986 resultados para Airport construction contracts
Resumo:
Joint ventures can take many forms and can be formed for different reasons, from sharing resources to creating future business opportunities. At the same time, there is increasing interest and discussion of alternative procurement methods, moving away from traditional procurement systems to relational approaches. Business systems and strategies need to be redefined and move from a short-term project to project culture to a more strategic, long-term perspective. Joint ventures of construction organisations, global and local, have become increasingly popular to deliver large-scale infrastructure construction projects. However, successful strategic collaborations require project organisations to formulate a fit between contractual and operational arrangements for each situation. This study reviews the movement from traditional procurement methods towards relational contracting approaches in Queensland, Australia. The study examines the organisational factors that facilitates sustainable relationship between project organisations and hence, lead to long-term business success. This paper reports on initial findings captured from a survey undertaken with construction contracting organisations in Australia, focusing on the supply chain relationships. Contractors’ perceptions of the relationship management process and the engagement of the supply chain are also presented.
Resumo:
This report focuses on risk-assessment practices in the private rental market, with particular consideration of their impact on low-income renters. It is based on the fieldwork undertaken in the second stage of the research process that followed completion of the Positioning Paper. The key research question this study addressed was: What are the various factors included in ‘risk-assessments’ by real estate agents in allocating ‘affordable’ tenancies? How are these risks quantified and managed? What are the key outcomes of their decision-making? The study builds on previous research demonstrating that a relatively large proportion of low-cost private rental accommodation is occupied by moderate- to high-income households (Wulff and Yates 2001; Seelig 2001; Yates et al. 2004). This is occurring in an environment where the private rental sector is now the de facto main provider of rental housing for lower-income households across Australia (Seelig et al. 2005) and where a number of factors are implicated in patterns of ‘income–rent mismatching’. These include ongoing shifts in public housing assistance; issues concerning eligibility for rent assistance; ‘supply’ factors, such as loss of low-cost rental stock through upgrading and/or transfer to owner-occupied housing; patterns of supply and demand driven largely by middle- to high-income owner-investors and renters; and patterns of housing need among low-income households for whom affordable housing is not appropriate. In formulating a way of approaching the analysis of ‘risk-assessment’ in rental housing management, this study has applied three sociological perspectives on risk: Beck’s (1992) formulation of risk society as entailing processes of ‘individualisation’; a socio-cultural perspective which emphasises the situated nature of perceptions of risk; and a perspective which has drawn attention to different modes of institutional governance of subjects, as ‘carriers of specific indicators of risk’. The private rental market was viewed as a social institution, and the research strategy was informed by ‘institutional ethnography’ as a method of enquiry. The study was based on interviews with property managers, real estate industry representatives, tenant advocates and community housing providers. The primary focus of inquiry was on ‘the moment of allocation’. Six local areas across metropolitan and regional Queensland, New South Wales, and South Australia were selected as case study localities. In terms of the main findings, it is evident that access to private rental housing is not just a matter of ‘supply and demand’. It is also about assessment of risk among applicants. Risk – perceived or actual – is thus a critical factor in deciding who gets housed, and how. Risk and its assessment matter in the context of housing provision and in the development of policy responses. The outcomes from this study also highlight a number of salient points: 1.There are two principal forms of risk associated with property management: financial risk and risk of litigation. 2. Certain tenant characteristics and/or circumstances – ability to pay and ability to care for the rented property – are the main factors focused on in assessing risk among applicants for rental housing. Signals of either ‘(in)ability to pay’ and/or ‘(in)ability to care for the property’ are almost always interpreted as markers of high levels of risk. 3. The processing of tenancy applications entails a complex and variable mix of formal and informal strategies of risk-assessment and allocation where sorting (out), ranking, discriminating and handing over characterise the process. 4. In the eyes of property managers, ‘suitable’ tenants can be conceptualised as those who are resourceful, reputable, competent, strategic and presentable. 5. Property managers clearly articulated concern about risks entailed in a number of characteristics or situations. Being on a low income was the principal and overarching factor which agents considered. Others included: - unemployment - ‘big’ families; sole parent families - domestic violence - marital breakdown - shift from home ownership to private rental - Aboriginality and specific ethnicities - physical incapacity - aspects of ‘presentation’. The financial vulnerability of applicants in these groups can be invoked, alongside expressed concerns about compromised capacities to manage income and/or ‘care for’ the property, as legitimate grounds for rejection or a lower ranking. 