911 resultados para traffic intersections
Resumo:
Managing existing and newly constructed highway corridors has recently become a significant concern in many states, including Iowa. As urban land and land on the urban fringe develops, there is pressure to add features such as commercial driveways, at-grade public road intersections, and traffic signals to arterial highway routes that should primarily serve high-speed traffic. This diminishes the speed and traffic capacity of such roadways and can also cause significant safety issues. if mobility and safety are diminished, the value of the highway investment is diminished. Since a major highway corridor improvement may cost tens of millions of dollars or more, corridor management is as critical to preserving that investment as is more "hard side" management practices such as pavement or bridge management. Corridor management is a process that applies access management principles to highway corridors in an attempt to balance the competing needs of traffic service, safety, and support for land development. This project helped to identify routes that should be given high priority for corridor management. The pilot study in the form of two corridor management case studies provides an analytical process that can be replicated along the other Iowa commuting corridors using commonly available transportation and land use data resources. It also offers a general set of guidelines for the Iowa Department of Transportation to use in the development of its own comprehensive corridor management program.
Resumo:
Data tables describing the length and vehicle-miles of travel on Iowa's 1975 proposed interstate system, broken down by interstate. No text is available.
Resumo:
Pavement and shoulder edge drop-offs commonly occur in work zones as the result of overlays, pavement replacement, or shoulder construction. The depth of these elevation differentials can vary from approximately one inch when a flexible pavement overlay is applied to several feet where major reconstruction is undertaken. The potential hazards associated with pavement edge differentials depend on several factors including depth of the drop-off, shape of the pavement edge, distance from traveled way, vehicle speed, traffic mix, volume, and other factors. This research was undertaken to review current practices in other states for temporary traffic control strategies addressing lane edge differentials and to analyze crash data and resultant litigation related to edge drop-offs. An objective was to identify cost-effective practices that would minimize the potential for and impacts of edge drop crashes in work zones. Considerable variation in addressing temporary traffic control in work zones with edge drop-off exposure was found among the states surveyed. Crashes related to pavement edge drop-offs in work zones do not commonly occur in the state of Iowa, but some have resulted in significant tort claims and settlements. The use of benefit/cost analysis may provide guidance in selection of an appropriate mitigation and protection of edge drop-off conditions. Development and adoption of guidelines for design of appropriate traffic control for work zones that include edge drop-off exposure, particularly identifying effective use of temporary barrier rail, may be beneficial in Iowa.
Resumo:
This handbook provides a broad, easy to understand reference for temporary traffic control in work zones, addressing the safe and efficient accommodation of all road users: motorists, bicyclists, pedestrians, and those with special needs. When impacting a pedestrian facility, provide ten calendar days advance notification to the local jurisdiction and the National Federation of the Blind of Iowa (www.nfbi.org). The information presented is based on standards and guidance in the 2009 Edition of the Manual on Uniform Traffic Control Devices (MUTCD). References to the MUTCD sign designations in this handbook are shown in parentheses, e.g. (W20-1). Not all the recommendations in this handbook will apply to every circumstance faced by local agencies, and each unique situation may not be addressed. Modifications of the typical applications in this handbook will be required to adapt to specific field conditions. Therefore, use engineering judgment, seeking the advice of experienced professionals and supervisors in difficult and complex interpretations. This handbook can be used as a reference for temporary traffic control in work zones on all city or county roadways. However, always check contract documents and local agency requirements for any pertinent modifications.
Resumo:
Rural intersections account for 30% of crashes in rural areas and 6% of all fatal crashes, representing a significant but poorly understood safety problem. Transportation agencies have traditionally implemented countermeasures to address rural intersection crashes but frequently do not understand the dynamic interaction between the driver and roadway and the driver factors leading to these types of crashes. The Second Strategic Highway Research Program (SHRP 2) conducted a large-scale naturalistic driving study (NDS) using instrumented vehicles. The study has provided a significant amount of on-road driving data for a range of drivers. The present study utilizes the SHRP 2 NDS data as well as SHRP 2 Roadway Information Database (RID) data to observe driver behavior at rural intersections first hand using video, vehicle kinematics, and roadway data to determine how roadway, driver, environmental, and vehicle factors interact to affect driver safety at rural intersections. A model of driver braking behavior was developed using a dataset of vehicle activity traces for several rural stop-controlled intersections. The model was developed using the point at which a driver reacts to the upcoming intersection by initiating braking as its dependent variable, with the driver’s age, type and direction of turning movement, and countermeasure presence as independent variables. Countermeasures such as on-pavement signing and overhead flashing beacons were found to increase the braking point distance, a finding that provides insight into the countermeasures’ effect on safety at rural intersections. The results of this model can lead to better roadway design, more informed selection of traffic control and countermeasures, and targeted information that can inform policy decisions. Additionally, a model of gap acceptance was attempted but was ultimately not developed due to the small size of the dataset. However, a protocol for data reduction for a gap acceptance model was determined. This protocol can be utilized in future studies to develop a gap acceptance model that would provide additional insight into the roadway, vehicle, environmental, and driver factors that play a role in whether a driver accepts or rejects a gap.
