844 resultados para Project 2006-036-A : Multi-Outcome Construction Policies
Resumo:
Background: Renal cystic diseases are important causes of chronic kidney disease (CKD). Objectives: We report the pattern of renal cystic disease in children and evaluate the outcome of children with multicystic dysplastic kidney (MCDK). Patients and Methods: Retrospective study of all children with cystic kidney diseases at King Abdulaziz University hospital from 2006 to 2014. Results: Total of 55 children (30 males); 25 MCDK, 22 polycystic kidney diseases (PKD), 4 nephronophthises and 4 renal cysts. Consanguinity was positive in 96.2%. MCDK and simple renal cyst patients had good renal function while PKD and nephronophthisis developed renal impairment. Most MCKD were diagnosed ante-natally, 16 of them were followed up for 3.4 (1.97) year. Their last creatinine was 33.9 (13.5) umol/L. MCDK was spontaneously involuted at mean age of 2.6 (1.3) years in 56%. Conclusions: MCDK is the commonest cystic renal disease and diagnosed ante-natally in the majority of cases. It has a good prognosis.
Resumo:
Abstract Maintaining the health of a construction project can help to achieve the desired outcomes of the project. An analogy is drawn to the medical process of a human health check where it is possible to broadly diagnose health in terms of a number of key areas such as blood pressure or cholesterol level. Similarly it appears possible to diagnose the current health of a construction project in terms of a number of Critical Success Factors (CSFs) and key performance indicators (KPIs). The medical analogy continues into the detailed investigation phase where a number of contributing factors are evaluated to identify possible causes of ill health and through the identification of potential remedies to return the project to the desired level of health. This paper presents the development of a model that diagnoses the immediate health of a construction project, investigates the factors which appear to be causing the ill health and proposes a remedy to return the project to good health. The proposed model uses the well-established continuous improvement management model (Deming, 1986) to adapt the process of human physical health checking to construction project health.
Resumo:
This study investigates the existence of intercultural adjustment in the multicultural construction workplaces by examining the leadership orientations (task-/people-orientation), communication and conflict resolution skills (high/low-context culture), and power relationship styles (high/low power distance) of local Chinese and the British expatriate project managers in the multinational construction companies in Hong Kong. A sample of project managers (N = 40) and their subordinates (N = 61) were surveyed using the structured questionnaires. Statistical techniques (independent-samples t-test, and Pearson correlation analysis) were employed to evaluate the data. The results revealed a number of interesting findings. First, it was found that both project manager groups equally considered the importance of task performance and interpersonal relationship. The results of correlations analysis provide support for the linkages of the length of working abroad with the change in task/people orientation for Chinese and expatriate managers. The analysis revealed that those Chinese managers who have the longest length of time living or working in Western countries tended to measure higher on task-orientation. Similarly, those British expatriate managers who have the longest period of working in Hong Kong tended to be less task-orientated. Second, local Chinese managers were found to be more confrontational when they strongly disagree with their team members than their British expatriate counterparts. It would appear that stress from project deadline which increase the directness and terseness in communication acts, and retain the composure of project managers in dealing with the subordinates. Finally, our findings show that there is significant difference between local Chinese and British expatriate managers in their power relationship with subordinates. This implies that although the intercultural adjustment might influence perceptions of local and expatriate managers, some dominant deep-rooted cultural values and beliefs are still not easily altered. Conclusions are presented along with suggestions for future studies.