6. At the level of face-to-face interaction between the property manager and applicants, more intuitive assessments of risk based upon past experience or ‘gut feelings’ come into play. These judgements are interwoven with more systematic procedures of tenant selection. The findings suggest that considerable ‘risk’ is associated with low-income status, either directly or insofar as it is associated with other forms of perceived risk, and that such risks are likely to impede access to the professionally managed private rental market. Detailed analysis suggests that opportunities for access to housing by low-income householders also arise where, for example: - the ‘local experience’ of an agency and/or property manager works in favour of particular applicants - applicants can demonstrate available social support and financial guarantors - an applicant’s preference or need for longer-term rental is seen to provide a level of financial security for the landlord - applicants are prepared to agree to specific, more stringent conditions for inspection of properties and review of contracts - the particular circumstances and motivations of landlords lead them to consider a wider range of applicants - In particular circumstances, property managers are prepared to give special consideration to applicants who appear worthy, albeit ‘risky’. The strategic actions of demonstrating and documenting on the part of vulnerable (low-income) tenant applicants can improve their chances of being perceived as resourceful, capable and ‘savvy’. Such actions are significant because they help to persuade property managers not only that the applicant may have sufficient resources (personal and material) but that they accept that the onus is on themselves to show they are reputable, and that they have valued ‘competencies’ and understand ‘how the system works’. The parameters of the market do shape the processes of risk-assessment and, ultimately, the strategic relation of power between property manager and the tenant applicant. Low vacancy rates and limited supply of lower-cost rental stock, in all areas, mean that there are many more tenant applicants than available properties, creating a highly competitive environment for applicants. The fundamental problem of supply is an aspect of the market that severely limits the chances of access to appropriate and affordable housing for low-income rental housing applicants. There is recognition of the impact of this problem of supply. The study indicates three main directions for future focus in policy and program development: providing appropriate supports to tenants to access and sustain private rental housing, addressing issues of discrimination and privacy arising in the processes of selecting suitable tenants, and addressing problems of supply.
Resumo:
Anecdotal evidence highlights issues of alcohol and other drugs (AODs) and its association with safety risk on construction sites. Information is limited however regarding the prevalence of AODs in the workplace and there is limited evidential guidance regarding how to effectively address it. This research aimed to scientifically evaluate the use of AODs within the Australian construction industry in order to reduce the potential resulting safety and performance impacts and engender a cultural change in the workforce. A national qualitative and quantitative evaluation of the use of AODs was conducted with approximately 500 employees. Results indicate that as in the general population, a proportion of those sampled in the construction sector may be at risk of hazardous alcohol consumption and support the need for evidence-based, tailored responses. This is the first known study to scientifically evaluate the use of AODs and potential workplace safety impacts in the construction sector.
Resumo:
The paper charts the history and development of the Hong Kong Housing Department (HKHD) Performance Assessment Scoring System (PASS) from 1990 to the present day and examines its effect on facilitating change to the quality of construction work of building contractors engaged in the production of public sector housing projects Hong Kong. The paper builds partly on empirical research carried out by the author as part of a doctoral thesis from 2000 to 2005, on experiential knowledge and also on some relevant case studies. The outcomes from this earlier research and validation of PASS based on results derived from the system since the research was originally undertaken are of benefit to practitioners and academics working and studying in the areas of performance assessment and organisational culture and change. The conclusions presented in the paper further underpin the connection established in previous research between strong organisational culture and project and corporate success. Organisational culture was measured using a survey instrument originally developed by Denison and Neale (1994), adapted for the environment of the study, and corporate success was measured by the PASS system mentioned above. The major results of the original study indicate that there is significant linkage between strong organisational cultures and business success and the detailed findings were that, (1) strong organisational culture was positively associated a high level of company effectiveness, (2) a high level of company effectiveness was positively associated with the cultural traits of ‘consistency’, ‘adaptability’ and ‘mission’, and (3) a high level of company effectiveness was positively associated with the combined cultural traits represented by the dimensions of ‘external focus’ and ‘stable culture’. Several opportunities to take forward this research have been identified, including extending the study to other countries and also longitudinally re-evaluating some of the original case studies to ascertain how organisational cultures have changed or further developed in relation to the changing construction climate in Hong Kong.