Resumo:
Currently there are no guidelines within the Manual on Uniform Traffic Control Devices (MUTCD) on construction phasing and maintenance of traffic (MOT) for retrofit construction and maintenance projects involving innovative geometric designs. The research presented in this report addressed this gap in existing knowledge by investigating the state of the practice of construction phasing and MOT for several types of innovative geometric designs including the roundabout, single point urban interchange (SPUI), diverging diamond interchange (DDI), restricted-crossing left turn (RCUT), median U-turn (MUT), and displaced left turn (DLT). This report provides guidelines for transportation practitioners in developing construction phasing and MOT plans for innovative geometric designs. This report includes MOT Phasing Diagrams to assist in the development of MOT strategies for innovative designs. The MOT Phasing Diagrams were developed through a review of literature, survey, interviews with practitioners, and review of plans from innovative geometric design projects. These diagrams are provided as a tool to assist in improving work zone safety and mobility through construction of projects with innovative geometric designs. The aforementioned synthesis of existing knowledge documented existing practices for these types of designs.
Resumo:
The Iowa Department of Transportation, like many other state transportation agencies, is experiencing growing congestion and traffic delays in work zones on rural interstate highways. The congestion results in unproductive and wasteful delays for both motorists and commercial vehicles. It also results in hazardous conditions where vehicle stopped in queues on rural interstate highways are being approached by vehicles upstream at very high speeds. The delays also result in driver frustration, making some drivers willing to take unsafe risks in an effort to bypass delays. To reduce the safety hazards and unproductive delays of congested rural interstate work zones, the Iowa Department of Transportation would like to improve its traffic management strategies at these locations. Applying better management practices requires knowledge of the traffic flow properties and driver behavior in and around work zones, and knowledge of possible management strategies. The project reported here and in a companion report documents research which seeks to better understand traffic flow behavior at rural interstate highway work zones and to estimate the traffic carrying capacity of work zone lane closures. In addition, this document also reports on technology available to better manage traffic in and around work zones.
Resumo:
Two lanes of a major four lane arterial street needed to be reconstructed in Cedar Rapids, Iowa. The traffic volumes and difficulty of detouring the traffic necessitated closure for construction be held to an absolute minimum. Closure of the intersections, even for one day, was not politically feasible. Therefore, Fast Track and Fast Track II was specified for the project. Fast Track concrete paving has been used successfully in Iowa since 1986. The mainline portion of the project was specified to be Fast Track and achieved the opening strength of 400 psi in less than twelve hours. The intersections were allowed to be closed between 6 PM and 6 AM. This could occur twice - once to remove the old pavement and place the base and temporary surface and the second time to pave and cure the new concrete. The contractor was able to meet these restrictions. The Fast Track II used in the intersections achieved the opening strength of 350 psi in six to seven hours. Two test sections were selected in the mainline Fast Track and two intersections were chosen to test the Fast Tract II. Both flexural and compression specimens were tested. Pulse velocity tests were conducted on the pavement and test specimens. Maturity curves were developed through monitoring of the temperatures. Correlations were performed between the maturity and pulse velocity and the flexural strengths. The project was successful in establishing the feasibility of construction at night, with no disruption of traffic in the daytime, using fast Track II. Both the Fast Track II pavements were performing well four years after construction.
