861 resultados para Electric utilities -- Accounting -- Australia
Resumo:
The G20 Finance Ministers have the opportunity this weekend to endorse the initial recommendations of the OECD on how to address the global problem of multinational tax avoidance. The work of the OECD on the issue to date is substantial. Most notable is the adoption by many nations, including Australia, of the Common Reporting Standard for the automatic exchange of tax information. This standard will allow significant inroads to be made into tax avoidance, particularly by individuals sheltering money offshore. This is the first step in an ambitious tax reform program. There is a long way to go if we are to end the issue now known as Base Erosion and Profit Shifting (BEPS). This week’s release of the first of the OECD recommendations contains some positive signs that further advances will be made. It also recognises some hard truths.
Resumo:
This paper examines the association between the level of audit fees paid and asset revaluations, one use of fair value accounting. This Australian study also investigates attributes of asset revaluations and the association with the level of audit fees paid. We find that firms choosing the revaluation model incur higher audit fees than those that chose the cost model; asset revaluations made by directors lead to the firm incurring higher audit fees than for those made by external independent appraisers; and revaluation of investment properties leads to lower audit fees. The findings suggest that asset revaluations can result in higher agency costs and audit fees vary with the reliability of the revaluations and the class of assets being revalued.
Resumo:
Ceramic/Porcelain insulators are widely used in power transmission lines to provide mechanical support for High voltage conductors in addition to withstand electrical stresses. As a result of lightning, switching or temporary over voltages that could initiate flashover under worst weather conditions, and to operate within interference limits. Given that the useful life in service of the individual insulator elements making up the insulator strings is hard to predict, they must be verified periodically to ensure that adequate line reliability is maintained at all times. Over the years utilities have adopted few methods to detect defective discs in a string, subsequently replacement of the faulty discs are being carried out for smooth operation. But, if the insulator is found to be defective in a string at some location that may not create any changes in the field configuration, there is no need to replace to avoid manpower and cost of replacement. Due to deficiency of electric field data for the existing string configuration, utilities are forced to replace the discs which may not be essentially required. Hence, effort is made in the present work to simulate the potential and electric field along the normal and with faults induced discs in a string up to 765 kV system voltages using Surface Charge Simulation Method (SCSM). A comparison is made between simulated results, experimental and field data and it was found that the computed results are quite acceptable and useful.
Resumo:
Analyses of stomach contents of 330 Malapterurus electricus (standard length, 10.1-30.5 cm) in Mahin Lagoon (southwestern Nigeria) established it as a bottom feeder. There was a preponderance of insects accounting for >80% occurrence and >25% of total volume in stomachs of specimens, suggesting a stenophagous predatory habit. Qualitative and quantitative assays of digestive enzymes in the different regions of the gut (oesophagus, stomach, duodenum, ileum, rectum) were investigated. Carbohydrases (amylase, maltase), chitinase, proteases (pepsin, chymotrypsin, trypsin) and lipases were detected in different gut regions with different activity. The pattern of distribution and relative activity of the enzymes correlated with the predatory diet
Resumo:
The polarization of vertical-cavity surface-emitting laser (VCSEL) can be controlled by electro-optic birefringence. We calculated the birefringence resulted from external electric field which was imposed on the top DBR of VCSEL by assuming that the two polarization modes were in the same place of the gain spectra in the absence of electric field beginning. By modifying SFM, the affection of the electric field strength on the polarization switching currents between the two polarization modes had been shown.
Resumo:
This article offers a replication for Britain of Brown and Heywood's analysis of the determinants of performance appraisal in Australia. Although there are some important limiting differences between our two datasets - the Australia Workplace Industrial Relations Survey (AWIRS) and the Workplace Employment Relations Survey (WERS) - we reach one central point of agreement and one intriguing shared insight. First, performance appraisal is negatively associated with tenure: where employers cannot rely on the carrot of deferred pay or the stick of dismissal to motivate workers, they will tend to rely more on monitoring, ceteris paribus. Second, employer monitoring and performance pay may be complementary. However, consonant with the disparate results from the wider literature, there is more modest agreement on the contribution of specific human resource management practices, and still less on the role of job control.
