987 resultados para Engineering design


Relevância:

70.00% 70.00%

Publicador:

Resumo:

The traditional structural design procedure, especially for the large-scale and complex structures, is time consuming and inefficient. This is due primarily to the fact that the traditional design takes the second-order effects indirectly by virtue of design specifications for every member instead of system analysis for a whole structure. Consequently, the complicated and tedious design procedures are inevitably necessary to consider the second-order effects for the member level in design specification. They are twofold in general: 1) Flexural buckling due to P-d effect, i.e. effective length. 2) Sway effect due to P-D effect, i.e. magnification factor. In this study, a new system design concept based on the second-order elastic analysis is presented, in which the second-order effects are taken into account directly in the system analysis, and also to avoid the tedious member-by-member stability check. The plastic design on the basis of this integrated method of direct approach is ignored in this paper for simplicity and clarity, as the only emphasis is placed on the difference between the second-order elastic limit-state design and present system design approach. A practical design example, a 57m-span dome steel skylight structure, is used to demonstrate the efficiency and effectiveness of the proposed approach. This skylight structure is also designed by the traditional design approach BS5950-2000 for comparison on which the emphasis of aforementioned P-d and P-D effects is placed.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Fire incident in buildings is common, so the fire safety design of the framed structure is imperative, especially for the unprotected or partly protected bare steel frames. However, software for structural fire analysis is not widely available. As a result, the performance-based structural fire design is urged on the basis of using user-friendly and conventional nonlinear computer analysis programs so that engineers do not need to acquire new structural analysis software for structural fire analysis and design. The tool is desired to have the capacity of simulating the different fire scenarios and associated detrimental effects efficiently, which includes second-order P-D and P-d effects and material yielding. Also the nonlinear behaviour of large-scale structure becomes complicated when under fire, and thus its simulation relies on an efficient and effective numerical analysis to cope with intricate nonlinear effects due to fire. To this end, the present fire study utilizes a second order elastic/plastic analysis software NIDA to predict structural behaviour of bare steel framed structures at elevated temperatures. This fire study considers thermal expansion and material degradation due to heating. Degradation of material strength with increasing temperature is included by a set of temperature-stress-strain curves according to BS5950 Part 8 mainly, which implicitly allows for creep deformation. This finite element stiffness formulation of beam-column elements is derived from the fifth-order PEP element which facilitates the computer modeling by one member per element. The Newton-Raphson method is used in the nonlinear solution procedure in order to trace the nonlinear equilibrium path at specified elevated temperatures. Several numerical and experimental verifications of framed structures are presented and compared against solutions in literature. The proposed method permits engineers to adopt the performance-based structural fire analysis and design using typical second-order nonlinear structural analysis software.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Joint venture design teams are formed to combine resources and expertise in order to secure multi-discipline engineering design services on major projects. Bringing together resources from two ordinarily competing companies to form one joint team is however challenging as each parent company brings to the project its own organisational culture, processes and team attitudes. This study examined the factors that impact on forming a successful joint venture project team. Three critical areas were identified from an extensive literature review; Joint Venture Arrangements, Parent Companies and Forming the Team; and a survey was conducted with professionals who have worked in joint venture project teams in the Australian building industry in order to identify factors that affected successful joint venture team formation, and the common lessons learnt. This study reinforced the importance of three key criteria - trust, commitment and compatibility - for partner alignment. The results also identified four key lessons learnt which included; selecting the right resources, enabling a collaborative working environment by way of project office, implementing an independent Joint Venture Manager, and allocating work which is best for project with fees reflecting risk where risk is disproportionate.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The design of society’s major infrastructure systems are generally based on anthropogenic learnings and seldom encapsulate learning from nature. This results from a pervading attitude of superiority of human-designed systems, particularly since the Industrial Revolution. Problems created by such behaviours have previously not been thought to present a serious threat to humanity. However, many built environment professionals are now reconsidering the impact of such systems on the environment and their vulnerability to issues such as climate change. This paper presents an approach to delivering sustainable urban infrastructure that addresses 21st Century needs by emulating natural form, function and process - biomimicry – in infrastructure design. The analysis reveals the context for infrastructure change and the need for sustainable solutions, detailing the current inquiry into biomimicry informed design and highlighting potential applications from literature that demonstrate precedence for nature to inspire the design of urban infrastructure, in particular water and energy systems.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Global pressures of burgeoning population growth and consumption are threatening efforts to reduce negative environmental pressures associated with development such as atmospheric, land and water pollution. For example, the world’s population is now growing at over 70 million per year or 1 billion per decade (Brown, 2007), increasing from 3.5 billion in 1970, to 5 billion in 1990, to 7 billion by 2010 (United Nations, 2002). In 1990 only 13 percent of the global population lived in cities, while in 2007 more than half did. More than 60 percent of the global population lives within 100 kilometers of the coastline (World Resources Institute, 2005) and nearly all of the population growth hereon is forecast to happen in developing countries (Postel, 1999). Future levels of stress on the global environment are therefore likely to increase if current trends are used for forecasting, which is particularly challenging as scientists are already observing significant signs of degradation and failure in environmental systems. For example, the Intergovernmental Panel on Climate Change Fourth Assessment Report (IPCC, 2007) provided an nequivocal link between climate change and current human activities, in particular: the burning of fossil fuels; deforestation and land clearing; the use of synthetic greenhouse gases; and decomposition of wastes from landfill. The UK Stern Review concluded that within our lifetime there is between a 77 to 99 percent chance (depending on the climate model used) of the global average temperature rising by more than 2 degrees Celsius (Stern, 2006), with a likely greenhouse gas concentration in the atmosphere of 550 parts per million (ppm) or more by around 2100.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

