868 resultados para Pestorius projects


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Educating responsive graduates. Graduate competencies include reliability, communication skills and ability to work in teams. Students using Collaborative technologies adapt to a new working environment, working in teams and using collaborative technologies for learning. Collaborative Technologies were used not simply for delivery of learning but innovatively to supplement and enrich research-based learning, providing a space for active engagement and interaction with resources and team. This promotes the development of responsive ‘intellectual producers’, able to effectively communicate, collaborate and negotiate in complex work environments. Exploiting technologies. Students use ‘new’ technologies to work collaboratively, allowing them to experience the reality of distributed workplaces incorporating both flexibility and ‘real’ time responsiveness. Students are responsible and accountable for individual and group work contributions in a highly transparent and readily accessible workspace. This experience provides a model of an effective learning tool. Navigating uncertainty and complexity. Collaborative technologies allows students to develop critical thinking and reflective skills as they develop a group product. In this forum students build resilience by taking ownership and managing group work, and navigating the uncertainties and complexities of group dynamics as they constructively and professionally engage in team dialogue and learn to focus on the goal of the team task.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Public private partnerships (PPPs) have been adopted widely to provide public facilities and services. According to the PPP agreement, PPP projects would be transferred to the public sector. However, problems related to the subsequent management of ongoing PPP projects have not been studied thoroughly. Residual value risk (RVR) can occur if the public sector cannot obtain the project in the desired conditions as required in the agreement when a project is being transferred. RVR has been identified as an important risk in PPPs and has greatly influenced the outputs of the projects. In order to further observe the change of residual value (RV) during the process of PPP projects and to reveal the internal mechanism for reducing the RVR, a comparative case study of two PPP projects in mainland China and Hong Kong was conducted. Based on the case study, different factors leading to RVR and a series of key risk indicators (KRIs) were identified. The comparison demonstrates that RVR is an important risk that could influence the success of PPP projects. The cumulative effects during the concession period can play significant roles in the occurrence of RVR. Additionally, the cumulative effects in different cases can make the RVR different because of different stakeholders’ efforts on the projects and ways to treat RVR. Finally, alternatives for the public sector to treat RVR were proposed. The findings of this research can reduce RVR and improve the performance of PPP projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The power of projects has been demonstrated by the growth in their use across an increasing range of industries and workplaces in recent years. Not only has the number of people involved in project management increased, but the qualifications and backgrounds of those people have also broadened, with engineering no longer being the only path to project management (PM). Predicting the career trajectories in Project Management has become more important for both organisations employing project managers and project managers building career portfolios. Our research involved interviewing more than 75 project officers and project managers across a range of industries to explore their career journey. We used Wittgenstein’s family resemblance theory is to analyse the information from the transcripts to identify the extent to which the roles of participants fit with the commonly accepted definition of project management. Findings demonstrate diversity of project manager backgrounds and experiences and relational competencies across these backgrounds that form and shape PM careers.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Public-Private Partnerships (PPP) are established globally as an important mode of procurement and the features of PPP, not least of which the transfer of risk, appeal to governments and particularly in the current economic climate. There are many other advantages of PPP that are claimed as outweighing the costs of PPP and affording Value for Money (VfM) relative to traditionally financed projects or non-PPP. That said, it is the case that we lack comparative whole-life empirical studies of VfM in PPP and non-PPP. Whilst we await this kind of study, the pace and trajectory of PPP seem set to continue and so in the meantime, the virtues of seeking to improve PPP appear incontrovertible. The decision about which projects, or parts of projects, to offer to the market as a PPP and the decision concerning the allocation or sharing risks as part of engagement of the PPP consortium are among the most fundamental decisions that determine whether PPP deliver VfM. The focus in the paper is on latter decision concerning governments’ attitudes towards risk and more specifically, the effect of this decision on the nature of the emergent PPP consortium, or PPP model, including its economic behavior and outcomes. This paper presents an exploration into the extent to which the seemingly incompatible alternatives of risk allocation and risk sharing, represented by the orthodox/conventional PPP model and the heterodox/alliance PPP model respectively, can be reconciled along with suggestions for new research directions to inform this reconciliation. In so doing, an important step is taken towards charting a path by which governments can harness the relative strengths of both kinds of PPP model.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This research was undertaken to encompass and identify challenges and impact factors that affect the successful outcomes of heritage building projects, especially those related to finding major causes of delays and cost overruns across projects in all Australian states. This project determined and analysed the causes of such delays and programme issues emanating from the planning and execution phases, whilst also analysing the requirements for management of multiple stakeholder relationships and the influence of unforeseen technical factors. The research proposes "call for action" guidance and was validated by experienced experts in heritage building projects in Australia. The proposed guidance is designed to ensure that realistic cost targets and delivery timeframes are set in future heritage projects, and necessary interventions made at appropriate project stages to ensure decisions are made that will help to prevent overtime and cost overuns.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Improving development outcomes for smallholder farmers through closer collaboration between landcare and other ACIAR projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Public private partnerships (PPP) are widely used for construction project procurement. However, the briefing stage of PPP projects has been largely overlooked, although it has a far-reaching influence throughout the project life cycle. In response, we rectify this by exploring the critical factors involved. A set of 15 procurement-related factors are first identified from the existing literature. Then the effects of four background variables on the factors are tested with Hong Kong government data by an exploratory factor analysis extracting four major dimensions. The relationships between these dimensions and background variables indicate the need to take the background variables into account when ranking the factors. The ranking of the factors is then obtained by considering their weighted importance. Finally, the final practical value of the results is discussed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Project evaluation is a process of measuring costs, benefits, risks and uncertainties for the purpose of decision-making by estimating and assessing impacts of the project to the community. The effects of impacts of toll roads are similar but different from the general non-tolled roads. Project evaluation methodologies are extensively studied and applied to various transport infrastructure projects. However, there is no definitive methodology to evaluate toll roads. This review discusses the impacts of toll roads then reviews the limitations of existing project evaluation methodologies when evaluating toll road impacts. The review identified gaps of knowledge of toll evaluations. First, the treatment of toll in project evaluation, particularly in Cost-Benefit Analysis requires further study to explore the appropriate methodology. Secondly, the project evaluation methodology needs to place strong emphasis on empirically based risk and uncertainty assessment. Addressing the limitations of the existing project evaluation methodologies leads to improvements of the methodology in practical level as well as fills the gap of knowledge of project evaluation for toll roads with respect to net impacts to the community.