Resumo:
The rising problems associated with construction such as decreasing quality and productivity, labour shortages, occupational safety, and inferior working conditions have opened the possibility of more revolutionary solutions within the industry. One prospective option is in the implementation of innovative technologies such as automation and robotics, which has the potential to improve the industry in terms of productivity, safety and quality. The construction work site could, theoretically, be contained in a safer environment, with more efficient execution of the work, greater consistency of the outcome and higher level of control over the production process. By identifying the barriers to construction automation and robotics implementation in construction, and investigating ways in which to overcome them, contributions could be made in terms of better understanding and facilitating, where relevant, greater use of these technologies in the construction industry so as to promote its efficiency. This research aims to ascertain and explain the barriers to construction automation and robotics implementation by exploring and establishing the relationship between characteristics of the construction industry and attributes of existing construction automation and robotics technologies to level of usage and implementation in three selected countries; Japan, Australia and Malaysia. These three countries were chosen as their construction industry characteristics provide contrast in terms of culture, gross domestic product, technology application, organisational structure and labour policies. This research uses a mixed method approach of gathering data, both quantitative and qualitative, by employing a questionnaire survey and an interview schedule; using a wide range of sample from management through to on-site users, working in a range of small (less than AUD0.2million) to large companies (more than AUD500million), and involved in a broad range of business types and construction sectors. Detailed quantitative (statistical) and qualitative (content) data analysis is performed to provide a set of descriptions, relationships, and differences. The statistical tests selected for use include cross-tabulations, bivariate and multivariate analysis for investigating possible relationships between variables; and Kruskal-Wallis and Mann Whitney U test of independent samples for hypothesis testing and inferring the research sample to the construction industry population. Findings and conclusions arising from the research work which include the ranking schemes produced for four key areas of, the construction attributes on level of usage; barrier variables; differing levels of usage between countries; and future trends, have established a number of potential areas that could impact the level of implementation both globally and for individual countries.
Resumo:
The availability of innumerable intelligent building (IB) products, and the current dearth of inclusive building component selection methods suggest that decision makers might be confronted with the quandary of forming a particular combination of components to suit the needs of a specific IB project. Despite this problem, few empirical studies have so far been undertaken to analyse the selection of the IB systems, and to identify key selection criteria for major IB systems. This study is designed to fill these research gaps. Two surveys: a general survey and the analytic hierarchy process (AHP) survey are proposed to achieve these objectives. The first general survey aims to collect general views from IB experts and practitioners to identify the perceived critical selection criteria, while the AHP survey was conducted to prioritize and assign the important weightings for the perceived criteria in the general survey. Results generally suggest that each IB system was determined by a disparate set of selection criteria with different weightings. ‘Work efficiency’ is perceived to be most important core selection criterion for various IB systems, while ‘user comfort’, ‘safety’ and ‘cost effectiveness’ are also considered to be significant. Two sub-criteria, ‘reliability’ and ‘operating and maintenance costs’, are regarded as prime factors to be considered in selecting IB systems. The current study contributes to the industry and IB research in at least two aspects. First, it widens the understanding of the selection criteria, as well as their degree of importance, of the IB systems. It also adopts a multi-criteria AHP approach which is a new method to analyse and select the building systems in IB. Further research would investigate the inter-relationship amongst the selection criteria.
Resumo:
Objectives The procurement research of Sydney Opera House FM Exemplar Project aims to develop innovative methods and guidelines for the procurement of FM services, applicable to iconic and / or performing arts centre facilities, or facilities with similar FM functions. The initial procurement report in June 2005 analysed the strategic objectives and operational requirements that provide ‘demand statements’ as evaluation criteria in the service procurement process. The subsequent interim procurement report in September 2005 discussed the elements contributing to the criteria for decision-making in the service procurement process. This procurement report concentrates on the research on procurement strategies and innovative methods using a case study approach. The objectives of this report are: • to investigate service procurement methods and process in iconic and/or performing arts centre facilities; • to showcase FM innovation in Sydney Opera House through a case study; • to establish a preliminary decision-making framework and guidelines for selection of appropriate FM procurement routes to provide a useful model for FM community. Findings Findings from this procurement research are presented as follows. • FM innovation and experience of Sydney Opera House • Innovative procurement methods and processes, drawn from a case study of Sydney Opera House as exemplar • An integrated performance framework to link maintenance service functions to high level organisational objective and strategies • Procurement methods and contract outcomes, focusing on building maintenance and cleaning services of Sydney Opera House • Multi-dimensional assessment of Service Providers • General decision-making strategies and guidelines for selection of appropriate FM procurement routes Further Research Whilst the Sydney Opera House case study emphasises the experience of Sydney Opera House, a study of procurement strategies and methods from published research and FM good practice will supply facilities managers with alternative procurement routes. Further research on the procurement theme will develop a final decision-making model for the procurement of FM services, drawn from the evaluation of the case study outcomes, as well as FM good practice and findings from current published research.
