913 resultados para Project Analysis


Relevância:

40.00% 40.00%

Publicador:

Resumo:

"For administrative use only."

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Individuals from the same population share a number of contextual circumstances that may condition a common level of blood pressure over and above individual characteristics. Understanding this population effect is relevant for both etiologic research and prevention strategies. Using multilevel regression analyses, the authors quantified the extent to which individual differences in systolic blood pressure (SBP) could be attributed to the population level. They also investigated possible cross-level interactions between the population in which a person lived and pharmacological (antihypertensive medication) and nonpharmacological (body mass index) effects on individual SBP. They analyzed data on 23,796 men and 24,986 women aged 35-64 years from 39 worldwide Monitoring of Trends and Determinants in Cardiovascular Disease (MONICA) study populations participating in the final survey of this World Health Organization project (1989-1997). SBP was positively associated with low educational achievement, high body mass index, and use of antihypertensive medication and, for women, was negatively associated with smoking. About 7-8% of all SBP differences between subjects were attributed to the population level. However, this population effect was particularly strong (i.e., 20%) in antihypertensive medication users and overweight women. This empirical evidence of a population effect on individual SBP emphasizes the importance of developing population-wide strategies to reduce individual risk of hypertension.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

An inherent weakness in the management of large scale projects is the failure to achieve the scheduled completion date. When projects are planned with the objective of time achievement, the initial planning plays a vital role in the successful achievement of project deadlines. Cost and quality are additional priorities when such projects are being executed. This article proposes a methodology for achieving time duration of a project through risk analysis with the application of a Monte Carlo simulation technique. The methodology is demonstrated using a case application of a cross-country petroleum pipeline construction project.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Feasibility studies of industrial projects consist of multiple analyses carried out sequentially. This is time consuming and each analysis screens out alternatives based solely on the merits of that analysis. In cross-country petroleum pipeline project selection, market analysis determines throughput requirement and supply and demand points. Technical analysis identifies technological options and alternatives for pipe-line routes. Economic and financial analysis derive the least-cost option. The impact assessment addresses environmental issues. The impact assessment often suggests alternative sites, routes, technologies, and/or implementation methodology, necessitating revision of technical and financial analysis. This report suggests an integrated approach to feasibility analysis presented as a case application of a cross-country petroleum pipeline project in India.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This study highlights the variables associated with the implementation of renewable energy (RE) projects for sustainable development in India, by using an interpretive structural modeling (ISM) - based approach to model variables' interactions, which impact RE adoption. These variables have been categorized under enablers that help to enhance implementation of RE projects for sustainable development. A major finding is that public awareness regarding RE for sustainable development is a very significant enabler. For successful implementation of RE projects, it has been observed that top management should focus on improving highdriving power enablers (leadership, strategic planning, public awareness, management commitment, availability of finance, government support, and support from interest groups).

