Optimal generation scheduling of interconnected wind-coal intensive power systems


Autoria(s): Wang, Songyan; Yu, Daren; Yu, Jilai; Zhang, Wei; Foley, Aoife; Li, Kang
Data(s)

17/06/2016

Resumo

Large scale wind power generation complicated with restrictions on the tie line plans may lead to significant wind power curtailment and deep cycling of coal units during the valley load periods. This study proposes a dispatch strategy for interconnected wind-coal intensive power systems (WCISs). Wind power curtailment and cycling of coal units are included in the economic dispatch analysis of regional systems. Based on the day-ahead dispatch results, a tie line power plan adjustment strategy is implemented in the event of wind power curtailment or deep cycling occurring in the economic dispatch model, with the objective of reducing such effects. The dispatch strategy is designed based on the distinctive operation characteristics of interconnected WCISs, and dispatch results for regional systems in China show that the proposed strategy is feasible and can improve the overall system operation performance.

Formato

application/pdf

Identificador

http://pure.qub.ac.uk/portal/en/publications/optimal-generation-scheduling-of-interconnected-windcoal-intensive-power-systems(09ae517f-ee54-4397-a139-ca93b3d60e93).html

http://dx.doi.org/10.1049/iet-gtd.2016.0086

http://pure.qub.ac.uk/ws/files/101777870/manu0429_kl.pdf

Idioma(s)

eng

Direitos

info:eu-repo/semantics/openAccess

Fonte

Wang , S , Yu , D , Yu , J , Zhang , W , Foley , A & Li , K 2016 , ' Optimal generation scheduling of interconnected wind-coal intensive power systems ' IET Generation, Transmission and Distribution . DOI: 10.1049/iet-gtd.2016.0086

Palavras-Chave #wind power, interconnections, generation scheduling, coal cycling, wind-coal intensive system
Tipo

article