913 resultados para high-intensity exercise


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Outline: • Introduction • Process Experimental Setup • Experimental Procedure • Experimental Results for Al2024-T351 and Ti6Al4V - Residual stresses - Tensile Strength - Fatigue Life • Discussion and Outlook - Prospects for technological applications of LSP

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The interaction of high intensity X-ray lasers with matter is modeled. A collisional-radiative timedependent module is implemented to study radiation transport in matter from ultrashort and ultraintense X-ray bursts. Inverse bremsstrahlung absorption by free electrons, electron conduction or hydrodynamic effects are not considered. The collisional-radiative system is coupled with the electron distribution evolution treated with a Fokker-Planck approach with additional inelastic terms. The model includes spontaneous emission, resonant photoabsorption, collisional excitation and de-excitation, radiative recombination, photoionization, collisional ionization, three-body recombination, autoionization and dielectronic capture. It is found that for high densities, but still below solid, collisions play an important role and thermalization times are not short enough to ensure a thermal electron distribution. At these densities Maxwellian and non-Maxwellian electron distribution models yield substantial differences in collisional rates, modifying the atomic population dynamics.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

High Intensity Lasers Application to Advanced Materials Processing: Laser Peening and Related

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In the work, the results of an investigation of GaInP/GaInAs/Ge MJ SCs intended for converting concentrated solar radiation, when operating at low temperatures (down to -190 degrees C) are presented. A kink of the cell I-V characteristic has been observed in the region close to V-oc starting from -20 degrees C at operation under concentrated sunlight. The causes for its occurrence have been analyzed and the reasons for formation of a built-in potential barrier for majority charge carriers at the n-GaInP/n-Ge isotype hetero-interface are discussed. The effect of charge carrier transport in n-GaInP/n-p Ge heterostructures on MJ SC output characteristics at low temperatures has been studied including EL technique.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Trata de una conferencia invitada que ganó premio a la mejor comunicación científica.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

CPV receivers are made of materials with very different lineal expansion coefficients. Strong variations in DNI due to the passage of clouds can cause sudden temperature changes that creates mechanical stress. For common solder and metal filled polymers the plastic limit could be reached causing substantial fatigue. The best forecast of receiver reliability is therefore achieved by applying an intermittent light source with nominal irradiance level and a number of cycles equal to the expected cloud passages for a given site. The UPM has developed specialized equipment, dubbed the LYSS (Light cYcling Stressing Source), for carrying out such experiments. The small thermal capacity of receivers allows simulating more than 25000 cycles per week. The number of deep transients expected for Madrid in 30 years operation, based on available data, is about 45000. We are currently using the system to cycle a ?Ge/Ag Epoxy/aluminum? receiver, which shows no degradation after 20000 cycles. The equipment can cast up to 200 and 70 W/cm2 on 0.1 and 1 cm2 cells, respectively.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

After construction of the LYSS (Light cYcling Stressing Source) in early 2014, several CPV receivers, with and without secondary optical element (SOE) have been aged under fast transient illumination cycling,. The test plan for Madrid consisted of 50000 cycles. Receivers with poor heat spreaders showed low reliability but those with thicker metal layers passed the test well. The operation of LYSS along 8 months, after more than 250000 cycles, did not show any significant failure, except lamp reposition every 120 hours, in average. The equipment seems valid for unveiling weak receiver designs with respect to intensive illumination, in steady and transient modes.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"AEC Contract AT(04-3)-400."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"Project NR 140-069. Contract NONR-1151 (01)."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.