870 resultados para gerenciamento do erro
Resumo:
Activities that have fuel subterranean storage system are considered potentially polluting fuels by CONAMA Resolution 273, due to the possibility of leak, outpouring and overflow of fuel into the ground. Being even more worrying when contaminate groundwater for public supply, as the case of Natal City. For this reason, the Public Ministry/RN, in partnership with UFRN, developed the project environmental suitability of Gas stations in Natal, of which 36% showed evidence of contamination. This paper describes the four stages of the management of contaminated areas: preliminary assessment of environmental liabilities, detailed confirmatory investigation of the contamination, risk analysis to human health (RBCA), as well as the remediation plan of degraded areas. Therefore it is presented a case study. For the area investigated has been proposed a mathematical method to estimate the volume of LNAPL by a free CAD software (ScketchUp) and compare it with the partition method for grid area. Were also performed 3D graphics designs of feathers contamination. Research results showed that passive benzene contamination in groundwater was 2791.77 μg/L, when the maximum allowed by CONAMA Resolution 420 is 5 μg/L which is the potability standards. The individual and cumulative risks were calculated from 4.4 x10-3, both above the limits of 1.0 x10-5 or by RBCA 1.0 x10-6 by the Public Ministry/RN. Corrective action points that remediation of dissolved phase benzene is expected to reach a concentration of 25 μg/L, based on carcinogenic risk for ingestion of groundwater by residents residential, diverging legislation. According to the proposed model, the volume of LNAPL using the ScketchUp was 17.59 m3, while by the grid partitioning method was 14.02 m3. Because of the low recovery, the expected removal of LNAPL is 11 years, if the multiphase extraction system installed in the enterprise is not optimized
Resumo:
Este trabalho teve por objetivo estimar equações de regressão linear múltipla tendo, como variáveis explicativas, as demais características avaliadas em experimento de milho e, como variáveis principais, a diferença mínima significativa em percentagem da média (DMS%) e quadrado médio do erro (QMe), para peso de grãos. Com 610 experimentos conduzidos na Rede de Ensaios Nacionais de Competição de Cultivares de Milho, realizados entre 1986 e 1996 (522 experimentos) e em 1997 (88 experimentos), estimaram-se duas equações de regressão, com os 522 experimentos, validando estas pela análise de regressão simples entre os valores reais e os estimados pelas equações, com os 88 restantes, observando que, para a DMS% a equação não estimava o mesmo valor que a fórmula original e, para o QMe, a equação poderia ser utilizada na estimação. Com o teste de Lilliefors, verificou-se que os valores do QMe aderiam à distribuição normal padrão e foi construída uma tabela de classificação dos valores do QMe, baseada nos valores observados na análise da variância dos experimentos e nos estimados pela equação de regressão.
Resumo:
This research has aimed at studying the perception of University Hospital Onofre Lopes (HUOL) s workers on the environmental management plan of RSSS. They have been interviewed 250 workers: doctors, nurses, nursing assistants, and cleaners. It was used an exploratory and descriptive research of the type Survey, which aims at obtaining of data or information on characteristics, actions or opinions of any group of people. The questions of the questionnaire were of the kind objective", formulated in a model "scale", analyzed in according to the positioning of the interviewee. The wastes of health service have high potential for environmental impact in the activities from HUOL. Actions or environmental protective policy can improve the image of HUOL. They have been detected divergences on the rigor in application of law of ANVISA. The HUOL s workers unaware of the law of ANVISA and they have little or no knowledge about the practices of environmental control, public health and, they do not know the Environmental Management System ISO 14001. They have divergent views on the degree of importance of ISO 14001. There is not a Waste Management Plan for Health Service and / or is not disclosed for most of HUOL workers. It has not carried out audits or defined the goals and objectives. Besides, it has not been identified legal requirements, and there has not been communication about the service is performed or has been made a critical analysis and no control of documents the environmental management plan. The HUOL have not had a committee of environmental management. The direction of HUOL has not been organized courses, training and recycling of waste on environmental control of the health service. On a scale from 01 to 05, the level of aware level concerning to the waste management from health services of the workers, so is at the threshold between 01 and 02. For the reversal of this situation, the first and urgent step is the creation and institutionalization the environmental management committee of the University Hospital Onofre Lopes
Resumo:
