962 resultados para wind power plants
Resumo:
Wind speed forecasting has been becoming an important field of research to support the electricity industry mainly due to the increasing use of distributed energy sources, largely based on renewable sources. This type of electricity generation is highly dependent on the weather conditions variability, particularly the variability of the wind speed. Therefore, accurate wind power forecasting models are required to the operation and planning of wind plants and power systems. A Support Vector Machines (SVM) model for short-term wind speed is proposed and its performance is evaluated and compared with several artificial neural network (ANN) based approaches. A case study based on a real database regarding 3 years for predicting wind speed at 5 minutes intervals is presented.
Resumo:
The application of VSC-HVDC technology throughout the world has turned out to be an efficient solution regarding a large share of wind power in different power systems. This technology enhances the overall reliability of the grid by utilization of the active and reactive power control schemes which allows to maintain frequency and voltage on busbars of the end-consumers at the required level stated by the network operator. This master’s thesis is focused on the existing and planned wind farms as well as electric power system of the Åland Islands. The goal is to analyze the wind conditions of the islands and appropriately predict a possible production of the existing and planned wind farms with a help of WAsP software program. Further, to investigate the influence of increased wind power it is necessary to develop a simulation model of the electric grid and VSC-HVDC system in PSCAD and examine grid response to different wind power production cases with respect to the grid code requirements and ensure the stability of the power system.
Singular value analyses of voltage stability on power system considering wind generation variability
Resumo:
Pós-graduação em Engenharia Elétrica - FEIS
Resumo:
In the wake of current global image involving environmental impacts, the use of wind power has had a remarkable growth in recent years as a technique for generating electricity. In fact, it is a source featuring strong dissemination of technology which provides decrease in costs and a greater access to low-income electricity. PROINFA (Incentive Program for Alternative Energy Sources) promotes a greater diffusion of new technologies for power generation, in particular wind-produced. Due to such a scenario on the exploitation of such energy source, current analysis discusses strategies for the development of domestic wind technology and the implications for electricity-lacking rural areas. Analysis shows a similar behavior between rural populations lacking electricity and the amount of potential energy available in the region. It is expected that this assay will contribute towards the establishment of public policies for wind-energy parks on rural farms in the North and Northeast regions of Brazil.
Resumo:
Wind power based generation has been rapidly growing world-wide during the recent past. In order to transmit large amounts of wind power over long distances, system planners may often add series compensation to existing transmission lines owing to several benefits such as improved steady-state power transfer limit, improved transient stability, and efficient utilization of transmission infrastructure. Application of series capacitors has posed resonant interaction concerns such as through subsynchronous resonance (SSR) with conventional turbine-generators. Wind turbine-generators may also be susceptible to such resonant interactions. However, not much information is available in literature and even engineering standards are yet to address these issues. The motivation problem for this research is based on an actual system switching event that resulted in undamped oscillations in a 345-kV series-compensated, typical ring-bus power system configuration. Based on time-domain ATP (Alternative Transients Program) modeling, simulations and analysis of system event records, the occurrence of subsynchronous interactions within the existing 345-kV series-compensated power system has been investigated. Effects of various small-signal and large-signal power system disturbances with both identical and non-identical wind turbine parameters (such as with a statistical-spread) has been evaluated. Effect of parameter variations on subsynchronous oscillations has been quantified using 3D-DFT plots and the oscillations have been identified as due to electrical self-excitation effects, rather than torsional interaction. Further, the generator no-load reactance and the rotor-side converter inner-loop controller gains have been identified as bearing maximum sensitivity to either damping or exacerbating the self-excited oscillations. A higher-order spectral analysis method based on modified Prony estimation has been successfully applied to the field records identifying dominant 9.79 Hz subsynchronous oscillations. Recommendations have been made for exploring countermeasures.