Resumo:
This paper investigates how the Kyoto Protocol has framed political discourse and policy development of greenhouse gas mitigation in Australia. We argue that ‘Kyoto’ has created a veil over the climate issue in Australia in a number of ways. Firstly, its symbolic power has distracted attention from actual environmental outcomes while its accounting rules obscure the real level of carbon emissions and structural trends at the nation-state level. Secondly, a public policy tendency to commit to far off emission targets as a compromise to implementing legislation in the short term has also emerged on the back of Kyoto-style targets. Thirdly, Kyoto’s international flexibility mechanisms can lead to the diversion of mitigation investment away from the nation-state implementing carbon legislation. A final concern of the Kyoto approach is how it has shifted focus away from Australia as the world’s largest coal exporter towards China, its primary customer. While we recognise the crucial role aspirational targets and timetables play in capturing the imagination and coordinating action across nations, our central theme is that ‘Kyoto’ has overshadowed the implementation of other policies in Australia. Understanding how ‘Kyoto’ has framed debate and policy is thus crucial to promoting environmentally effective mitigation measures as nation-states move forward from COP15 in Copenhagen to forge a post-Kyoto international agreement. Recent elections in 2009 in Japan and America and developments at COP15 suggest positive scope for international action on climate change. However, the lesson from the 2007 election and subsequent events in Australia is a caution against elevating the symbolism of ‘Kyoto-style’ targets and timetables above the need for implementation of mitigation policies at the nation-state level
Resumo:
Two common methods of accounting for electric-field-induced perturbations to molecular vibration are analyzed and compared. The first method is based on a perturbation-theoretic treatment and the second on a finite-field treatment. The relationship between the two, which is not immediately apparent, is made by developing an algebraic formalism for the latter. Some of the higher-order terms in this development are documented here for the first time. As well as considering vibrational dipole polarizabilities and hyperpolarizabilities, we also make mention of the vibrational Stark effec
Resumo:
There are many geochemical reconstructions of environmental change in the mid and high latitudes but relatively few in the tropical latitudes, despite their considerable potential for reconstructing environmental processes that cannot be identified using more traditional proxies. Here we present one reconstruction of environmental change for the tropics. This reconstruction covers the past 50 ka using a suite of geochemical data from the high-resolution sequence of Lynch's Crater in northeast Queensland, Australia, a region highly sensitive to El Niño-Southern Oscillation (ENSO) activity. The 23 major oxides and trace elements measured could be summarised by extracting three axes using principal components analysis (accounting for 72% of the variability). The data indicate that the greatest variability in the geochemical data accounted for erosional activity within the catchment that was associated with past changes in the frequency of ENSO activity (though this was less sensitive during wetter periods, probably as a result of buffering by high vegetation cover). The remaining variability was largely explained by elements that form complexes with organic compounds (e.g., humic acids) and those that are important nutrients for specific vegetation types (and therefore a measure of vegetation distribution). For more detailed reconstructions, further work is required to disentangle the complex controls of elements within sedimentary sequences.
Resumo:
Earlier accounting works have shown that an understanding of agenda entry is critical to better understanding the accounting standards setting process. Consider Walker and Robinson (1993; 1994) and Ryan (1998); and more generally agenda entrance as theorized in Kingdon (2011). In 2003, the IASB placed on its agenda a project to promulgate a standard for small and medium-sized entities (SMEs). This provides our focus. It seemed to be a departure from the IASB’s constitutional focus on capital market participants. Kingdon’s three-streams model of agenda entry helps to identify some of the complexities related to politics and decision making messiness that resulted in a standard setting project for simplified IFRS, misleadingly titled IFRS for SMEs. Complexities relate to the broader international regulatory context, including the boundaries of the IASB’s standard-setting jurisdiction, the role of board members in changing those boundaries, and such sensitivities over the language that the IASB could not agree on a suitably descriptive title. The paper shows similarities with earlier agenda entrance studies by Walker and Robinson (1994) and Ryan (1998). By drawing on interviewees’ recollections and other material it especially reinforces the part played by the nuanced complexities that influence what emerges as an international accounting standard.