According to great concern between the developed industrial activities and resultant impacts over the environment, an association of several factors have occurred, procedures to the efficient management of the rotation between economical development and the environment have been improved. A research in field have been realized inside building sites of companies in order to provide knowledge about the implemented and accomplish actions according to the resolution from CONAMA nº307. Trough the interview among the representations of the companies and photographic survey in loco, such as, what makes the companies implement this management, reutilization and recycling, transport and disposition. The present study had as objective: analyze the insertion of the used tools to residuals management, proposing improvements, in a way that it can be easily identified during the procedures execution in the building sites of the building companies of the city of Natal/RN. To reach the goal, in the first place a revision of the pertinent literature was performed; there for, it can be seen the relation between residues management and environment sustainability, once it happens in a continued way it may prevent the waste and reduces the risk that the activities way bring to the employees, community and environment; once found the great difficult faced with regard to labors, material, equipment, project, planning, costumer s interference, furnisher. And still, it could be verified wich materials generate greater indexes of residues in the works and the main occurrences of waste and loss. However a greater transparency is needed coming from the high administration in the commitment with the continued actions, to make it so, there must be a cultural change inside the company. There for there will be a greater productivity and quality of the under taking such as costumer s satisfaction
Resumo:
Last century Six Sigma Strategy has been the focus of study for many scientists, between the discoveries we have the importance of data process for the free of error product manufactory. So, this work focuses on data quality importance in an enterprise. For this, a descriptive-exploratory study of seventeen pharmacies of manipulations from Rio Grande do Norte was undertaken with the objective to be able to create a base structure model to classify enterprises according to their data bases. Therefore, statistical methods such as cluster and discriminant analyses were used applied to a questionnaire built for this specific study. Data collection identified four group showing strong and weak characteristics for each group and that are differentiated from each other
Resumo:
This work searches to offer a model to improve spare parts stock management for companies of urban passenger transport by bus, with the consequent progress in their maintenance management. Also known as MRO items (Maintenance, Repair and Operations), these spare parts, according their consumption and demand features, cost, criticity to operation, lead-time, quantity of suppliers, among other parameters, shouldn´t have managed their inventory like normal production items (work in process e final products), that because their features, are managed by more predictable models based, for example, in economic order quantity. In the case specifically of companies of urban passenger transport by bus, items MRO have significant importance in their assets and a bad management of these inventories can cause serious losses to company, leading it even bankrupticy business, in more severe situations which missing spare part provokes vehicles shutdown indefinitely. Given slight attention to the issue, which translates in little literature available about it when compared to that literature about normal items stocks, and due the fact that MRO items be critical to bus urban transport of passengers companies´, it is necessary, so, deepen in this theme searching to give technical and scientific subsidies to companies that work, in many times, empirically, with these so decisive inputs to their business. As a typical portfolio problem, in which there are n items, separated into critical and noncritical, while competing for the same resource, it was developed a new algorithm to aid in a better inventory management of spare parts used only in corrective maintenance (whose failures are unpredictable and random), by analyzing the cost-benefit ratio, which compares the level of service versus cost of each item. The model was tested in a company of urban passenger transport by bus from the city of Natal, who anonymously provided their real data to application in this work
Resumo:
The concern about preservation of the environment reaches different layers and sections of global society. The environmental prior quality of our planet can only be reached through changes in the attitudes taken in relation due to the waste generated by society, this also lead involving the education sector, in example of the Superior Education Institutions where the concept of ambiental management needs to gain a growing space.In the Federal University of Rio Grande do Norte, can be found the Universitary Restaurant as an example of a Food and Nutrition Unit, it is a restaurant destined to provide services to the academic comunity with the production and distribution of meals. In this operational context the work itself aims subsidies and funds to the search of as minimal generation of residues as possible, applying environmentally correct processes and practices. The work was developed in the period of September to October of 2009 in the Universitary Campus of Federal University of Rio Grande do Norte, in the Universitary Restaurant of the referred institution. The project involved all the employees of the restaurant and used like method the action survey. The produced waste was characterized, arranged according with it s nature (organic or inorganic) classificated following the NBR ISO 14004, adapted by Kinasz (2004) that adjusts the Standards to the specific reality of Food and Nutrition Services being diagnosed an expressive amount of produced waste in the Universitary Restaurant, it can be assured that a culture of wasting is very present and exists, contributing to the rise of solid residues, damaging the environment and consequently reflecting in the costs and expenses of the Unity, a known fact that characterizes and justifies the need of a promoting and active action that leads to positive reflexes in the economic and environmental area, drafting a Plan for Integrate Management of Solid Residues on the Universitary Restaurant of Federal University of Rio Grande do Norte
Resumo:
