905 resultados para Residential building construction
Resumo:
This summary is based on an international review of leading peer reviewed journals, in both technical and management fields. It draws on highly cited articles published between 2000 and 2009 to investigate the research question, "What are the diffusion determinants for passive building technologies in Australia?". Using a conceptual framework drawn from the innovation systems literature, this paper synthesises and interprets the literature to map the current state of passive building technologies in Australia and to analyse the drivers for, and obstacles to, their optimal diffusion. The paper concludes that the government has a key role to play through its influence over the specification of building codes.
Resumo:
Client-side project manager face challenges in motivating project organisations to pursue exceptional design and construction performance. One approach to improving the motivation of project organisations is by offering a financial incentive reward for the achievement of voluntary performance standards above the minimum required standard. However, little investigation has been undertaken into the features of a successful incentive system as a part of an overall procurement strategy. In response to a lack of information available to client-side project managers tasked with the initial design of an incentive system, the paper explores motivation undera successful incentive and identifies key learnings for client-side project managers to consider when designing incentives. Our findings are based on the results of a large Australian case study which is interpreted against a conceptual framework based on both economic and psychological perspectives of motivation. The results suggest the motivation towards incentive goals is influenced by the value the project organisations place on the incentive reward as a commercial opportunity to increase their profit margins. However, perhaps more important are the relationship management processes that promote commitment to the project; and pride in the achievement of project goals. In the case study, these processes intensified the direct motivational effect of the incentive reward on offer. The findings also highlight the importance of ensuring that incentive goals and performance measurement processes remain relevant to the organisation throughout a project to continuously encourage motivation under changing project conditions.
Resumo:
Prefabricated construction is regarded by many as an effective and efficient approach to improving construction processes and productivity, ensuring construction quality and reducing time and cost in the construction industry. However, many problems occur with this approach in practice, including higher risk levels and cost or time overruns. In order to solve such problems, it is proposed that the IKEA model of the manufacturing industry and VP technology are introduced into a prefabricated construction process. The concept of the IKEA model is identified in detail and VP technology is briefly introduced. In conjunction with VP technology, the applications of the IKEA model are presented in detail, i.e. design optimization, production optimization and installation optimization. Furthermore, through a case study of a prefabricated hotel project in Hong Kong, it is shown that the VP-based IKEA model can improve the efficiency and safety of prefabricated construction as well as reducing cost and time.
Resumo:
Public participate in the planning and design of major public infrastructure and construction (PIC) projects is crucial to their success, as the interests of different stakeholders can be systematically captured and built into the finalised scheme. However, public participation may not always yield a mutually acceptable solution, especially when the interests of stakeholders are diverse and conflicting. Confrontations and disputes can arise unless the concerns or needs of the community are carefully analysed and addressed. The aim of the paper is to propose a systematic method of analysing stakeholder concerns relating to PIC projects by examining the degree of consensus and/or conflict involved. The results of a questionnaire survey and a series of interviews with different entities are provided, which indicate the existence of a significant divergence of views among stakeholder groups and that conflicts arise when there is a mismatch between peoples’ perception concerning money and happiness on the one hand and development and damages on the other. Policy and decision-makers should strive to resolve at least the majority of conflicts that arise throughout the lifecycle of major PIC projects so as to maximise their chance of success.
