854 resultados para process risk evaluation


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Risks and uncertainties are inevitable in engineering projects and infrastructure investments. Decisions about investment in infrastructure such as for maintenance, rehabilitation and construction works can pose risks, and may generate significant impacts on social, cultural, environmental and other related issues. This report presents the results of a literature review of current practice in identifying, quantifying and managing risks and predicting impacts as part of the planning and assessment process for infrastructure investment proposals. In assessing proposals for investment in infrastructure, it is necessary to consider social, cultural and environmental risks and impacts to the overall community, as well as financial risks to the investor. The report defines and explains the concept of risk and uncertainty, and describes the three main methodology approaches to the analysis of risk and uncertainty in investment planning for infrastructure, viz examining a range of scenarios or options, sensitivity analysis, and a statistical probability approach, listed here in order of increasing merit and complexity. Forecasts of costs, benefits and community impacts of infrastructure are recognised as central aspects of developing and assessing investment proposals. Increasingly complex modelling techniques are being used for investment evaluation. The literature review identified forecasting errors as the major cause of risk. The report contains a summary of the broad nature of decision-making tools used by governments and other organisations in Australia, New Zealand, Europe and North America, and shows their overall approach to risk assessment in assessing public infrastructure proposals. While there are established techniques to quantify financial and economic risks, quantification is far less developed for political, social and environmental risks and impacts. The report contains a summary of the broad nature of decision-making tools used by governments and other organisations in Australia, New Zealand, Europe and North America, and shows their overall approach to risk assessment in assessing public infrastructure proposals. While there are established techniques to quantify financial and economic risks, quantification is far less developed for political, social and environmental risks and impacts. For risks that cannot be readily quantified, assessment techniques commonly include classification or rating systems for likelihood and consequence. The report outlines the system used by the Australian Defence Organisation and in the Australian Standard on risk management. After each risk is identified and quantified or rated, consideration can be given to reducing the risk, and managing any remaining risk as part of the scope of the project. The literature review identified use of risk mapping techniques by a North American chemical company and by the Australian Defence Organisation. This literature review has enabled a risk assessment strategy to be developed, and will underpin an examination of the feasibility of developing a risk assessment capability using a probability approach.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

A study has been conducted to investigate current practices on decision-making under risk and uncertainty for infrastructure project investments. It was found that many European countries such as the UK, France, Germany including Australia use scenarios for the investigation of the effects of risk and uncertainty of project investments. Different alternative scenarios are mostly considered during the engineering economic cost-benefit analysis stage. For instance, the World Bank requires an analysis of risks in all project appraisals. Risk in economic evaluation needs to be addressed by calculating sensitivity of the rate of return for a number of events. Risks and uncertainties of project developments arise from various sources of errors including data, model and forecasting errors. It was found that the most influential factors affecting risk and uncertainty resulted from forecasting errors. Data errors and model errors have trivial effects. It was argued by many analysts that scenarios do not forecast what will happen but scenarios indicate only what can happen from given alternatives. It was suggested that the probability distributions of end-products of the project appraisal, such as cost-benefit ratios that take forecasting errors into account, are feasible decision tools for economic evaluation. Political, social, environmental as well as economic and other related risk issues have been addressed and included in decision-making frameworks, such as in a multi-criteria decisionmaking framework. But no suggestion has been made on how to incorporate risk into the investment decision-making process.