The purpose of this dissertation is to formulate guidelines for the improvement of maturity models, or the development of new ones, aiming at its application to project departments. The maturity of project management has become critical for organizations that develop projects and want to stand out in the market they serve. For this purpose, maturity models provide paths in order to guarantee that the institutionalization of project management is achieved in the best possible way. Generally, these models assess the organization, define its current situation in managing projects and propose steps to be performed in the search of more advanced levels of maturity. With the objective of contributing to the improvement of maturity models for specific cases, a bibliographical research was conducted for the preparation of a comparative analysis matrix and performed a case study for application of two maturity models (MMGP and PMMM levels 2 and 3), selected based on criteria found in the literature, in an engineering department of an oil company. The case study supported the realization of a comparative analysis of models, from which guidelines were formulated for improvement. The results showed that thedepartment is evaluated in a medium stage of maturity, recording significant progress in some dimensions assessed. They also found that the results of applying the two models are presented as complementary, although the model is highlighted by the greater depth of MMGP diagnostic, considering many variables in their levels of maturity than model PMMM (levels 2 and 3).Finally, directions have been formulated that contribute to the improvement of maturity models, taking in account the organizational environment in which this work was developed
Resumo:
The strengthening of the domestic industry in Brazil required the modernization, mechanization and expansion of salt production. Thereafter the production of sea salt started to be made in a process of continuous flow, where the product is constantly stored in yards, with daily movements in and out of salt. Thus far, the major bottleneck found in this production process is the control of production, because due to the large amount produced and variety of losses existing in the various stages of production there are not a regulated and safe way to control inventories with accuracy and speed demanded. In a typical case with a salt marsh company of Rio Grande do Norte state, salt produced is stored in two open courtyards and inventory control of salt made by carrying input / output relationship of salt in each storage yard. This work developed a conceptual model of inventory control, based on topography, adopting surveys into one of the courtyards of the company. There were 25 biweekly survey measurements over a year book to generate digital models representing the stock. For each measurement, results were compared with the values of inventory accounting provided by the salt marsh in order to identify existing losses and mark out the sales department on the actual stock available at each measurement date. Inventories calculated by the model indicated losses of 6,349 tonnes for the period of one year book and 3,279 tonnes for the period between harvests, when compared to the accounting control
Resumo:
In the current conjuncture, the environmental factor has been changing the position of companies that are practicing or minimally adopting environmental management. Such tool has been used by companies to face the problems caused by solid waste, in particular green coconut waste, which is constantly among the material discarded by society (companies/ consumer). It is a typical tropical fruit whose fresh water is very benefic for human health, and its popularization has caused a progressive increase of its consumption. Following this stream of thought, this present work came up with an analysis of strengths, weaknesses, threats, and opportunities SWOT analysis on green coconut solid waste management at two agribusiness companies in the state of Rio Grande do Norte (RN), Brazil, aiming to know the challenges and the potentials of this kind of waste. According to the approach of the problem, this work fits a descriptive, exploratory, and qualitative research. The data collection was obtained by a questionnaire and a structured interview, in order to evaluate the strategic posture of agribusiness companies through SWOT analysis, which is an English acronym for Strengths, Weaknesses, Opportunities and Threats. The SWOT analysis is an effective tool to analyze the internal and external environment of an organization. This tool contributes to locate the company at the environment in question and when well applied it enables the detection of mistakes, the strengthening of correct procedures, the avoidance of threats, and the bet on opportunities. The studied agribusiness industries have very similar profiles, such as a long business life span, and a strategy that extends the useful life of the fruit, by using its waste for the manufacturing of new subproducts. In both, the daily quantity of waste resulted of this process reaches approximately 20 thousand units of the fruit in high season, being necessary a focus directed at use and/or treatment of these waste. Further to SWOT analysis, it was ascertained that the agribusiness company A works through a defensive marketing strategy and acts vulnerably, in other words, unable of acting before this market segment, for it has decided to stop using the waste due to a lack of equipment and technology. On the other hand, the agribusiness company B has incorporated an offensive marketing strategy because even not possessing equipments, technology, and appropriated internal installations, it still insists on use and benefits of green coconut waste in its agribusiness. Thus, it is considered that the potential of green coconut waste management for the production of several subproducts reduces the impacts produced by inappropriate placement and generates profits in a short, medium and long term. Such profits being tangible and intangible, as the interest for sustainability actions is not only a matter of obtaining return on capital, but it is an important question in order to move on into business, since it is not enough to have quality on products and process nowadays. It is necessary to establish socio-environmental practices aiming the image of the company as the prevailing role on consumers buying decision