At the 2012 CDIO conference, it was clear to all that engineering for 21st Century challenges and opportunities will be critical to the success of society over the next 2-3 decades, in dealing with pressures including climate change, resource depletion and urban densification. Within this context there is a growing imperative for rapid curriculum renewal towards education for sustainable development across all types and disciplines of engineering education, around the world. Building on a paper presented by these authors at the 2012 CDIO conference, this 2013 roundtable will draw on participants’ experiences to discuss how sustainability knowledge and skills can be embedded within a CDIO-based program using a holistic approach to curriculum renewal. The highly interactive and dynamic session will include two parts: 1) a short presentation from the chairs of the roundtable on an emergent model for rapid curriculum renewal; and 2) a facilitated discussion with participants about challenges and opportunities for action. Session notes will be recorded for distribution among participants following the conference.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Early on Christmas morning 1974, tropical cyclone Tracy devastated the city of Darwin leaving only 6 per cent of the city’s housing habitable and instigating the evacuation of 75 per cent of its population. The systematic failure of so much of Darwin’s building stock led to a humanitarian disaster that proved the impetus for an upheaval of building regulatory and construction practices throughout Australia. Indeed, some of the most enduring legacies of Tracy have been the engineering and regulatory steps taken to ensure the extent of damage would not be repeated. This chapter explores these steps and highlights lessons that have led to a national building framework and practice at the fore of wind-resistant design internationally.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Fire resistance rating of light gauge steel frame (LSF) wall systems is obtained from fire tests based on the standard fire time-temperature curve. However, fire severity has increased in modern buildings due to higher fuel loads as a result of modern furniture and light weight constructions that make use of thermoplastics materials, synthetic foams and fabrics. Some of these materials are high in calorific values and increase both the spread of fire growth and heat release rate, thus increasing the fire severity beyond that of the standard fire curve. Further, the standard fire curve does not include a decay phase that is present in natural fires. Despite the increasing usage of LSF walls, their behaviour in real building fires is not fully understood. This paper presents the details of a research study aimed at developing realistic design fire curves for use in the fire tests of LSF walls. It includes a review of the characteristics of building fires, previously developed fire time-temperature curves, computer models and available parametric equations. The paper highlights that real building fire time-temperature curves depend on the fuel load representing the combustible building contents, ventilation openings and thermal properties of wall lining materials, and provides suitable values of many required parameters including fuel loads in residential buildings. Finally, realistic design fire time-temperature curves simulating the fire conditions in modern residential buildings are proposed for the testing of LSF walls.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Successful management of design changes is critical for the efficient delivery of construction projects. Building Information Modeling (BIM) is envisioned to play an important role in integrating design, construction and facility management processes through coordinated changes throughout the project life-cycle. BIM currently provides significant benefits in coordinating changes across different views in a single model, and identifying conflicts between different discipline-specific models. However, current BIM tools provide limited support in managing changes across several discipline-specific models. This paper describes an approach to represent, coordinate, and track changes within a collaborative multi-disciplinary BIM environment. This approach was informed by a detailed case study of a large, complex, fast-tracked BIM project where we investigated numerous design changes, analyzed change management processes, and evaluated existing BIM tools. Our approach characterises design changes in an ontology to represent changed component attributes, dependencies between components, and change impacts. It explores different types of dependencies amongst different design changes and describes how a graph based approach and dependency matrix could assist with automating the propagation and impact of changes in a BIM-based project delivery process.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