Resumo:
This thesis develops and evaluates a business model for connected full electric vehicles (FEV) for the European market. Despite a promoting political environment, various barriers have thus far prevented the FEV from becoming a mass-market vehicle. Besides cost, the most noteworthy of these barriers is represented by range anxiety, a product of FEVs’ limited range, lacking availability of charging infrastructure, and long recharging times. Connected FEVs, which maintain a constant connection to the surrounding infrastructure, appear to be a promising element to overcome drivers’ range anxiety. Yet their successful application requires a well functioning FEV ecosystem which can only be created through the collaboration of various stakeholders such as original equipment manufacturers (OEM), first tier suppliers (FTS), charging infrastructure and service providers (CISP), utilities, communication enablers, and governments. This thesis explores and evaluates how a business model, jointly created by these stakeholders, could look like, i.e. how stakeholders could collaborate in the design of products, services, infrastructure, and advanced mobility management, to meet drivers with a sensible value proposition that is at least equivalent to that of internal combustion engine (ICE) cars. It suggests that this value proposition will be an end-2-end package provided by CISPs or OEMs that comprises mobility packages (incl. pay per mile plans, battery leasing, charging and battery swapping (BS) infrastructure) and FEVs equipped with an on-board unit (OBU) combined with additional services targeted at range anxiety reduction. From a theoretical point of view the thesis answers the question which business model framework is suitable for the development of a holistic, i.e. all stakeholder-comprising business model for connected FEVs and defines such a business model. In doing so the thesis provides the first comprehensive business model related research findings on connected FEVs, as prior works focused on the much less complex scenario featuring only “offline” FEVs.
Resumo:
When dealing with spatio-temporal simulations of load growth inside a service zone, one of the most important problems faced by a Distribution Utility is how to represent the different relationships among different areas. A new load in a certain part of the city could modify the load growth in other parts of the city, even outside of its radius of influence. These interactions are called Urban Dynamics. This work aims to discuss how to implement Urban Dynamics considerations into the spatial electric load forecasting simulations using multi-agent simulations. To explain the approach, three examples are introduced, including the effect of an attraction load, the effect of a repulsive load, and the effect of several attraction/repulsive loads at the same time when considering the natural load growth. © 2012 IEEE.
Resumo:
The rapid industrial development and disorganized population growth in huge cities bring about various urban problems due to intense use of physical space on and below the surface. Subsurface problems in metropolitan areas are caused by subway line construction, which often follows the routes of utility networks, such as electric and telephone cables, water and gas pipes, storm sewers, etc. Usually, the main problems are related to damage or destruction of preexisting utilities, often putting human lives at risk. With the purpose of minimizing risks. GPR-profiling with 200 MHz antennae was done at two sites, both located in downtown Sao Paulo, Brazil. The objectives of this work were to map utilities or existing infrastructure in the subsurface in order to orient the construction of the Line 4 (yellow) subway tunnel in Sao Paulo. GPR profiles can detect water pipes, utility networks in the subsurface, and concrete foundation columns or pilings in subsoil up to 2 m depth. In addition. the GPR profiles also provided details of the target shapes in the subsurface. GPR interpretations combined with lithological information from boreholes and trenches opened in the study areas were extremely important in mapping of the correct spatial distribution of buried utilities at these two sites in Sao Paulo. This information improves and updates maps of utility placement, serves as a basis for planning of the geotechnical excavation of the Line 4 (yellow) subway tunnel in Sao Paulo, helps minimize problems related to destruction of preexisting utilities in the subsoil, and avoids risk of dangerous accidents. (C) 2012 Elsevier B.V. All rights reserved.