Resumo:
Retrofit projects are different from newly-built projects in many respects. A retrofit project involves an existing building, which imposes constraints on the owners, designers, operators and constructors throughout the project process. Retrofit projects are risky, complex, less predictable and difficult to be well planned, which need greater coordination. For office building retrofit project, further restrictions will apply as these buildings often locate in CBD areas and most have to remain operational during the progression of project work. Issues such as site space, material storage and handling, noise and dust, need to be considered and well addressed. In this context, waste management is even more challenging with small spaces for waste handling, uncertainties in waste control, and impact of waste management activities on project delivery and building occupants. Current literatures on waste management in office building retrofit projects focus on increasing waste recovery rate based on project planning, monitoring and stakeholders’ collaboration. However, previous research has not produced knowledge of understanding the particular retrofit processes and their impact on waste generation and management. This paper discusses the interim results of a continuing research on new strategies for waste management in office building retrofit projects. Firstly based on the literature review, it summarizes the unique characteristics of office building retrofit projects and their influence on waste management. An assumption on waste management strategies is formed. Semi-structured interviews were conducted towards industry practitioners and findings are then presented in the paper. The assumption of the research was validated in the interviews from the opinions and experiences of the respondents. Finally the research develops a process model for waste management in office building retrofit projects. It introduces two different waste management strategies. For the dismantling phase, waste is generated fast along with the work progress, so integrated planning for project delivery and waste generation is needed in order to organize prompt handling and treatment. For the fit-out phase, the work is similar as new construction. Factors which are particularly linked to generating waste on site need to be controlled and monitored. Continuing research in this space will help improve the practice of waste management in office building retrofit projects. The new strategies will help promote the practicality of project waste planning and management and stakeholders’ capability of coordinating waste management and project delivery.
Resumo:
Sustainability is an issue for everyone. For instance, the higher education sector is being asked to take an active part in creating a sustainable future, due to their moral responsibility, social obligation, and their own need to adapt to the changing higher education environment. By either signing declarations or making public statements, many universities are expressing their desire to become role models for enhancing sustainability. However, too often they have not delivered as much as they had intended. This is particularly evident in the lack of physical implementation of sustainable practices in the campus environment. Real projects such as green technologies on campus have the potential to rectify the problem in addition to improving building performance. Despite being relatively recent innovations, Green Roof and Living Wall have been widely recognized because of their substantial benefits, such as runoff water reduction, noise insulation, and the promotion of biodiversity. While they can be found in commercial and residential buildings, they only appear infrequently on campuses as universities have been very slow to implement sustainability innovations. There has been very little research examining the fundamental problems from the organizational perspective. To address this deficiency, the researchers designed and carried out 24 semi-structured interviews to investigate the general organizational environment of Australian universities with the intention to identify organizational obstacles to the delivery of Green Roof and Living Wall projects. This research revealed that the organizational environment of Australian universities still has a lot of room to be improved in order to accommodate sustainability practices. Some of the main organizational barriers to the adoption of sustainable innovations were identified including lack of awareness and knowledge, the absence of strong supportive leadership, a weak sustainability-rooted culture and several management challenges. This led to the development of a set of strategies to help optimize the organizational environment for the purpose of better decision making for Green Roof and Living Wall implementation.
Resumo:
The goal of this research project is to develop specific BIM objects for temporary construction activities which are fully integrated with object design, construction efficiency and safety parameters. Specifically, the project will deliver modularised electronic scaffolding and formwork objects that will allow designers to easily incorporate them into BIM models to facilitate smarter and safer infrastructure and building construction. This research first identified there is currently a distinct lack of BIM objects for temporary construction works resulting in productivity loss during design and construction, and opportunities for improved consideration of safety standards and practices with the design of scaffolding and formwork. This is particularly relevant in Australia, given the “harmonisation” of OHS legislation across all states and territories from 1 January 2012, meaning that enhancements to Queensland practices will have direct application across Australia. Thus, in conjunction with government and industry partners in Queensland, Australia, the research team developed a strategic three-phase research methodology: (1) the preliminary review phase on industrial scaffolding and formwork practices and BIM implementation; (2) the BIM object development phase with specific safety and productivity functions; and (3) the Queensland-wide workshop phase for product dissemination and training. This paper discusses background review findings, details of the developed methodology, and expected research outcomes and their contributions to the Australian construction industry.
Resumo:
4D simulation, building information modeling, virtual construction, computer simulation and virtual prototyping are emerging topics in the building construction industry. These techniques not only relate to the buildings themselves, but can also be applied to other forms of construction, including bridges. Since bridge construction is a complex process involving multiple types of plant and equipment, applying such virtual methods benefits the understanding of all parties in construction practice. This paper describes the relationship between temporary platforms, plant and equipment resources and a proposed-built model in the construction planning and use of Virtual Prototyping Simulation (VPS) to implement different construction scenarios in order to help planners identify an optimal construction plan. A case study demonstrates the use of VPS integrated with temporary platform design and plant and equipment-resource allocation to generate different construction scenarios.