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This study proposes an integrated analytical framework for effective management of project risks using combined multiple criteria decision-making technique and decision tree analysis. First, a conceptual risk management model was developed through thorough literature review. The model was then applied through action research on a petroleum oil refinery construction project in the Central part of India in order to demonstrate its effectiveness. Oil refinery construction projects are risky because of technical complexity, resource unavailability, involvement of many stakeholders and strict environmental requirements. Although project risk management has been researched extensively, practical and easily adoptable framework is missing. In the proposed framework, risks are identified using cause and effect diagram, analysed using the analytic hierarchy process and responses are developed using the risk map. Additionally, decision tree analysis allows modelling various options for risk response development and optimises selection of risk mitigating strategy. The proposed risk management framework could be easily adopted and applied in any project and integrated with other project management knowledge areas.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Projects that are exposed to uncertain environments can be effectively controlled with the application of risk analysis during the planning stage. The Analytic Hierarchy Process, a multiattribute decision-making technique, can be used to analyse and assess project risks which are objective or subjective in nature. Among other advantages, the process logically integrates the various elements in the planning process. The results from risk analysis and activity analysis are then used to develop a logical contingency allowance for the project through the application of probability theory. The contingency allowance is created in two parts: (a) a technical contingency, and (b) a management contingency. This provides a basis for decision making in a changing project environment. Effective control of the project is made possible by the limitation of the changes within the monetary contingency allowance for the work package concerned, and the utilization of the contingency through proper appropriation. The whole methodology is applied to a pipeline-laying project in India, and its effectiveness in project control is demonstrated.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This study was an evaluation of a Field Project Model Curriculum and its impact on achievement, attitude toward science, attitude toward the environment, self-concept, and academic self-concept with at-risk eleventh and twelfth grade students. One hundred eight students were pretested and posttested on the Piers-Harris Children's Self-Concept Scale, PHCSC (1985); the Self-Concept as a Learner Scale, SCAL (1978); the Marine Science Test, MST (1987); the Science Attitude Inventory, SAI (1970); and the Environmental Attitude Scale, EAS (1972). Using a stratified random design, three groups of students were randomly assigned according to sex and stanine level, to three treatment groups. Group one received the field project method, group two received the field study method, and group three received the field trip method. All three groups followed the marine biology course content as specified by Florida Student Performance Objectives and Frameworks. The intervention occurred for ten months with each group participating in outside-of-classroom activities on a trimonthly basis. Analysis of covariance procedures were used to determine treatment effects. F-ratios, p-levels and t-tests at p $<$.0062 (.05/8) indicated that a significant difference existed among the three treatment groups. Findings indicated that groups one and two were significantly different from group three with group one displaying significantly higher results than group two. There were no significant differences between males and females in performance on the five dependent variables. The tenets underlying environmental education are congruent with the recommendations toward the reform of science education. These include a value analysis approach, inquiry methods, and critical thinking strategies that are applied to environmental issues. ^