Resumo:
The research activity carried out during the PhD course in Electrical Engineering belongs to the branch of electric and electronic measurements. The main subject of the present thesis is a distributed measurement system to be installed in Medium Voltage power networks, as well as the method developed to analyze data acquired by the measurement system itself and to monitor power quality. In chapter 2 the increasing interest towards power quality in electrical systems is illustrated, by reporting the international research activity inherent to the problem and the relevant standards and guidelines emitted. The aspect of the quality of voltage provided by utilities and influenced by customers in the various points of a network came out only in recent years, in particular as a consequence of the energy market liberalization. Usually, the concept of quality of the delivered energy has been associated mostly to its continuity. Hence the reliability was the main characteristic to be ensured for power systems. Nowadays, the number and duration of interruptions are the “quality indicators” commonly perceived by most customers; for this reason, a short section is dedicated also to network reliability and its regulation. In this contest it should be noted that although the measurement system developed during the research activity belongs to the field of power quality evaluation systems, the information registered in real time by its remote stations can be used to improve the system reliability too. Given the vast scenario of power quality degrading phenomena that usually can occur in distribution networks, the study has been focused on electromagnetic transients affecting line voltages. The outcome of such a study has been the design and realization of a distributed measurement system which continuously monitor the phase signals in different points of a network, detect the occurrence of transients superposed to the fundamental steady state component and register the time of occurrence of such events. The data set is finally used to locate the source of the transient disturbance propagating along the network lines. Most of the oscillatory transients affecting line voltages are due to faults occurring in any point of the distribution system and have to be seen before protection equipment intervention. An important conclusion is that the method can improve the monitored network reliability, since the knowledge of the location of a fault allows the energy manager to reduce as much as possible both the area of the network to be disconnected for protection purposes and the time spent by technical staff to recover the abnormal condition and/or the damage. The part of the thesis presenting the results of such a study and activity is structured as follows: chapter 3 deals with the propagation of electromagnetic transients in power systems by defining characteristics and causes of the phenomena and briefly reporting the theory and approaches used to study transients propagation. Then the state of the art concerning methods to detect and locate faults in distribution networks is presented. Finally the attention is paid on the particular technique adopted for the same purpose during the thesis, and the methods developed on the basis of such approach. Chapter 4 reports the configuration of the distribution networks on which the fault location method has been applied by means of simulations as well as the results obtained case by case. In this way the performance featured by the location procedure firstly in ideal then in realistic operating conditions are tested. In chapter 5 the measurement system designed to implement the transients detection and fault location method is presented. The hardware belonging to the measurement chain of every acquisition channel in remote stations is described. Then, the global measurement system is characterized by considering the non ideal aspects of each device that can concur to the final combined uncertainty on the estimated position of the fault in the network under test. Finally, such parameter is computed according to the Guide to the Expression of Uncertainty in Measurements, by means of a numeric procedure. In the last chapter a device is described that has been designed and realized during the PhD activity aiming at substituting the commercial capacitive voltage divider belonging to the conditioning block of the measurement chain. Such a study has been carried out aiming at providing an alternative to the used transducer that could feature equivalent performance and lower cost. In this way, the economical impact of the investment associated to the whole measurement system would be significantly reduced, making the method application much more feasible.
Resumo:
In the U.S., many electric utility companies are offering demand-side management (DSM) programs to their customers as ways to save money and energy. However, it is challenging to compare these programs between utility companies throughout the U.S. because of the variability of state energy policies. For example, some states in the U.S. have deregulated electricity markets and others do not. In addition, utility companies within a state differ depending on ownership and size. This study examines 12 utilities’ experiences with DSM programs and compares the programs’ annual energy savings results that the selected utilities reported to the Energy Information Administration (EIA). The 2009 EIA data suggests that DSM program effectiveness is not significantly affected by electricity market deregulation or utility ownership. However, DSM programs seem to generally be more effective when administered by utilities located in states with energy savings requirements and DSM program mandates.