999 resultados para U.S. Army Environmental Hygiene Agency
Resumo:
Reuse of record except for individual research requires license from Congressional Information Service, Inc.
Resumo:
Mode of access: Internet.
Resumo:
Item 856-E
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
"EPA 231-R-98-001."
Resumo:
Mode of access: Internet.
Resumo:
At head of title <, Sept. 1972-Apr. 1973>: Foreign documents announcements.
Resumo:
Cover title.
Resumo:
Funded through a grant from the U.S. Environmental Protection Agency.
Resumo:
The approved project allows the Corps to dredge the Waukegan Harbor approach channel and advanced maintenance area. The area to be dredged lies immediately east of the north breakwater. It is approximately a rectangle 650 feet north and south and 1,400 feet east and west. The advanced maintenance area is a band along the north side of the channel. The approved project is for a 10-year certification, under which the Corps may remove 22,000 to 75,000 cubic yards of sediment per dredging event. The dredging depth is 22 feet and the amount to be dredged is about one foot of sediment. As a condition of the certification, disposal of the dredged sediment in Lake Michigan or the waters of the state cannot occur until the conditions of the certification are met. These conditions, which have been placed on the certification by Illinois EPA, ensure that the project meets state water quality standards and is consistent with the determinations of the Illinois Attorney General's Task Force on asbestos contamination at Illinois Beach State Park.
Resumo:
Caption title.
Resumo:
The potentially responsible parties (PRPs) have removed the beaver dams and have collected the sediment samples they need for treatability studies. The treatability studies will establish the correct silt fence to minimize releases of sediment during the actual dredging to occur this fall. The studies will also determine the types and amounts of materials (lime, kiln dust, fly ash, etc.) required to stabilize the sediment, chemically tie up the metals and insure the sediment mixture will bear the weight of the cap on the Interim Storage Cell where the sediment will be placed. The Illinois Environmental Protection Agency (Illinois EPA) anticipates work to be completed by late fall or early winter 2004, if lake and river levels that affect the South Ditch are at their normal seasonal levels.
Resumo:
Shipping list no.: 99-0007-P