Resumo:
Emissions from airport operations are of significant concern because of their potential impact on local air quality and human health. The currently limited scientific knowledge of aircraft emissions is an important issue worldwide, when considering air pollution associated with airport operation, and this is especially so for ultrafine particles. This limited knowledge is due to scientific complexities associated with measuring aircraft emissions during normal operations on the ground. In particular this type of research has required the development of novel sampling techniques which must take into account aircraft plume dispersion and dilution as well as the various particle dynamics that can affect the measurements of the aircraft engine plume from an operational aircraft. In order to address this scientific problem, a novel mobile emission measurement method called the Plume Capture and Analysis System (PCAS), was developed and tested. The PCAS permits the capture and analysis of aircraft exhaust during ground level operations including landing, taxiing, takeoff and idle. The PCAS uses a sampling bag to temporarily store a sample, providing sufficient time to utilize sensitive but slow instrumental techniques to be employed to measure gas and particle emissions simultaneously and to record detailed particle size distributions. The challenges in relation to the development of the technique include complexities associated with the assessment of the various particle loss and deposition mechanisms which are active during storage in the PCAS. Laboratory based assessment of the method showed that the bag sampling technique can be used to accurately measure particle emissions (e.g. particle number, mass and size distribution) from a moving aircraft or vehicle. Further assessment of the sensitivity of PCAS results to distance from the source and plume concentration was conducted in the airfield with taxiing aircraft. The results showed that the PCAS is a robust method capable of capturing the plume in only 10 seconds. The PCAS is able to account for aircraft plume dispersion and dilution at distances of 60 to 180 meters downwind of moving a aircraft along with particle deposition loss mechanisms during the measurements. Characterization of the plume in terms of particle number, mass (PM2.5), gaseous emissions and particle size distribution takes only 5 minutes allowing large numbers of tests to be completed in a short time. The results were broadly consistent and compared well with the available data. Comprehensive measurements and analyses of the aircraft plumes during various modes of the landing and takeoff (LTO) cycle (e.g. idle, taxi, landing and takeoff) were conducted at Brisbane Airport (BNE). Gaseous (NOx, CO2) emission factors, particle number and mass (PM2.5) emission factors and size distributions were determined for a range of Boeing and Airbus aircraft, as a function of aircraft type and engine thrust level. The scientific complexities including the analysis of the often multimodal particle size distributions to describe the contributions of different particle source processes during the various stages of aircraft operation were addressed through comprehensive data analysis and interpretation. The measurement results were used to develop an inventory of aircraft emissions at BNE, including all modes of the aircraft LTO cycle and ground running procedures (GRP). Measurements of the actual duration of aircraft activity in each mode of operation (time-in-mode) and compiling a comprehensive matrix of gas and particle emission rates as a function of aircraft type and engine thrust level for real world situations was crucial for developing the inventory. The significance of the resulting matrix of emission rates in this study lies in the estimate it provides of the annual particle emissions due to aircraft operations, especially in terms of particle number. In summary, this PhD thesis presents for the first time a comprehensive study of the particle and NOx emission factors and rates along with the particle size distributions from aircraft operations and provides a basis for estimating such emissions at other airports. This is a significant addition to the scientific knowledge in terms of particle emissions from aircraft operations, since the standard particle number emissions rates are not currently available for aircraft activities.
Resumo:
Worldwide, education systems have undergone unprecedented change due to a variety of economic, social, and political forces (Limerick, Cunnington & Crowther, 2002). The People’s Republic of China (PRC) is no exception. Continuous educational reform at primary and secondary levels in Mainland China has created new challenges and accountabilities for school principals. The important role of principals in primary and secondary schools has been acknowledged in both policy documents and the broader literature (Central Committee of the Chinese Communist Party, 1985; F. Chen, 2005; Chu, 2003; W. Huang, 2005; T. Wang, 2003). Yet, most of the literature on primary and secondary school principals in Mainland China is prescriptive in nature, identifying from the perspectives of researchers and academics what principals should do and how they should enact leadership. Lacking in this research is an awareness of the daily practices and lived experiences of principals. Furthermore, within the small body of writing on primary and secondary school principals in Mainland China, gender is seldom given any attention. To date, only a small number of empirical studies have focused on female principals as a specific category of research (Zen, 2004; Zhong, 2004). This study aimed to explore the professional lives of two female exemplary school principals in urban primary schools in Mainland China. A qualitative exploratory case study was used. Semi-structured interviews with each individual female principal, with six teachers in each of the school sites and with the superintendent of each principal were conducted. Field observations and document analysis were also undertaken to obtain multiple insights about their leadership practices. The conceptual framework was based largely on the theory of Gronn (1999) and incorporated five core leadership practices (vision building, ethical considerations, teaching and learning, power utilisation, and dealing with risks and challenges) taken from the wider literature. The key findings of this study were twofold. Firstly, while the five leadership practices were evident in the leadership of the two principals, this study identified some subtle differences in the way they approached each of them. Secondly, contextual factors such as Chinese traditional culture, the contemporary societal context, and the school organisational context, in addition to the biographical experiences of each principal were significant factors in shaping the way in which they exercised their leadership practices in the schools.