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Objectives: This paper sought to identify the behaviour change targets for an injury prevention program; Skills for Preventing Injury in Youth, SPIY. The aim was to explore how such behaviours could subsequently be implemented and evaluated in the program. Methods and Design: The quantitative procedure involved a survey with 267 Year 8 and 9 students (mean age 13.23 years) regarding their engagement in risk-taking behaviours that may lead to injury. The qualitative study involved 30 students aged 14 to 17 years reporting their experiences of injury and risk-taking. Results: Injury risk behaviours co-occurred among three-quarters of those who reported engaging in any alcohol use or transport or violence related injury risk behaviour. Students described in detail some of these experiences. Conclusions: The selection process of identifying target behaviours for change for an injury prevention program is described. Adolescents’ description of such risk behaviours can inform the process of operationalising and contextualising program content and deciding on evaluation methodology. The design of an effective injury prevention program involves considerable preparatory work and this paper was able to describe the process of identifying the behavioural targets for change that can be operationalised and evaluated in the injury prevention program, SPIY.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Safety-compromising accidents occur regularly in the led outdoor activity domain. Formal accident analysis is an accepted means of understanding such events and improving safety. Despite this, there remains no universally accepted framework for collecting and analysing accident data in the led outdoor activity domain. This article presents an application of Rasmussen's risk management framework to the analysis of the Lyme Bay sea canoeing incident. This involved the development of an Accimap, the outputs of which were used to evaluate seven predictions made by the framework. The Accimap output was also compared to an analysis using an existing model from the led outdoor activity domain. In conclusion, the Accimap output was found to be more comprehensive and supported all seven of the risk management framework's predictions, suggesting that it shows promise as a theoretically underpinned approach for analysing, and learning from, accidents in the led outdoor activity domain.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

IEC 61850 Process Bus technology has the potential to improve cost, performance and reliability of substation design. Substantial costs associated with copper wiring (designing, documentation, construction, commissioning and troubleshooting) can be reduced with the application of digital Process Bus technology, especially those based upon international standards. An IEC 61850-9-2 based sampled value Process Bus is an enabling technology for the application of Non-Conventional Instrument Transformers (NCIT). Retaining the output of the NCIT in its native digital form, rather than conversion to an analogue output, allows for improved transient performance, dynamic range, safety, reliability and reduced cost. In this paper we report on a pilot installation using NCITs communicating across a switched Ethernet network using the UCAIug Implementation Guideline for IEC 61850-9-2 (9-2 Light Edition or 9-2LE). This system was commissioned in a 275 kV Line Reactor bay at Powerlink Queensland’s Braemar substation in 2009, with sampled value protection IEDs 'shadowing' the existing protection system. The results of commissioning tests and twelve months of service experience using a Fibre Optic Current Transformer (FOCT) from Smart Digital Optics (SDO) are presented, including the response of the system to fault conditions. A number of remaining issues to be resolved to enable wide-scale deployment of NCITs and IEC 61850-9-2 Process Bus technology are also discussed.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In 2008, a three-year pilot ‘pay for performance’ (P4P) program, known as ‘Clinical Practice Improvement Payment’ (CPIP) was introduced into Queensland Health (QHealth). QHealth is a large public health sector provider of acute, community, and public health services in Queensland, Australia. The organisation has recently embarked on a significant reform agenda including a review of existing funding arrangements (Duckett et al., 2008). Partly in response to this reform agenda, a casemix funding model has been implemented to reconnect health care funding with outcomes. CPIP was conceptualised as a performance-based scheme that rewarded quality with financial incentives. This is the first time such a scheme has been implemented into the public health sector in Australia with a focus on rewarding quality, and it is unique in that it has a large state-wide focus and includes 15 Districts. CPIP initially targeted five acute and community clinical areas including Mental Health, Discharge Medication, Emergency Department, Chronic Obstructive Pulmonary Disease, and Stroke. The CPIP scheme was designed around key concepts including the identification of clinical indicators that met the set criteria of: high disease burden, a well defined single diagnostic group or intervention, significant variations in clinical outcomes and/or practices, a good evidence, and clinician control and support (Ward, Daniels, Walker & Duckett, 2007). This evaluative research targeted Phase One of implementation of the CPIP scheme from January 2008 to March 2009. A formative evaluation utilising a mixed methodology and complementarity analysis was undertaken. The research involved three research questions and aimed to determine the knowledge, understanding, and attitudes of clinicians; identify improvements to the design, administration, and monitoring of CPIP; and determine the financial and economic costs of the scheme. Three key studies were undertaken to ascertain responses to the key research questions. Firstly, a survey of clinicians was undertaken to examine levels of knowledge and understanding and their attitudes to the scheme. Secondly, the study sought to apply Statistical Process Control (SPC) to the process