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This study subdivides the Weddell Sea, Antarctica, into seafloor regions using multivariate statistical methods. These regions are categories used for comparing, contrasting and quantifying biogeochemical processes and biodiversity between ocean regions geographically but also regions under development within the scope of global change. The division obtained is characterized by the dominating components and interpreted in terms of ruling environmental conditions. The analysis uses 28 environmental variables for the sea surface, 25 variables for the seabed and 9 variables for the analysis between surface and bottom variables. The data were taken during the years 1983-2013. Some data were interpolated. The statistical errors of several interpolation methods (e.g. IDW, Indicator, Ordinary and Co-Kriging) with changing settings have been compared for the identification of the most reasonable method. The multivariate mathematical procedures used are regionalized classification via k means cluster analysis, canonical-correlation analysis and multidimensional scaling. Canonical-correlation analysis identifies the influencing factors in the different parts of the cove. Several methods for the identification of the optimum number of clusters have been tested. For the seabed 8 and 12 clusters were identified as reasonable numbers for clustering the Weddell Sea. For the sea surface the numbers 8 and 13 and for the top/bottom analysis 8 and 3 were identified, respectively. Additionally, the results of 20 clusters are presented for the three alternatives offering the first small scale environmental regionalization of the Weddell Sea. Especially the results of 12 clusters identify marine-influenced regions which can be clearly separated from those determined by the geological catchment area and the ones dominated by river discharge.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Despite its huge potential in risk analysis, the Dempster–Shafer Theory of Evidence (DST) has not received enough attention in construction management. This paper presents a DST-based approach for structuring personal experience and professional judgment when assessing construction project risk. DST was innovatively used to tackle the problem of lacking sufficient information through enabling analysts to provide incomplete assessments. Risk cost is used as a common scale for measuring risk impact on the various project objectives, and the Evidential Reasoning algorithm is suggested as a novel alternative for aggregating individual assessments. A spreadsheet-based decision support system (DSS) was devised to facilitate the proposed approach. Four case studies were conducted to examine the approach's viability. Senior managers in four British construction companies tried the DSS and gave very promising feedback. The paper concludes that the proposed methodology may contribute to bridging the gap between theory and practice of construction risk assessment.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The current study is a post-hoc analysis of data from the original randomized control trial of the Play and Language for Autistic Youngsters (PLAY) Home Consultation program, a parent-mediated, DIR/Floortime based early intervention program for children with ASD (Solomon, Van Egeren, Mahone, Huber, & Zimmerman, 2014). We examined 22 children from the original RCT who received the PLAY program. Children were split into two groups (high and lower functioning) based on the ADOS module administered prior to intervention. Fifteen-minute parent-child video sessions were coded through the use of CHILDES transcription software. Child and maternal language, communicative behaviors, and communicative functions were assessed in the natural language samples both pre- and post-intervention. Results demonstrated significant improvements in both child and maternal behaviors following intervention. There was a significant increase in child verbal and non-verbal initiations and verbal responses in whole group analysis. Total number of utterances, word production, and grammatical complexity all significantly improved when viewed across the whole group of participants; however, lexical growth did not reach significance. Changes in child communicative function were especially noteworthy, and demonstrated a significant increase in social interaction and a significant decrease in non-interactive behaviors. Further, mothers demonstrated an increase in responsiveness to the child’s conversational bids, increased ability to follow the child’s lead, and a decrease in directiveness. When separated for analyses within groups, trends emerged for child and maternal variables, suggesting greater gains in use of communicative function in both high and low groups over changes in linguistic structure. Additional analysis also revealed a significant inverse relationship between maternal responsiveness and child non-interactive behaviors; as mothers became more responsive, children’s non-engagement was decreased. Such changes further suggest that changes in learned skills following PLAY parent training may result in improvements in child social interaction and language abilities.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Il presente elaborato esplora l’attitudine delle organizzazioni nei confronti dei processi di business che le sostengono: dalla semi-assenza di struttura, all’organizzazione funzionale, fino all’avvento del Business Process Reengineering e del Business Process Management, nato come superamento dei limiti e delle problematiche del modello precedente. All’interno del ciclo di vita del BPM, trova spazio la metodologia del process mining, che permette un livello di analisi dei processi a partire dagli event data log, ossia dai dati di registrazione degli eventi, che fanno riferimento a tutte quelle attività supportate da un sistema informativo aziendale. Il process mining può essere visto come naturale ponte che collega le discipline del management basate sui processi (ma non data-driven) e i nuovi sviluppi della business intelligence, capaci di gestire e manipolare l’enorme mole di dati a disposizione delle aziende (ma che non sono process-driven). Nella tesi, i requisiti e le tecnologie che abilitano l’utilizzo della disciplina sono descritti, cosi come le tre tecniche che questa abilita: process discovery, conformance checking e process enhancement. Il process mining è stato utilizzato come strumento principale in un progetto di consulenza da HSPI S.p.A. per conto di un importante cliente italiano, fornitore di piattaforme e di soluzioni IT. Il progetto a cui ho preso parte, descritto all’interno dell’elaborato, ha come scopo quello di sostenere l’organizzazione nel suo piano di improvement delle prestazioni interne e ha permesso di verificare l’applicabilità e i limiti delle tecniche di process mining. Infine, nell’appendice finale, è presente un paper da me realizzato, che raccoglie tutte le applicazioni della disciplina in un contesto di business reale, traendo dati e informazioni da working papers, casi aziendali e da canali diretti. Per la sua validità e completezza, questo documento è stata pubblicato nel sito dell'IEEE Task Force on Process Mining.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

History has shown that projects move in and out of poor status through the life of the project. Predicting the success or failure of a project to complete on time because of its recent history on the contract status report could provide our project managers another tool for monitoring contract progress. In many instances, poor contract progress results in the loss of contract time and late completion of projects. This research evaluates the combinations of work type, point in time physical work begins, recent poor status, and contract bid amount as indicators of late project completion.