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Project evaluation is a process of measuring costs, benefits, risks and uncertainties for the purpose of decision-making by estimating and assessing impacts of the project to the community. The effects of impacts of toll roads are similar but different from the general non-tolled roads. Project evaluation methodologies are extensively studied and applied to various transport infrastructure projects. However, there is no definitive methodology to evaluate toll roads. This review discusses the impacts of toll roads then reviews the limitations of existing project evaluation methodologies when evaluating toll road impacts. The review identified gaps of knowledge of toll evaluations. First, the treatment of toll in project evaluation, particularly in Cost-Benefit Analysis requires further study to explore the appropriate methodology. Secondly, the project evaluation methodology needs to place strong emphasis on empirically based risk and uncertainty assessment. Addressing the limitations of the existing project evaluation methodologies leads to improvements of the methodology in practical level as well as fills the gap of knowledge of project evaluation for toll roads with respect to net impacts to the community.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Free and Open Source Software (FOSS) has gained increased interest in the computer software industry, but assessing its quality remains a challenge. FOSS development is frequently carried out by globally distributed development teams, and all stages of development are publicly visible. Several product and process-level quality factors can be measured using the public data. This thesis presents a theoretical background for software quality and metrics and their application in a FOSS environment. Information available from FOSS projects in three information spaces are presented, and a quality model suitable for use in a FOSS context is constructed. The model includes both process and product quality metrics, and takes into account the tools and working methods commonly used in FOSS projects. A subset of the constructed quality model is applied to three FOSS projects, highlighting both theoretical and practical concerns in implementing automatic metric collection and analysis. The experiment shows that useful quality information can be extracted from the vast amount of data available. In particular, projects vary in their growth rate, complexity, modularity and team structure.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Major infrastructure and construction (MIC) projects are those with significant traffic or environmental impact, of strategic and regional significance and high sensitivity. The decision making process of schemes of this type is becoming ever more complicated, especially with the increasing number of stakeholders involved and their growing tendency to defend their own varied interests. Failing to address and meet the concerns and expectations of stakeholders may result in project failures. To avoid this necessitates a systematic participatory approach to facilitate decision-making. Though numerous decision models have been established in previous studies (e.g. ELECTRE methods, the analytic hierarchy process and analytic network process) their applicability in the decision process during stakeholder participation in contemporary MIC projects is still uncertain. To resolve this, the decision rule approach is employed for modeling multi-stakeholder multi-objective project decisions. Through this, the result is obtained naturally according to the “rules” accepted by any stakeholder involved. In this sense, consensus is more likely to be achieved since the process is more convincing and the result is easier to be accepted by all concerned. Appropriate “rules”, comprehensive enough to address multiple objectives while straightforward enough to be understood by multiple stakeholders, are set for resolving conflict and facilitating consensus during the project decision process. The West Kowloon Cultural District (WKCD) project is used as a demonstration case and a focus group meeting is conducted in order to confirm the validity of the model established. The results indicate that the model is objective, reliable and practical enough to cope with real world problems. Finally, a suggested future research agenda is provided.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The concession agreement is the core feature of BOT projects, with the concession period being the most essential feature in determining the time span of the various rights, obligations and responsibilities of the government and concessionaire. Concession period design is therefore crucial for financial viability and determining the benefit/cost allocation between the host government and the concessionaire. However, while the concession period and project life span are essentially interdependent, most methods to date consider their determination as contiguous events that are determined exogenously. Moreover, these methods seldom consider the, often uncertain, social benefits and costs involved that are critical in defining, pricing and distributing benefits and costs between the various parties and evaluating potentially distributable cash flows. In this paper, we present the results of the first stage of a research project aimed at determining the optimal build-operate-transfer (BOT) project life span and concession period endogenously and interdependently by maximizing the combined benefits of stakeholders. Based on the estimation of the economic and social development involved, a negotiation space of the concession period interval is obtained, with its lower boundary creating the desired financial return for the private investors and its upper boundary ensuring the economic feasibility of the host government as well as the maximized welfare within the project life. The outcome of the new quantitative model is considered as a suitable basis for future field trials prior to implementation. The structure and details of the model are provided in the paper with Hong Kong tunnel project as a case study to demonstrate its detailed application. The basic contributions of the paper to the theory of construction procurement are that the project life span and concession period are determined jointly and the social benefits taken into account in the examination of project financial benefits. In practical terms, the model goes beyond the current practice of linear-process thinking and should enable engineering consultants to provide project information more rationally and accurately to BOT project bidders and increase the government's prospects of successfully entering into a contract with a concessionaire. This is expected to generate more negotiation space for the government and concessionaire in determining the major socioeconomic features of individual BOT contracts when negotiating the concession period. As a result, the use of the model should increase the total benefit to both parties.