indicators to assess if this enhanced the scheme and a third study examined a simple economic cost analysis. The CPIP Survey of clinicians elicited 192 clinician respondents. Over 70% of these respondents were supportive of the continuation of the CPIP scheme. This finding was also supported by the results of a quantitative altitude survey that identified positive attitudes in 6 of the 7 domains-including impact, awareness and understanding and clinical relevance, all being scored positive across the combined respondent group. SPC as a trending tool may play an important role in the early identification of indicator weakness for the CPIP scheme. This evaluative research study supports a previously identified need in the literature for a phased introduction of Pay for Performance (P4P) type programs. It further highlights the value of undertaking a formal risk assessment of clinician, management, and systemic levels of literacy and competency with measurement and monitoring of quality prior to a phased implementation. This phasing can then be guided by a P4P Design Variable Matrix which provides a selection of program design options such as indicator target and payment mechanisms. It became evident that a clear process is required to standardise how clinical indicators evolve over time and direct movement towards more rigorous ‘pay for performance’ targets and the development of an optimal funding model. Use of this matrix will enable the scheme to mature and build the literacy and competency of clinicians and the organisation as implementation progresses. Furthermore, the research identified that CPIP created a spotlight on clinical indicators and incentive payments of over five million from a potential ten million was secured across the five clinical areas in the first 15 months of the scheme. This indicates that quality was rewarded in the new QHealth funding model, and despite issues being identified with the payment mechanism, funding was distributed. The economic model used identified a relative low cost of reporting (under $8,000) as opposed to funds secured of over $300,000 for mental health as an example. Movement to a full cost effectiveness study of CPIP is supported. Overall the introduction of the CPIP scheme into QHealth has been a positive and effective strategy for engaging clinicians in quality and has been the catalyst for the identification and monitoring of valuable clinical process indicators. This research has highlighted that clinicians are supportive of the scheme in general; however, there are some significant risks that include the functioning of the CPIP payment mechanism. Given clinician support for the use of a pay–for-performance methodology in QHealth, the CPIP scheme has the potential to be a powerful addition to a multi-faceted suite of quality improvement initiatives within QHealth.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Sing & Grow is a short term early intervention music therapy program for at risk families. Sing & Grow uses music to strengthen parent-child relationships by increasing positive parent-child interactions, assisting parents to bond with their children, and extending the repertoire of parents’ skills in relating to their child through interactive . Both the Australian and New Zealand governments are looking for evidence based research to highlight the effectiveness of funded programs in early childhood. As a government funded program, independent evaluation is a requirement of the delivery of the service. This paper explains the process involved in setting up and managing this large scale evaluation from engaging the evaluators and designing the project, to the data gathering stage. It describes the various challenges encountered and concludes that a highly collaborative and communicative partnership bet en researchers and clinicians is essential to ensure data can be gathered with minimal disturbance to clinical music therapy practice.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper describes the development and evaluation of a new instrument - the Clinician Suicide Risk Assessment Checklist (CSRAC). The instrument assesses the clinician's competency in three areas: clinical interviewing, assessment of specific suicide risk factors, and formulating a management plan. A draft checklist was constructed by integrating information from 1) literature review 2) expert clinician focus group and 3) consultation with experts. It was utilised in a simulated clinical scenario with clinician trainees and a trained actor in order to test for inter-rater agreement. Agreement was calculated and the checklist was re-drafted with the aim of maximising agreement. A second phase of simulated clinical scenarios was then conducted and inter-rater agreement was calculated for the revised checklist. In the first phase of the study, 18 of 35 items had inadequate inter-rater agreement (60%>), while in the second phase, using the revised version, only 3 of 39 items failed to achieve adequate inter-rater agreement. Further evidence of reliability and validity are required. Continued development of the CSRAC will be necessary before it can be utilised to assess the effectiveness of risk assessment training programs.