865 resultados para Watershed projects
Resumo:
Formal incentives systems aim to encourage improved performance by offering a reward for the achievement of project-specific goals. Despite argued benefits of incentive systems on project delivery outcomes, there remains debate over how incentive systems can be designed to encourage the formation of strong project relationships within a complex social system such as an infrastructure project. This challenge is compounded by the increasing emphasis in construction management research on the important mediating influence of technical and organisational context on project performance. In light of this challenge, the research presented in this paper focuses on the design of incentive systems in four infrastructure projects: two road reconstructions in the Netherlands and two building constructions in Australia. Based on a motivational theory frame, a cross case analysis is conducted to examine differences and similarities across social and cultural drivers impacting on the effectiveness of the incentive systems in light of infrastructure project context. Despite significant differences in case project characteristics, results indicate the projects’ experience similar social drivers impacting on incentive effectiveness. Significant value across the projects was placed on: varied performance goals and multiple opportunities to across the project team to pursue incentive rewards; fair risk allocation across contract parties; value-driven tender selection; improved design-build integration; and promotion of future work opportunities. However, differences across the contexts were identified. Results suggest future work opportunities were a more powerful social driver in upholding reputation and establishing strong project relationships in the Australian context. On the other hand, the relationship initiatives in the Dutch context seemed to be more broadly embraced resulting in a greater willingness to collaboratively manage project risk. Although there are limitations with this research in drawing generalizations across two sets of case projects, the results provide a strong base to explore the social and cultural influences on incentive effectiveness across different geographical and contextual boundaries in future research.
Resumo:
In Australia, collaborative contracts have been increasingly used to govern infrastructure projects. These contracts combine formal and informal mechanisms to manage project delivery. Formal mechanisms (e.g. financial risk sharing) are specified in the contract, while informal mechanisms (e.g. integrated team) are not. The paper reports on a literature review to operationalise the concepts of formal and informal governance, as the literature contains a multiplicity of, often un-testable, definitions. This work is the first phase of a study that will examine the optimal balance of formal and informal governance structures. Desk-top review of leading journals in the areas of construction management and business management, as well as recent government documents and industry guidelines, was undertaken to to conceptualise and operatinalise formal and informal governance mechanisms. The study primarily draws on transaction-cost economics (e.g. Williamson 1979; 1991), relational contract theory (Feinman 2000; Macneil 2000) and social psychology theory (e.g. Gulati 1995). Content analysis of the literature was undertaken to identify key governance mechanisms. Content analysis is a commonly used methodology in the social sciences area. It provides rich data through the systematic and objective review of literature (Krippendorff 2004). NVivo 9, a qualitative data analysis software package, was used to assist in this process. Formal governance mechanisms were found to be usefully broken down into four measurable categories: (1) target cost arrangement (2) financial risk and reward sharing regime (3) transparent financials and (4) collaborative multi-party agreement Informal governance mechanisms were found to be usefully broken down into three measurable categories: (1) leadership structure (2) integrated team (3) joint management system We expect these categories to effectively capture the key governance drivers of outcomes on infrastructure projects. These categories will be further refined and broken down into individual governance mechanisms for assessment through a large-scale Australian survey planned for late 2012. These individual mechanisms will feature in the questionnaire that QUT will deliver to AAA in October 2012.
Resumo:
Bushfire Responsive Architecture proposals (2) detailed in a 144 page document containing orginal architectural designs and site surveys by Dr Ian Weir. Presented in support of Dr Weir's sucessful planning application for the perminant artwork/land art project "Lightsite Perminant" situated on Point Henry, Western Australia.
Resumo:
The continuous changing impacts appeared in all solution understanding approaches in the projects management field (especially in the construction field of work) by adopting dynamic solution paths. The paper will define what argue to be a better relational model for project management constraints (time, cost, and scope). This new model will increase the success factors of any complex program / project. This is a qualitative research adopting a new avenue of investigation by following different approach of attributing project activities with social phenomena, and supporting phenomenon with field of observations rather than mathematical method by emerging solution from human, and ants' colonies successful practices. The results will show the correct approach of relation between the triple constraints considering the relation as multi agents system having specified communication channels based on agents locations. Information will be transferred between agents, and action would be taken based on constraint agents locations in the project structure allowing immediate changes abilities in order to overcome issues of over budget, behind schedule, and additional scope impact. This is complex adaptive system having self organizes technique, and cybernetic control. Resulted model can be used for improving existing project management methodologies.
Resumo:
Corruption has been identified as the greatest obstacle to economic and social development. Public construction projects, in particular, face high corruption risk as public construction sector has been consecutively deemed as the most corrupt one. Despite considerable efforts have been undertaken to measure corruption at a nation level, few focus on the measurement of corruption in construction projects. This paper develops a fuzzy measurement model for the potential corruption in public construction projects in China. Through semi-structured interviews with 14 experts, followed by a questionnaire survey with 188 respondents, 24 measurement items of corruption were identified and further categorized into five constructs. The fuzzy set theory was then adopted to quantify each measurement item, construct and the overall corruption level. This model can facilitate in evaluating, revealing and monitoring corruption in public construction projects. Although this study focuses on measuring corruption in public construction projects in China, similar research methods can be applied in other countries around the world and thus contribute to the global body of knowledge of corruption.