Resumo:
Construction and demolition (C&D) waste occupies the largest share of overall waste generation in many countries. However, waste management practices and outcomes may differ between countries. For instance, in Australia, C&D waste recovery is continuously improving during the last years but the amount of C&D waste increases every year, as there has been little improvement in waste avoidance and minimization. In contrast, in Germany, waste generation remains constant over many years despite the continuous economic growth. The waste recycling rate in Germany is one of the highest in the world. However, most waste recycled is from demolition work rather than from waste generated during new construction. In addition, specific laws need to be developed to further reduce landfill of non-recycled waste. Despite of the differences, C&D waste generation and recovery in both countries depend on the effectiveness of the statutory framework, which regulates their waste management practices. This is an issue in other parts of the world as well. Therefore countries can learn from each other to improve their current statutory framework for C&D waste management. By taking Germany and Australia as an example, possible measures to improve current practices of C&D waste management through better statutory tools are identified in this paper. After providing an overview of the statutory framework of both countries and their status in waste generation and recovery, a SWOT analysis is conducted to identify strengths, weaknesses, opportunities and threats of the statutory tools. Recommendations to improve the current statutory frameworks, in order to achieve less waste generation and more waste recovery in the construction industry are provided for the German and Australian government and they can also be transferred to other countries.
Resumo:
Building prefabrication is known as Industrialised Building Systems (IBS) in Malaysia. This construction method possesses unique characteristics that are central to sustainable construction. For example, offsite construction enables efficient management of construction wastage by identifying major causes of waste arising during both the design and construction stages. These causes may then be eliminated by the improvement process in IBS component's manufacturing. However, current decisions on using IBS are typically financial driven and hinder the wider ranged adoption. In addition, current IBS misconceptions and the failure of rating schemes in evaluating the sustainability of IBS affect its implementation. A new approach is required to provide better understanding on the sustainability potential of IBS among stakeholders. Such approach should also help project the outcomes of each levels of decision-making to respond to social, economy and environmental challenges. This paper presents interim findings of research aimed at developing a framework for sustainable IBS development and suggests a more holistic approach to achieve sustainability. A framework of embedding sustainability factors is considered in three main phases of IBS construction; 1) Pre-construction, 2) Construction and 3) Post-construction phase. SWOT analysis was used to evaluate the strengths, weaknesses, opportunities and threats involved in the IBS implementations. The action plans are formulated from the analysis of sustainable objectives. This approach will show where and how sustainability should be integrated to improve IBS construction. A mix of quantitative and qualitative methodology was used in this research to explore the potential of IBS in integrating sustainability. The tools used in the study are questionnaires and semi-structured interviews. Outcomes from these tools lead to the identification of viable approaches involving 18 critical factors to improve sustainability in IBS constructions. Finally, guidelines for decision-making are being developed to provide a useful source of information and support to mutual benefit of the stakeholders in integrating sustainability issues and concepts into IBS applications.
Resumo:
Building Information Modelling (BIM) appears to be the next evolutionary link in project delivery within the AEC (Architecture, Engineering and Construction) Industry. There have been several surveys of implementation at the local level but to date little is known of the international context. This paper is a preliminary report of a large scale electronic survey of the implementation of BIM and the impact on AEC project delivery and project stakeholders in Australia and internationally. National and regional patterns of BIM usage will be identified. These patterns will include disciplinary users, project lifecycle stages, technology integration–including software compatibility—and organisational issues such as human resources and interoperability. Also considered is the current status of the inclusion of BIM within tertiary level curricula and potential for the creation of a new discipline.