Resumo:
This dissertation conducted in the years 2011 and 2012, an analysis of cooperatives waste pickers in the city of Natal, Rio Grande do Norte, aiming to identify improvements to be implemented to assist the management of waste from the municipality as well as to improve the living conditions of the workers who perform the selective collection, the environmental perspective. This analysis was performed by means of an investigation of the reality in which they live cooperatives and their local representation, using also the law. The research is characterized as a case study of an applied nature, documentary, consultations with the institutions related to the issue of solid waste in the national and local levels; exploratory and descriptive, the main methodological tools technical visits and structured interviews. From these methods was possible to obtain data regarding the organization of cooperatives, environmental perception of the collector of recyclable materials, among other issues. For the analysis of data matrices were used to include comments and method GUT, from which it was possible to identify numerous difficulties faced by recycling cooperatives, and develop proposals for possible improvements in various aspects of their operation, such as infrastructure and production process , which can improve both the waste management and the quality of life of workers involved in the selective collection system city
Resumo:
This study developed software rotines, in a system made basically from a processor board producer of signs and supervisory, wich main function was correcting the information measured by a turbine gas meter. This correction is based on the use of an intelligent algorithm formed by an artificial neural net. The rotines were implemented in the habitat of the supervisory as well as in the habitat of the DSP and have three main itens: processing, communication and supervision
Resumo:
Nesta pesquisa estabeleceu-se como objetivo geral analisar a gestão dos resíduos sólidos domiciliares gerados nas cidades de Tarumã e Teodoro Sampaio-SP, com a finalidade de propor ações para o gerenciamento integrado dos resíduos sólidos urbanos. Foram investigados a geração, o tratamento e a destinação dos resíduos sólidos domiciliares, além daqueles gerados no processo de produção da Usina de Açúcar e Álcool Nova América, e sua participação na vida econômica da Usina de Triagem e Compostagem de Tarumã. Esta pesquisa permitiu compreender a importância de uma gestão integrada dos resíduos sólidos visando a combater e minimizar impactos ambientais associados aos mesmos, bem como enfatizar a necessidade de articular a usina de triagem de resíduos sólidos domiciliares com a coleta seletiva em Tarumã e viabilizar a coleta seletiva em Teodoro Sampaio, garantindo assim, ganhos sociais, operacionais, econômicos, educacionais e ambientais para os municípios.
Resumo:
This paperwork attempts to measure the project management maturity in the State Department of Taxation in Rio Grande do Norte. Project management has shown to be a critical component to any organization success, as the projects are directly related to a set of activities resulting into organizational innovations such as products, services and processes; and its improvement is directly aligned with the strategic management. Methodologically, this paperwork uses both a quantitative and qualitative approach that will be applied to the coordinators, sub-coordinators, and directors of the Regional Offices of the State Department of Taxation. In the theoretical reference it is about the public management and analyzes the strategic management in contemporary public administration. Presents the maturity in project management is by discussing the main models: CMM, Capability Maturity Model; PMMM, Project Management Maturity Model; OPM3, Organization Project Maturity Model and the Prado-MMGP, Modelo de Maturidade em Gerenciamento de Projetos. From this analysis, considering attributes as an aid in taking strategic positioning, access to the model, possibility of benchmarking and continuous improvement, the Prado-MMGP model was the most appropriate for this research process. It has been proved that the State Department of Taxation shows a very low project management maturity level. Regarding the acceptance of the maturity dimensions by the State Department, it is still in an early developmental stage, as one of the dimensions showed a poor performance while the rest showed a regular one. In contrast with similar organizations, the maturity results have shown to be below the national average. The maturity assessment enables in the institution the implementation of a plan for institutional growth with the creation of sector strategic and project management
Resumo:
In this work, we study the survival cure rate model proposed by Yakovlev et al. (1993), based on a competing risks structure concurring to cause the event of interest, and the approach proposed by Chen et al. (1999), where covariates are introduced to model the risk amount. We focus the measurement error covariates topics, considering the use of corrected score method in order to obtain consistent estimators. A simulation study is done to evaluate the behavior of the estimators obtained by this method for finite samples. The simulation aims to identify not only the impact on the regression coefficients of the covariates measured with error (Mizoi et al. 2007) but also on the coefficients of covariates measured without error. We also verify the adequacy of the piecewise exponential distribution to the cure rate model with measurement error. At the end, model applications involving real data are made