Resumo:
The Cooperative Research Centre (CRC) for Construction Innovation is Australia’s national centre for research and innovation focused on the needs of the property, design, construction and facility management sectors. The period covered by this report is from 1 July 2001 to 30 October 2009. The report comprises of two parts. Part A details the future and possible future impact of the CRC including: The Future of the CRC, Research and Commercialisation, Economic Benefit to Australia, Public Good Benefits to Australia. Part B details the achievements during the funding period including: Economic Benefit and Commercialisation, Uptake of Research Results, Impact of Education Programs, CRC Operations.
Resumo:
Purpose –The introduction of Building Information Model tools over the last 20 years is resulting in radical changes in the Architectural, Engineering and Construction industry. One of these changes concerns the use of Virtual Prototyping - an advanced technology integrating BIM with realistic graphical simulations. Construction Virtual Prototyping (CVP) has now been developed and implemented on ten real construction projects in Hong Kong in the past three years. This paper reports on a survey aimed at establishing the effects of adopting this new technology and obtaining recommendations for future development. Design/methodology/approach – A questionnaire survey was conducted in 2007 of 28 key participants involved in four major Hong Kong construction projects – these projects being chosen because the CVP approach was used in more than one stage in each project. In addition, several interviews were conducted with the project manager, planning manager and project engineer of an individual project. Findings –All the respondents and interviewees gave a positive response to the CVP approach, with the most useful software functions considered to be those relating to visualisation and communication. The CVP approach was thought to improve the collaboration efficiency of the main contractor and sub-contractors by approximately 30 percent, and with a concomitant 30 to 50 percent reduction in meeting time. The most important benefits of CPV in the construction planning stage are the improved accuracy of process planning and shorter planning times, while improved fieldwork instruction and reducing rework occur in the construction implementation stage. Although project teams are hesitant to attribute the use of CVP directly to any specific time savings, it was also acknowledged that the workload of project planners is decreased. Suggestions for further development of the approach include incorporation of automatic scheduling and advanced assembly study. Originality/value –Whilst the research, development and implementation of CVP is relatively new in the construction industry, it is clear from the applications and feedback to date that the approach provides considerable added value to the organisation and management of construction projects.
Resumo:
The inherent uncertainty and complexity of construction work make construction planning a particularly difficult task for project managers due to the need to anticipate and visualize likely future events. Conventional computer-assisted technology can help but is often limited to the constructability issues involved. Virtual prototyping, however, offers an improved method through the visualization of construction activities by computer simulation — enabling a range of ‘what-if’ questions to be asked and their implications on the total project to be investigated. This paper describes the use of virtual prototyping to optimize construction planning schedules by analyzing resource allocation and planning with integrated construction models, resource models, construction planning schedules and site-layout plans. A real-life case study is presented that demonstrates the use of a virtual prototyping enabled resource analysis to reallocate space, logistic on access road and arrange tower cranes to achieve a 6-day floor construction cycle.
Resumo:
A strong designated verifier signature scheme makes it possible for a signer to convince a designated verifier that she has signed a message in such a way that the designated verifier cannot transfer the signature to a third party, and no third party can even verify the validity of a designated verifier signature. We show that anyone who intercepts one signature can verify subsequent signatures in Zhang-Mao ID-based designated verifier signature scheme and Lal-Verma ID-based designated verifier proxy signature scheme. We propose a new and efficient ID-based designated verifier signature scheme that is strong and unforgeable. As a direct corollary, we also get a new efficient ID-based designated verifier proxy signature scheme.
Resumo:
To date, most theories of business models have theorized value capture assuming that appropriability regimes were exogenous and that the firm would face a unique, ideal-typical appropriability regime. This has led theory contributions to focus on governance structures to minimize transaction costs, to downplay the interdepencies between value capture and value creation, and to ignore revenue generation strategies. We propose a reconceptualization of business models value capture mechanisms that rely on assumptions of endogeneity and multiplicity of appropriability regimes. This new approach to business model construction highlights the interdependencies and trade-offs between value creation and value capture offered by different types and combinations of appropriability regimes. The theory is illustrated by the analysis of three cases of open source software business models
Resumo:
An airport is one of the largest and most complex systems in modern society. Observational field studies have been conducted to investigate passenger experiences in, and interactions within, an international airport. Based on these studies, this paper discusses how activities mediate people’s experiences in the airport. For example, moving through the security screening process is discussed from both passenger and staff perspectives. The applied coding scheme ensured research rigor. The findings illustrate that passenger activities are complex and shared, and only partially supported by current terminal design. Thus, this research has the potential to impact on airport design to facilitate passenger flow through airport precincts.