Resumo:
Purpose: Tacit knowledge is perceived as the most strategically important resource of the construction organisation, and the only renewable and sustainable base for its activities and competitiveness. Knowledge management (KM) activities that deal with tacit knowledge are essential in helping an organisation to achieve its long-term organisational objectives. The purpose of this paper is to provide empirical evidence for the stronger strategic role of tacit KM in comparison to explicit KM. Design/methodology/approach: A questionnaire survey was administered in 2005 to a sample of construction contractors operating in Hong Kong to elicit opinions on the internal business environment, intensity of KM activities as executed by targeted organisations, and contribution of these activities to business performance (BP). A total of 149 usable responses were received from 99 organisations representing about 38 per cent of the sampling frame. The statistical analyses helped to map the reported KM activities into two groups that, respectively, deal with tacit and explicit knowledge. The sensitivity to variations of organisational policies and strength of association with BP in relation to the two groups of KM activities were also compared empirically. A total of 15 interviews with the managerial and professional staff of leading contractors was undertaken to provide insightful narratives of KM implementations. Findings: The effective implementation of organisational policies, such as encouraging innovations and strengthening strategic guidance for KM, would facilitate human interactions of tacit KM. Higher intensity of activities in managing tacit knowledge would ultimately help the organisations to achieve economic gain in the long run. Originality/value: The stronger strategic role of tacit KM is empirically investigated and established within the context of construction organisations.
Resumo:
Building information modeling (BIM) is an emerging technology and process that provides rich and intelligent design information models of a facility, enabling enhanced communication, coordination, analysis, and quality control throughout all phases of a building project. Although there are many documented benefits of BIM for construction, identifying essential construction-specific information out of a BIM in an efficient and meaningful way is still a challenging task. This paper presents a framework that combines feature-based modeling and query processing to leverage BIM for construction. The feature-based modeling representation implemented enriches a BIM by representing construction-specific design features relevant to different construction management (CM) functions. The query processing implemented allows for increased flexibility to specify queries and rapidly generate the desired view from a given BIM according to the varied requirements of a specific practitioner or domain. Central to the framework is the formalization of construction domain knowledge in the form of a feature ontology and query specifications. The implementation of our framework enables the automatic extraction and querying of a wide-range of design conditions that are relevant to construction practitioners. The validation studies conducted demonstrate that our approach is significantly more effective than existing solutions. The research described in this paper has the potential to improve the efficiency and effectiveness of decision-making processes in different CM functions.
Resumo:
Purpose: Recent knowledge management (KM) literature suggests that KM activities are influenced by the elements of the internal business environment (BE) of organisations. This paper attempts to provide some unique insights into the contextual input of the KM process through empirically identifying the major factors (i.e. “forces”) within the internal BE of construction organisations operating in Hong Kong, and investigating their impact on the intensity of KM activities. Design/methodology/approach: A questionnaire survey was administered to a sample of construction contractors operating in Hong Kong to elicit opinions on the internal BE and intensity of KM activities as executed by targeted organisations. A total of 149 usable responses were received from 99 organisations representing about 38 percent of the research population. In parallel, to the survey, a total of 15 semi-structured interviews were undertaken to provide more insights into the phenomenon under investigation. Findings: Supported by the empirical and qualitative evidence, this study established that firstly, both organisational and technical environments have the capacity to either positively or negatively impact the intensity of KM activities, and both environments serve as stimuli in increasing each other's dynamism; secondly, certain types of KM activities are stronger “energy receivers” and easily to be “powered up” by manipulating factors representing these two environments. Then, through interactions between KM activities, the intensity of the whole strategic KM cycle will be increased thus helping to strengthen organisational competitive advantage.
Resumo:
Construction practitioners often experience unexpected results of their scheduling-related decisions. This is mainly due to lack of understanding of the dynamic nature of construction system. However, very little attention has been given to its significant importance and few empirical studies have been undertaken on this issue. This paper, therefore, analyzes the effect of aggressive scheduling, overtime, resource adding, and schedule slippage on construction performance, focusing on workers’ reactions to those scheduling decisions. Survey data from 102 construction practitioners in 38 construction sites are used for the analysis. The results indicate that efforts to increase work rate by working overtime, resource adding, and aggressive scheduling can be offset due to losses in productivity and quality. Based on the research findings, practical guidelines are then discussed to help site managers to effectively deal with the dynamics of scheduling and improve construction performance.