978 resultados para Hydroelectric power


Relevância:

60.00% 60.00%

Publicador:

Resumo:

From 1947 the statements are titled Ministry of Works statement, and issued by the Ministry of Works.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Norway, Mich.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Sponsored by the Dept. of Energy and the Corps of Engineers.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The reservoirs are water sources built along the fluvial basins, between rivers and dams made by concrete or earth. In Brazil they are built for different purposes, standing out the generation of energy (hydroelectric power station), flowing regulation, water reserves and flooding control, therefore they have played and still play an important role in the modern society.In the Northeastern semiarid region, they are typically used to supply cities and as a source of food.In the state of Rio Grande do Norte, the large reservoirs are intended for the same purpose.The cities settled in the riverbanks, or which have river channels crossing them, face flooding related problems. In the city of Macaíba-RN, flooding occurred systematically during the rainy season, causing great inconvenience to the local population.As product of the collective claim Tabatinga Reservoir in Jundiaí river was built, upstream of the city. Facing this background, this thesis aimed to assess the sócio-environmental quality of this reservoir.To achieve this goal, methodologies pointed to assess water quality along with the aplication of a questionnaire were used aimed to verify the quality of water and to know the perception of the residents from urban and rural área settled near to the reservoir was performed. The results showed the existence of conflicts of residents of rural communities and the presence of the reservoir, while for the city's population, the reservoir is considered not only the right solution to solve flooding in urban areas, but also as economic source for the rural population. Considering the water source assessment, this study concluded that the Tabatinga Reservoir is unfit for human use, due to the presence of metals of toxicological significance with the potential to elicit damage to the genetic material of individuals that use water from this reservoir, leading to cause serious risks to health population.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Based on the possibility of real-time interaction with three-dimensional environments through an advanced interface, Virtual Reality consist in the main technology of this work, used in the design of virtual environments based on real Hydroelectric Plants. Previous to the process of deploying a Virtual Reality System for operation, three-dimensional modeling and interactive scenes settings are very importante steps. However, due to its magnitude and complexity, power plants virtual environments generation, currently, presents high computing cost. This work aims to present a methodology to optimize the production process of virtual environments associated with real hydroelectric power plants. In partnership with electric utility CEMIG, several HPPs were used in the scope of this work. During the modeling of each one of them, the techiniques within the methodologie were addressed. After the evaluation of the computional techniques presented here, it was possible to confirm a reduction in the time required to deliver each hydroelectrical complex. Thus, this work presents the current scenario about development of virtual hydroelectric power plants and discusses the proposed methodology that seeks to optimize this process in the electricity generation sector.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Um sistema de predição de alarmes com a finalidade de auxiliar a implantação de uma política de manutenção preditiva industrial e de constituir-se em uma ferramenta gerencial de apoio à tomada de decisão é proposto neste trabalho. O sistema adquire leituras de diversos sensores instalados na planta, extrai suas características e avalia a saúde do equipamento. O diagnóstico e prognóstico implica a classificação das condições de operação da planta. Técnicas de árvores de regressão e classificação não-supervisionada são utilizadas neste artigo. Uma amostra das medições de 73 variáveis feitas por sensores instalados em uma usina hidrelétrica foi utilizada para testar e validar a proposta. As medições foram amostradas em um período de 15 meses.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This work aims to develop optical sensors for temperature monitoring in hydroelectric power plant heat exchangers. The proposed sensors are based on the Fiber Bragg Gratings technology. First of all, a prototype with three sensors inscribed in a same fiber was developed. This fiber was then fixed to a conventional Pt100 sensor rod and inserted in a thermowell. The ensemble was then calibrated in a workbench, presenting a maximum combined uncertainty of 2,06 °C. The sensor was installed in one of the heat exchangers of the Salto Osório’s hydroelectric power plant. This power plant is situated in the Iguaçu river, at the Paraná state. Despite the satisfactory results, the sensor was improved to a second version. In this, fifteen optical Bragg sensors were inscribed in a same fiber. The fixation with a conventional sensor was no longer necessary, because the first version results comproved the efficiency and response time in comparison to a conventional sensor. For this reason, it was decided to position the fiber inside a stainless steel rod, due to his low thermal expansion coefficient and high corrosion immunity. The utilization of fifteen fiber Bragg gratings aims to improve the sensor spatial resolution. Therefore, measurements every ten centimeters with respect to the heat exchanger’s height are possible. This provides the generation of a thermal map of the heat exchanger’s surface, which can be used for determination of possible points of obstruction in the hydraulic circuit of the heat exchanger. The heat exchanger’s obstruction in hydroelectric power plants usually occur by bio-fouling, and has direct influence in the generator’s cooling system efficiency. The obtained results have demonstrated the feasibility in application of the optical sensors technology in hydroelectric power plants.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Brazil is internationally acknowledged for its renewable sources, most notably, hydroelectric power plant projects which correspond to 65% of electricity production supply to the National Interconnected System. The main question behind this research is: what are the weights and the relative importance of the variables which have influence on the decision making process for the expansion of hydroelectric generation projects in Parana? The main objective is to propose a multi-criteria decision procedure, in association with water sources options that take into consideration the weight and relative importance of the alternatives having influence on the decision by enterprises in the generation of electricity in the state of Paraná. As far as the approach to the problem is concerned, this research can be classified as having mixed methodologies, applying Content Analysis, Delphi technique and the Analytic Hierarchy Process. Following Delphi methodology, a group of 21 was selected for data collection, all of those linked to Paranaense hydroelectricity market. And the main result was the construction of a decision tree in which it was possible to identify the importance and relative weight of the elements associated with the four dimensions of energy. In environmental dimension, the highest relative weight was placed on the loading capacity of Parana system; the economic dimension, the amortization of investment; in social dimension, the generation of direct work places and in institutional dimension, the availability of suitable sources of financing. Policy makers and business managers make their decisions based on specific criteria related to the organization segment, market information, economic and political behavior among other indicators that guide them in dealing with the typical tradeoffs of projects in hydropower area. The results obtained in the decision tree show that the economic bias is still the main factor in making investment decisions. However, environmental impacts on the State loading capacity, income generation, providing opportunities for direct as well as indirect jobs. And at an institutional level, the absence of funding sources show that the perception of experts is focused on other issues beyond the logic behind development per se. The order of priority of variables in this study indicates that in the current environment of uncertainty in the Brazilian economy as many variables must be analyzed and compared in order to optimize the scarce resources available to expand local development in relation to Paranaense water matrix.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Tese (doutorado)—Universidade de Brasília, Instituto de Ciências Humanas, Departamento de Geografia, Pós-Graduação em Geografia, 2016.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Dissertação (mestrado)—Universidade de Brasília, Instituto de Geociências, 2015.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

http://digitalcommons.colby.edu/atlasofmaine2008/1010/thumbnail.jpg

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A DFT/MD mutual iterative method was employed to give insights into the mechanism of voltage generation based on water-fitted single-walled carbon nanotubes (SWCNTs). Our calculations showed that a constant voltage difference of several mV would generate between the two ends of a carbon nanotube, due to interactions between the water dipole chains and charge carriers in the tube. Our work validates this structure of a water-fitted SWCNT as a promising candidate for a synthetic nanoscale power cell, as well as a practical nanopower harvesting device at the atomic level.