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Open pit mine operations are complex businesses that demand a constant assessment of risk. This is because the value of a mine project is typically influenced by many underlying economic and physical uncertainties, such as metal prices, metal grades, costs, schedules, quantities, and environmental issues, among others, which are not known with much certainty at the beginning of the project. Hence, mining projects present a considerable challenge to those involved in associated investment decisions, such as the owners of the mine and other stakeholders. In general terms, when an option exists to acquire a new or operating mining project, , the owners and stock holders of the mine project need to know the value of the mining project, which is the fundamental criterion for making final decisions about going ahead with the venture capital. However, obtaining the mine project’s value is not an easy task. The reason for this is that sophisticated valuation and mine optimisation techniques, which combine advanced theories in geostatistics, statistics, engineering, economics and finance, among others, need to be used by the mine analyst or mine planner in order to assess and quantify the existing uncertainty and, consequently, the risk involved in the project investment. Furthermore, current valuation and mine optimisation techniques do not complement each other. That is valuation techniques based on real options (RO) analysis assume an expected (constant) metal grade and ore tonnage during a specified period, while mine optimisation (MO) techniques assume expected (constant) metal prices and mining costs. These assumptions are not totally correct since both sources of uncertainty—that of the orebody (metal grade and reserves of mineral), and that about the future behaviour of metal prices and mining costs—are the ones that have great impact on the value of any mining project. Consequently, the key objective of this thesis is twofold. The first objective consists of analysing and understanding the main sources of uncertainty in an open pit mining project, such as the orebody (in situ metal grade), mining costs and metal price uncertainties, and their effect on the final project value. The second objective consists of breaking down the wall of isolation between economic valuation and mine optimisation techniques in order to generate a novel open pit mine evaluation framework called the ―Integrated Valuation / Optimisation Framework (IVOF)‖. One important characteristic of this new framework is that it incorporates the RO and MO valuation techniques into a single integrated process that quantifies and describes uncertainty and risk in a mine project evaluation process, giving a more realistic estimate of the project’s value. To achieve this, novel and advanced engineering and econometric methods are used to integrate financial and geological uncertainty into dynamic risk forecasting measures. The proposed mine valuation/optimisation technique is then applied to a real gold disseminated open pit mine deposit to estimate its value in the face of orebody, mining costs and metal price uncertainties.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

ABSRACT. Despite the surge in online retail sales in recent years there still remains reluctance by consumers to complete the online shopping process. A number of authors have attributed consumers’ reluctance to purchase online to apparent barriers. However, such barriers as yet have not been fully examined within a theoretical context. This research explores the application of the perceived risk theoretical framework. Specifically, performance risk and the influence of perceived performance risk has on the phenomenon of Internet Abandoned Cart Syndrome (ACS) is evaluated. To explore this phenomenon, a number of extrinsic cues are identified as playing a major role in the performance evaluation process of online purchases. The results of this study suggest the extrinsic cues of brand, reputation, design and price have an overall impact on the performance evaluation process just prior to an online purchase. Varying these cues either positively or negatively had a strong impact on performance evaluation. Further, it was found that positive or negative reputation was heavily associated with shopping cart abandonment.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

A process evaluation enables understanding of critical issues that can inform the improved, ongoing implementation of an intervention program. This study describes the process evaluation of a comprehensive, multi-level injury prevention program for adolescents. The program targets change in injury associated with violence, transport and alcohol risks and incorporates two primary elements: an 8-week, teacher delivered attitude and behaviour change curriculum for Grade 8 students; and a professional development program for teachers on school level methods of protection, focusing on strategies to increase students’ connectedness to school.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Introduction This study reports on the development of a self report assessment tool to increase the efficacy of crash prediction within Australian Fleet settings Over last 20 years an array of measures have been produced (Driver anger scale, Driving Skill Inventory, Manchester Driver Behaviour Questionnaire, Driver Attitude Questionnaire, Driver Stress Inventory, Safety Climate Questionnaire) While these tools are useful, research has demonstrated limited ability to accurately identify individuals most likely to be involved in a crash. Reasons cited include; - Crashes are relatively rare - Other competing factors may influence crash event - Ongoing questions regarding the validity of self report measures (common method variance etc) - Lack of contemporary issues relating to fleet driving performance