu dispor uma ferramenta, que em função dos seus consumos, permite retirar conclusões sobre o preço final a pagar na fatura, após cada tipo de alteração. Esta ferramenta foi validada com recurso a várias simulações, para diferentes perfis de consumidores. Desta forma, o utilizador fica a perceber que realmente pode poupar com uma potência contratada flexível, ao mesmo tempo que pode identificar-se com um perfil de simulação e, mais facilmente, perceber para que alteração tarifária pode usufruir de uma maior poupança.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Dissertação submetida para a obtenção do grau de Doutor em Engenharia Electrotécnica e de Computadores

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Dissertação de mestrado em Engenharia de Sistemas

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Power network planning, liberalisation, optimisation, game theory, distribution network, dispersed generation, modelling, simulation, energy market

Relevância:

100.00% 100.00%

Publicador:

Resumo:

En aquest projecte es fa la implamantació d'un sistema d'informació geogràfica per la xarxa de distribució d'aigües de la població Bell-lloc d'Urgell. A més a més de tenir digitalitzada tota la zarza, s'incorpora un sistema de gestió, control i seguiment d'avaries.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Aquest treball és una introducció als sistemes d'informació geogràfica, que consisteix en una breu descripció dels aspectes fonamentals dels sistemes d'informació geogràfica i en la creació d'una base de dades dels elements d'una xarxa de distribució d'aigua potable.