Resumo:
This paper aims to provide a contextualised and embedded exploration of how the notions of "practice" and "participation", key concepts in the study of culture and media, are manifest in an example of a complex creative project. This project aimed to engage with refugees and asylum seekers through the co-creation of cultural material and is an outcome of an? ethnographic action research (Tacchi et al. 2003) partnership involving a community development worker in a settlement support agency and a storytelling/community media researcher (the author), along with other project collaborators. The discussion of this project focuses on the role of the facilitator and illustrates the processes of orchestrating a complex project involving a series of linked stages with cumulative effect. As practitioners at this site we are working in the space where personal narratives, participatory arts and media, and the staging of intercultural, civic dialogue events, intersect. Co-creative media facilitation in these contexts involves both managing hybrid communicative spaces and (re)combining the "integrative practices" (Schatzki 1996) of a range of professional approaches and creative roles. This is liminal work, located on the boundaries of several disciplines and practices. Drawing on reflections gathered from collaborative ethnographic descriptions (Bhattacharya 2008), this paper traces moments of practitioner uncertainty that can be linked to the way "practice" and “participation” is problematised within the community cultural development field in a way that is at times an uneasy fit with conventional ways of operating in social service roles. These moments of tension also indicate where this project pushed practitioners into spaces of improvisation and new learning. Keywords: Youth, refugees, community cultural development, co-creative media facilitation, ethnographic action research, intercultural dialogue.
Resumo:
Organizational and technological systems analysis and design practices such as process modeling have received much attention in recent years. However, while knowledge about related artifacts such as models, tools, or grammars has substantially matured, little is known about the actual tasks and interaction activities that are conducted as part of analysis and design acts. In particular, key role of the facilitator has not been researched extensively to date. In this paper, we propose a new conceptual framework that can be used to examine facilitation behaviors in process modeling projects. The framework distinguishes four behavioral styles in facilitation (the driving engineer, the driving artist, the catalyzing engineer, and the catalyzing artist) that a facilitator can adopt. To distinguish between the four styles, we provide a set of ten behavioral anchors that underpin facilitation behaviors. We also report on a preliminary empirical exploration of our framework through interviews with experienced analysts in six modeling cases. Our research provides a conceptual foundation for an emerging theory for describing and explaining different behaviors associated with process modeling facilitation, provides first preliminary empirical results about facilitation in modeling projects, and provides a fertile basis for examining facilitation in other conceptual modeling activities.
Resumo:
The objective of this paper is to develop insights into firms’ strategic capability development processes within product innovation projects. In particular, the research aims at investigating the interactions among product innovation, knowledge processes, and capability development within firms. Building on qualitative data from the auto-industry, our analysis reveals that across four product innovation projects, the case company developed architectural knowledge and capability. Findings reveal that, along with changes at each level of product architecture, “design knowledge” and “design capability” have been developed at the same level of product architecture, leading to capability development at that level. Furthermore, findings suggest that such capability transformation resulting from knowledge and capability creation over the course of case projects leads to modularization of product architecture. Overall, the research contributes to identifying and emphasizing the role of micro processes in capability development and renewal, which in turn enhances our understanding of strategic capability development processes.
Resumo:
Purpose of this paper One way in which the tendering process can be further improved is by reviewing and clarifying the high costs that participants face during the course of the tendering phase. The study aims to provide project teams working in construction tender preparation a clear picture of what to expect when tendering for infrastructure projects. Design/methodology/approach Firstly, a review of current literature on tendering in infrastructure projects is conducted to identify the associated costs affecting traditional and PPP procurements as well as the potential measures contributing to tendering cost-reduction. A theoretical framework and its corresponding research hypotheses, which are based on the literature reviewed, are then proposed. An industry-wide questionnaire survey is currently under design to solicit industry practitioners’ views on tendering costs and the associated tendering cost-reduction measures. The data collected in the survey will subject to statistical analysis to test the proposed research hypotheses, which will be reported in a forthcoming paper. Findings and value The direct and indirect costs in public-private procurement have been identified and have been categorised into internal and external costs arising from working on tender submissions. A theoretical framework, mainly composed of five mechanisms of cost reduction, has been proposed and will be tested in a forthcoming industry-wide questionnaire survey. Originality/value of paper The findings are expected to lead to a transparent tendering process in infrastructure procurement, in which there is increased engagement from the private sector as well as an increase in competitive tendering.
Resumo:
For design-build (DB) projects, owners normally use lump sum and Guaranteed Maximum Price (GMP) as the major contract payment provisions. However, there was a lack of empirical studies to compare the project performance within different contract types and investigate how different project characteristics affect the owners’ selection of contract arrangement. Project information from Design-build Institute of America (DBIA) database was collected to reveal the statistical relationship between different project characteristics and contract types and to compare project performance between lump sum and GMP contract. The results show that lump sum is still the most frequently used contract method for DB projects, especially in the public sector. However, projects using GMP contract are more likely to have less schedule delay and cost overrun as compared to those with lump sum contract. The chi-square tests of cross tabulations reveal that project type, owner type, and procurement method affect the selection of contract types significantly. Civil infrastructure rather than industrial engineering project tends to use lump sum more frequently; and qualification-oriented contractor selection process resorts to GMP more often compared with cost-oriented process. The findings of this research contribute to the current body of knowledge concerning the effect of associated project characteristics on contract type selection. Overall, the results of this study provide empirical evidence from real DB projects that can be used by owners to select appropriate contract types and eventually improve future project performance.