946 resultados para Paper point


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Let f : [0, 1] x R2 -> R be a function satisfying the Caxatheodory conditions and t(1 - t)e(t) epsilon L-1 (0, 1). Let a(i) epsilon R and xi(i) (0, 1) for i = 1,..., m - 2 where 0 < xi(1) < xi(2) < (...) < xi(m-2) < 1 - In this paper we study the existence of C[0, 1] solutions for the m-point boundary value problem [GRAPHICS] The proof of our main result is based on the Leray-Schauder continuation theorem.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper introduces a method for power system modeling during the earth fault. The possibility of using this method for selection and adjustment of earth fault protection is pointed out. The paper also contains the comparison of results achieved by simulation with the experimental measurements.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper constructs a reduction sequence model for north Australian points from the eastern Victoria River region, and identifies a single continuum linking unifacial and bifacial point forms, with some divergence from this single reduction trajectory dependent upon artefact size. Chronological changes in reduction intensity between 5,000BP and the present are found to coincide with typological variation in points as well as changing emphasis on the extendibility of point reduction. It is suggested that changes in the extendibility of point reduction can be linked to intensified ENSO-driven climatic variability in the late Holocene that likely increased economic risk and warranted a substantial technological response, including the use of retouched toolkits with potential for longer use-lives.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A new control algorithm using parallel braking resistor (BR) and serial fault current limiter (FCL) for power system transient stability enhancement is presented in this paper. The proposed control algorithm can prevent transient instability during first swing by immediately taking away the transient energy gained in faulted period. It can also reduce generator oscillation time and efficiently make system back to the post-fault equilibrium. The algorithm is based on a new system energy function based method to choose optimal switching point. The parallel BR and serial FCL resistor can be switched at the calculated optimal point to get the best control result. This method allows optimum dissipation of the transient energy caused by disturbance so to make system back to equilibrium in minimum time. Case studies are given to verify the efficiency and effectiveness of this new control algorithm.