This thesis presents the design process and the prototyping of a lightweight, modular robotic vehicle for the sustainable intensification of broadacre agriculture. Achieved by the joint operation of multiple autonomous vehicles to improve energy consumption, reduce labour, and increase efficiency in the application of inputs for the management of crops. The Small Robotic Farm Vehicle (SRFV) is a lightweight and energy efficient robotic vehicle with a configurable, modular design. It is capable of undertaking a range of agricultural tasks, including fertilising and weed management through mechanical intervention and precision spraying, whilst being more than an order of magnitude lower in weight than existing broadacre agricultural equipment.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

‘Complexity’ is a term that is increasingly prevalent in conversations about building capacity for 21st Century professional engineers. Society is grappling with the urgent and challenging reality of accommodating seven billion people, meeting needs and innovating lifestyle improvements in ways that do not destroy atmospheric, biological and oceanic systems critical to life. Over the last two decades in particular, engineering educators have been active in attempting to build capacity amongst professionals to deliver ‘sustainable development’ in this rapidly changing global context. However curriculum literature clearly points to a lack of significant progress, with efforts best described as ad hoc and highly varied. Given the limited timeframes for action to curb environmental degradation proposed by scientists and intergovernmental agencies, the authors of this paper propose it is imperative that curriculum renewal towards education for sustainable development proceeds rapidly, systemically, and in a transformational manner. Within this context, the paper discusses the need to consider a multiple track approach to building capacity for 21st Century engineering, including priorities and timeframes for undergraduate and postgraduate curriculum renewal. The paper begins with a contextual discussion of the term complexity and how it relates to life in the 21st Century. The authors then present a whole of system approach for planning and implementing rapid curriculum renewal that addresses the critical roles of several generations of engineering professionals over the next three decades. The paper concludes with observations regarding engaging with this approach in the context of emerging accreditation requirements and existing curriculum renewal frameworks.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Background Engineering design is of significant interest to engineering educators. As yet, how the higher education context shapes student outcomes in engineering design courses remains underexplored. Since design courses are the primary way students are taught the critical topic of design, it is important to understand how the institutional and organizational contexts shape student outcomes and how we could improve design projects, given the context. Purpose We sought to answer two questions: What aspects of the design education process are salient, or important, for students? How do these salient aspects affect their design practices? Design/Method We used a qualitative case study approach to address the research questions because of our emphasis on understanding process-related aspects of design work and developing an interpretive understanding from the students’ perspective. Results Using a nested structuration framework, we show that the context of design practices shaped students’ outcomes by constraining their approach to the project and by providing a framework for their design process. We provide recommendations for design educators to help students overcome impediments to achieving learning objectives for design activities. Our research questions the efficacy of teaching engineering design when a design problem lacks a context beyond the classroom. Conclusions The institutional and organizational contexts influence student design practices. Engineering educators should carefully consider the potential effects of the design projects they implement within a higher education context.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

An electromagnetically coupled feed arrangement is proposed for simultaneously exciting multiple concentric ring antennas for multi-frequency operation. This has a multi-layer dielectric configuration in which a transmission line is embedded below the layer containing radiating rings. Energy coupled to these rings from the line beneath is optimised by suitably adjusting the location and dimensions of stubs on the line. It has been shown that the resonant frequencies of these rings do not change as several of these single-frequency antennas are combined to form a multi-resonant antenna. Furthermore, all radiators are forced to operate at their primary mode and some harmonics of the lower resonant frequency rings appearing within the frequency range are suppressed when combined. The experimental prototype antenna has three resonant frequencies at which it has good radiation characteristics.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The WiFiRe (WiFi Rural Extension) proposal for rural broadband access is being developed under the aegis of CEWIT. The system leverages the widely available, and highly cost-reduced, WiFi chipsets. However, only the physical layer from these chipsets is retained. A single base station carries several WiFi transceivers, each serving one sector of the cell, and all operating on the same WiFi channel in a time division duplex (TDD) manner. We replace the contention based WiFi MAC with a single-channel TDD multisector TDM MAC similar to the WiMax MAC. In this paper we discuss in detail the issues in designing such a MAC for the purpose of carrying packet voice telephony and for Internet access. The problem of determining the optimal spatial reuse is formulated and the optimal spatial reuse and the corresponding cell size is derived. Then the voice and data scheduler is designed. It is shown how throughput fairness can be implemented in the data scheduler. A capacity assessment of the system is also provided.