Resumo:
El sector energético, en España en particular, y de forma similar en los principales países de Europa, cuenta con una significativa sobrecapacidad de generación, debido al rápido y significativo crecimiento de las energías renovables en los últimos diez años y la reducción de la demanda energética, como consecuencia de la crisis económica. Esta situación ha hecho que las centrales térmicas de generación de electricidad, y en concreto los ciclos combinados de gas, operen con un factor de utilización extremadamente bajo, del orden del 10%. Además de la reducción de ingresos, esto supone para las plantas trabajar continuamente fuera del punto de diseño, provocando una significativa pérdida de rendimiento y mayores costes de explotación. En este escenario, cualquier contribución que ayude a mejorar la eficiencia y la condición de los equipos, es positivamente considerada. La gestión de activos está ganando relevancia como un proceso multidisciplinar e integrado, tal y como refleja la reciente publicación de las normas ISO 55000:2014. Como proceso global e integrado, la gestión de activos requiere el manejo de diversos procesos y grandes volúmenes de información, incluso en tiempo real. Para ello es necesario utilizar tecnologías de la información y aplicaciones de software. Esta tesis desarrolla un concepto integrado de gestión de activos (Integrated Plant Management – IPM) aplicado a centrales de ciclo combinado y una metodología para estimar el beneficio aportado por el mismo. Debido a las incertidumbres asociadas a la estimación del beneficio, se ha optado por un análisis probabilístico coste-beneficio. Así mismo, el análisis cuantitativo se ha completado con una validación cualitativa del beneficio aportado por las tecnologías incorporadas al concepto de gestión integrada de activos, mediante una entrevista realizada a expertos del sector de generación de energía. Los resultados del análisis coste-beneficio son positivos, incluso en el desfavorable escenario con un factor de utilización de sólo el 10% y muy prometedores para factores de utilización por encima del 30%. ABSTRACT The energy sector particularly in Spain, and in a similar way in Europe, has a significant overcapacity due to the big growth of the renewable energies in the last ten years, and it is seriously affected by the demand decrease due to the economic crisis. That situation has forced the thermal plants and in particular, the combined cycles to operate with extremely low annual average capacity factors, very close to 10%. Apart from the incomes reduction, working in out-of-design conditions, means getting a worse performance and higher costs than expected. In this scenario, anything that can be done to improve the efficiency and the equipment condition is positively received. Asset Management, as a multidisciplinary and integrated process, is gaining prominence, reflected in the recent publication of the ISO 55000 series in 2014. Dealing Asset Management as a global, integrated process needs to manage several processes and significant volumes of information, also in real time, that requires information technologies and software applications to support it. This thesis proposes an integrated asset management concept (Integrated Plant Management-IPM) applied to combined cycle power plants and develops a methodology to assess the benefit that it can provide. Due to the difficulties in getting deterministic benefit estimation, a statistical approach has been adopted for the cot-benefit analysis. As well, the quantitative analysis has been completed with a qualitative validation of the technologies included in the IPM and their contribution to key power plant challenges by power generation sector experts. The cost- benefit analysis provides positive results even in the negative scenario of annual average capacity factor close to 10% and is promising for capacity factors over 30%.
Resumo:
Although maximum power point tracking (MPPT) is crucial in the design of a wind power generation system, the necessary control strategies should also be considered for conditions that require a power reduction, called de-loading in this paper. A coordinated control scheme for a proposed current source converter (CSC) based DC wind energy conversion system is presented in this paper. This scheme combines coordinated control of the pitch angle, a DC load dumping chopper and the DC/DC converter, to quickly achieve wind farm de-loading. MATLAB/Simulink simulations and experiments are used to validate the purpose and effectiveness of the control scheme, both at the same power level. © 2013 IEEE.
Resumo:
Large scale wind power generation complicated with restrictions on the tie line plans may lead to significant wind power curtailment and deep cycling of coal units during the valley load periods. This study proposes a dispatch strategy for interconnected wind-coal intensive power systems (WCISs). Wind power curtailment and cycling of coal units are included in the economic dispatch analysis of regional systems. Based on the day-ahead dispatch results, a tie line power plan adjustment strategy is implemented in the event of wind power curtailment or deep cycling occurring in the economic dispatch model, with the objective of reducing such effects. The dispatch strategy is designed based on the distinctive operation characteristics of interconnected WCISs, and dispatch results for regional systems in China show that the proposed strategy is feasible and can improve the overall system operation performance.
Resumo:
In the last 15 years, the use of doubly fed induction machines in modern variable-speed wind turbines has increased rapidly. This development has been driven by the cost reduction as well as the low-loss generation of Insulated Gate Bipolar Transistors (IGBT). According to new grid code requirements, wind turbines must remain connected to the grid during grid disturbances. Moreover, they must also contribute to voltage support during and after grid faults. The crowbar system is essential to avoid the disconnection of the doubly fed induction wind generators from the network during faults. The insertion of the crowbar in the rotor circuits for a short period of time enables a more efficient terminal voltage control. As a general rule, the activation and the deactivation of the crowbar system is based only on the DC-link voltage level of the back-to-back converters. In this context, the authors discuss the critical rotor speed to analyze the instability of doubly fed induction generators during grid faults.
Resumo:
The proposed method to analyze the composition of the cost of electricity is based on the energy conversion processes and the destruction of the exergy through the several thermodynamic processes that comprise a combined cycle power plant. The method uses thermoeconomics to evaluate and allocate the cost of exergy throughout the processes, considering costs related to inputs and investment in equipment. Although the concept may be applied to any combined cycle or cogeneration plant, this work develops only the mathematical modeling for three-pressure heat recovery steam generator (HRSG) configurations and total condensation of the produced steam. It is possible to study any n x 1 plant configuration (n sets of gas turbine and HRSGs associated to one steam turbine generator and condenser) with the developed model, assuming that every train operates identically and in steady state. The presented model was conceived from a complex configuration of a real power plant, over which variations may be applied in order to adapt it to a defined configuration under study [Borelli SJS. Method for the analysis of the composition of electricity costs in combined cycle thermoelectric power plants. Master in Energy Dissertation, Interdisciplinary Program of Energy, Institute of Eletro-technical and Energy, University of Sao Paulo, Sao Paulo, Brazil, 2005 (in Portuguese)]. The variations and adaptations include, for instance, use of reheat, supplementary firing and partial load operation. It is also possible to undertake sensitivity analysis on geometrical equipment parameters. (C) 2007 Elsevier Ltd. All rights reserved.