Resumo:
On selvää, että tänä päivänä maailmankaupan painopiste on hiljalleen siirtymässä Aasiaan ja varsinkin Kiina on ollut huomion keskipisteessä. Erityisesti valmistavien yritysten perspektiivistä muutos on ollut merkittävä ja tämä tosiasia kasvattaa yrityksissä paineita luoda kustannustehokkaita toimitusketjuratkaisuja,joiden vasteaika on mahdollisimman lyhyt. Samaan aikaan kun tarkastellaan kuljetusvirtoja, huomattaan että maanosien välillä on suuri epätasapaino. Tämä on enimmäkseen seurausta suurten globaalisti toimivien yritysten toimitusketjustrategioista. Useimmat näistä toimijoista optimoivat verkostonsa turvautumalla 'paikalliseen hankintaan', jotta he voisivat paremmin hallita toimitusketjujaan ja saada näitä reagointiherkimmiksi. Valmistusyksiköillä onkin monesti Euroopassa pakko käyttää kalliita raaka-aineita ja puolivalmisteita. Kriittisiksi tekijöiksi osoittautuvat kuljetus- ja varastointikustannukset sekä näiden seurauksena hukka-aika, joka aiheutuu viivästyksistä. Voidakseen saavuttaa optimiratkaisun, on tehtävä päätös miten tuotteet varastoidaan: keskitetysti tai hajautetusti ja integroida tämä valinta sopivien kuljetusmuotojen kanssa. Aasiasta Pohjois-Eurooppaan on halpaa käyttää merikuljetusta, mutta operaatio kestää hyvin pitkään - joissain tapauksessa jopa kahdeksan viikkoa. Toisaalta lentokuljetus on sekä kallis että rajoittaa siirrettävien tuotteiden eräkokoa.On olemassa kolmaskin vaihtoehto, josta voisi olla ratkaisuksi: rautatiekuljetus on halvempi kuin lentokuljetus ja vasteajat ovat lyhyemmät kuin merikuljetuksissa. Tässä tutkimuksessa tilannetta selvitetään kyselyllä, joka suunnattiin Suomessa ja Ruotsissa toimiville yrityksille. Tuloksien perusteella teemme johtopäätökset siitä, mitkä kuljetusmuotojen markkinaosuudet tulevat olemaan tulevaisuudessa sekä luomme kuvan kuljetusvirroista Euroopan, Venäjän, Etelä-Korea, Intian, Kiinan ja Japanin välillä. Samalla on tarkoitus ennakoida sitä, miten tarkastelun kohteena olevat yritykset aikovat kehittää kuljetuksiaan ja varastointiaan tulevien vuosien aikana. Tulosten perusteella näyttää siltä, että seuraavan viiden vuoden kuluessa kuljetuskustannukset eivät merkittävissä määrin tule muuttuman ja meri- sekä kumipyöräkuljetukset pysyvät suosituimpina vaihtoehtoina.Kuitenkin lentokuljetusten osuus laskee hiukan, kun taas rautatiekuljetusten painotus kasvaa. Tulokset paljastavat, että Kiinassa ja Venäjällä kuljetettava konttimäärä kasvaa; Intiassa tulos on saman suuntainen, joskaan ei niin voimakas. Analyysimme mukaan kuljetusvirtoihin liittyvä epätasapaino säilyy Venäjän kuljetusten suhteen: yritykset jatkavat tulevaisuudessakin vientiperusteista strategiaansa. Varastoinnin puolella tunnistamme pienemmän muutoksen, jonka mukaan pienikokoisten varastojen määrät todennäköisesti vähenevät tulevaisuudessa ja kiinnostus isoja varastoja kohtaan lisääntyy. Tässä kohtaa on mainittava, että suomalaisilla yrityksillä on enemmän varastoja Keski- ja Itä-Euroopassa verrattuna ruotsalaisiin toimijoihin, jotka keskittyvät selkeämmin Länsi-Euroopan maihin. Varastoja yrityksillä on molemmissa tapaukissa paljolti kotimaassaan. Valitessaan varastojensa sijoituskohteita yritykset painottavat seuraavia kriteereitä: alhaiset jakelukustannukset, kokoamispaikan/valmistustehtaan läheisyys, saapuvan logistiikan integroitavuus ja saatavilla olevat logistiikkapalvelut. Tutkimuksemme lopussa päädymme siihen, että varastojen sijoituspaikat eivät muutu satamien rakenteen ja liikenneyhteyksien takia kovinkaan nopeasti.
Resumo:
Selostus: Raskaan peltoliikenteen aiheuttama pitkäaikainen maan tiivistyminen