Resumo:
This report draws together the key findings from six case studies on the subject of ebusiness Adoption in Construction conducted in Australia by the University of Newcastle (UON) and Royal Melbourne Institute of Technology (RMIT) from 2005 through to mid-2006 under the auspices of the Cooperative Research Centre for Construction Innovation (CRC_CI). Reference to this timing is important because one of the key themes to emerge from the study is that the take-up of e-business is a dynamic phenomenon within the construction industry.
Resumo:
Trying to innovate or wanting to? Making a start is the most difficult step on any journey. Whether trying to innovate for the first time, or seeking improvements on current performance, organisations are confronted with a plethora of options. Innovate now! makes action easier by presenting some of the key considerations for improving innovation performance. This guide has been based on the outcomes of a survey and case studies conducted between 2003 and 2005 in the Australian property and construction industry and therefore contains unique and up-to-date information, examples and suggestions tailored specifically to your industry needs. The large-scale industry survey and 12 innovation case studies on which this guide are based were carried out by The BRITE (Building Research, Innovation, Technology and Environment) Project as part of research for the Cooperative Research Centre for Construction Innovation. The stakeholders volunteering to take part in BRITE research included over 400 businesses, 14 government organisations, 8 industry associations and 4 universities.
Resumo:
Recent initiatives around the world have highlighted the potential for information and communications technology (ICT) to foster better service delivery for businesses. Likewise, ICT has also been applied to government services and is seen to result in improved service delivery, improved citizen participation in government, and enhanced cooperation across government departments and between government departments. The Council of Australian Governments (COAG) (2006) identified local government development assessment (DA) arrangements as a ‘hot spot’ needing specific attention, as the inconsistent policies and regulations between councils impeded regional economic activity. COAG (2006) specifically suggested that trials of various ICT mechanisms be initiated which may well be able to improve DA processes for local government. While the authors have explored various regulatory mechanisms to improve harmonisation elsewhere (Brown and Furneaux 2007), the possibility of ICT being able to enhance consistency across governments is a novel notion from a public policy perspective. Consequently, this paper will explore the utility of ICT initiatives to improve harmonisation of DA across local governments. This paper examines as a case study the recent attempt to streamline Development Assessment (DA) in local governments in South East Queensland. This initiative was funded by the Regulation Reduction Incentive Fund (RRIF), and championed by the South East Queensland (SEQ) Council of Mayors. The Regulation Reduction Incentive Fund (RRIF) program was created by the Australian government with the aim to provide incentives to local councils to reduce red tape for small and medium sized businesses. The funding for the program was facilitated through a competitive merit-based grants process targeted at Local Government Authorities. Grants were awarded to projects which targeted specific areas identified for reform (AusIndustry, 2007), in SEQ this focused around improving DA processes and creating transparency in environmental health policies, regulation and compliance. An important key factor to note with this case study is that it is unusual for an eGovernment initiative. Typically individual government departments undertake eGovernment projects in order to improve their internal performance. The RRIF case study examines the implementation of an eGovernment initiative across 21 autonomous local councils in South East Queensland. In order to move ahead, agreement needed to be reached between councils at the highest level. Having reviewed the concepts of eGovernment and eGovernance, the literature review is undertaken to identify the typical cost and benefits, barriers and enablers of ICT projects in government. The specific case of the RRIF project is then examined to determine if similar costs and benefits, barriers and enablers could be found in the RRIF project. The outcomes of the project, particularly in reducing red tape by increasing harmonisation between councils are explored.