Resumo:
This study presents a decision-making method for maintenance policy selection of power plants equipment. The method is based on risk analysis concepts. The method first step consists in identifying critical equipment both for power plant operational performance and availability based on risk concepts. The second step involves the proposal of a potential maintenance policy that could be applied to critical equipment in order to increase its availability. The costs associated with each potential maintenance policy must be estimated, including the maintenance costs and the cost of failure that measures the critical equipment failure consequences for the power plant operation. Once the failure probabilities and the costs of failures are estimated, a decision-making procedure is applied to select the best maintenance policy. The decision criterion is to minimize the equipment cost of failure, considering the costs and likelihood of occurrence of failure scenarios. The method is applied to the analysis of a lubrication oil system used in gas turbines journal bearings. The turbine has more than 150 MW nominal output, installed in an open cycle thermoelectric power plant. A design modification with the installation of a redundant oil pump is proposed for lubricating oil system availability improvement. (C) 2009 Elsevier Ltd. All rights reserved.
Resumo:
The blending of coals has become popular to improve the performance of coals, to meet specifications of power plants and, to reduce the cost of coals, This article reviews the results and provides new information on ignition, flame stability, and carbon burnout studies of blended coals. The reviewed studies were conducted in laboratory-, pilot-, and full-scale facilities. The new information was taken in pilot-scale studies. The results generally show that blending a high-volatile coal with a low-volatile coal or anthracite can improve the ignition, flame stability and burnout of the blends. This paper discusses two general methods to predict the performance of blended coals: (1) experiment; and (2) indices. Laboratory- and pilot-scale tests, at least, provide a relative ranking of the combustion performance of coal/blends in power station boilers. Several indices, volatile matter content, heating value and a maceral index, can be used to predict the relative ranking of ignitability and flame stability of coals and blends. The maceral index, fuel ratio, and vitrinite reflectance can also be used to predict the absolute carbon burnout of coal and blends within limits. (C) 2000 Elsevier Science Ltd. All rights reserved.
Resumo:
In this paper, the development of bidding strategies is investigated for a wind farm owner. The optimization model is characterized by making the analysis of scenarios. The proposed approach allows evaluating alternative production strategies in order to submit bids to the electricity market with the goal of maximizing profits. The problem is formulated as a linear programming problem. An application to a case study is presented
Resumo:
A área de comercialização de energia eléctrica conheceu uma profunda mudança após a liberalização do sector eléctrico, que levou à criação de algumas entidades, as quais gerem os mercados de electricidade europeus. Relativamente a Portugal e Espanha, durante esse processo de liberalização, deu-se também um acordo que os levou à criação de um mercado conjunto, um mercado Ibérico (MIBEL). Dentro deste mercado estão contemplados dois operadores, sendo que um deles representa o pólo Português (OMIP) e o outro representa o pólo Espanhol (OMEL). O OMIP contempla os mercados a prazo, ou futuros, normalmente apresenta contratos de energia comercializada com durabilidade de semanas, meses, trimestres, semestres ou mesmo anos. Diariamente estes contratos poderão vencer no OMEL, que engloba os mercados, diário e intradiário. Este, ao contrário do OMIP negoceia para o dia seguinte (mercado diário) ou para uma determinada altura do dia (mercado intra diário). O mercado diário será o exemplo usado para a criação do simulador interactivo do mercado de energia eléctrica. Este será composto por diversos utilizadores (jogadores), que através de uma plataforma HTML irão investir em centrais de energia eléctrica, negociar licitações e analisar o funcionamento e resultados deste mercado. Este jogo subdividir-se-á então em 3 fases: 1. Fase de investimento; 2. Fase de venda (licitações); 3. Fase de mercado. Na fase do investimento, o jogador terá a possibilidade de adquirir unidades de geração de energia eléctrica de seis tipos de tecnologia: 1. Central a Carvão; 2. Central de Ciclo Combinado; 3. Central Hídrica; 4. Central Eólica; 5. Central Solar; 6. Central Nuclear. Com o decorrer das jogadas o jogador poderá aumentar a sua capacidade de investimento, com a venda de energia, sendo o vencedor aquele que mais saldo tiver no fim do número de jogadas previamente definidos, ou aquele que mais depressa atingir o saldo definido como limite pelo administrador do jogo. A nível pedagógico este simulador é muito interessante pois para além de o utilizador ficar a conhecer as tecnologias em causa e as vantagens e desvantagens das centrais de energia renovável e das centrais a combustíveis fósseis, este ganha igualmente uma sensibilidade para questões de nível ambiental, tais como o aumento dos gases de estufa e o degelo resultante do aquecimento global provocado por esses gases. Para além do conhecimento adquirido na parte de energia eléctrica este jogo dará a conhecer ao utilizador o funcionamento do mercado da energia eléctrica, bem como as tácticas que este poderá usar a seu favor neste tipo de mercado.