782 resultados para Goal-setting
Resumo:
Tese de Doutoramento, Geologia (Hidrogeologia), 17 de Dezembro de 2013, Universidade dos Açores.
Resumo:
Dissertação de Mestrado, Vulcanologia e Riscos Geológicos, 10 de Novembro de 2005, Universidade dos Açores.
Resumo:
Trabalho de Projeto para obtenção do grau de Mestre em Engenharia Informática e de Computadores
Resumo:
A classical application of biosignal analysis has been the psychophysiological detection of deception, also known as the polygraph test, which is currently a part of standard practices of law enforcement agencies and several other institutions worldwide. Although its validity is far from gathering consensus, the underlying psychophysiological principles are still an interesting add-on for more informal applications. In this paper we present an experimental off-the-person hardware setup, propose a set of feature extraction criteria and provide a comparison of two classification approaches, targeting the detection of deception in the context of a role-playing interactive multimedia environment. Our work is primarily targeted at recreational use in the context of a science exhibition, where the main goal is to present basic concepts related with knowledge discovery, biosignal analysis and psychophysiology in an educational way, using techniques that are simple enough to be understood by children of different ages. Nonetheless, this setting will also allow us to build a significant data corpus, annotated with ground-truth information, and collected with non-intrusive sensors, enabling more advanced research on the topic. Experimental results have shown interesting findings and provided useful guidelines for future work. Pattern Recognition
Resumo:
Relatório de Estágio apresentado à Escola Superior de Educação de Lisboa para obtenção de grau de mestre em Enisno do 1.º e 2.º Ciclo do Ensino Básico
Resumo:
In this paper, we analyse the ability of Profibus fieldbus to cope with the real-time requirements of a Distributed Computer Control System (DCCS), where messages associated to discrete events must be made available within a maximum bound time. Our methodology is based on the knowledge of real-time traffic characteristics, setting the network parameters in order to cope with timing requirements. Since non-real-time traffic characteristics are usually unknown at the design stage, we consider an operational profile where, constraining non-real-time traffic at the application level, we assure that realtime requirements are met.
Resumo:
Relatório de estágio apresentado à Escola Superior de Comunicação Social como parte dos requisitos para obtenção de grau de mestre em Jornalismo.
Resumo:
Contrary to fungi, exposure to mycotoxins is not usually identified as a risk factor present in occupational settings. This is probably due to the inexistence of limits regarding concentration of airborne mycotoxins, and also due to the fact that these compounds are rarely monitored in occupational environments. Despite the optimal conditions for fungal growth and, consequently, for mycotoxins production in all the waste management chain, only a few articles were dedicated to study occupational exposure to mycotoxins in this occupational setting. Aim of study: A study was developed in Portugal aiming to assess occupational co-exposure to mycotoxins in the waste management setting.
Resumo:
Dissertação apresentada na Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para obtenção do grau de Mestre em Engenharia Informática
Resumo:
Separata do Tomo XXXVIII das Memories da Academia das Ciencias de Lisboa (Classe de Ciencias)
Resumo:
Dissertação apresentada à Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para obtenção do grau de Mestre em Engenharia do Ambiente, Gestão de Sistemas Ambientais
Resumo:
Mestrado integrado em Engenharia do Ambiente, perfil: Gestão de Sistemas Ambientais
Resumo:
We consider a quantity-setting duopoly model, and we study the decision to move first or second, by assuming that the firms produce differentiated goods and that there is some demand uncertainty. The competitive phase consists of two periods, and in either period, the firms can make a production decision that is irreversible. As far as the firms are allowed to choose (non-cooperatively) the period they make the decision, we study the circumstances that favour sequential rather than simultaneous decisions.
Resumo:
Published also at Lecture Notes in Engineering and Computer Science
Resumo:
Presentemente, com a economia cada vez mais globalizada e com a grande competitividade do mercado, as empresas de produção procuram cada vez mais ajustar-se às exigências dos clientes. Por esse motivo, o controlo do fluxo produtivo torna-se imprescindível para a resolução de problemas e para a própria melhoria contínua do processo. O sistema “Lean Manufacturing”, é um conjunto de atividades que tem como meta o aumento da capacidade de resposta às mudanças e à minimização dos desperdícios na produção, constituindo-se num verdadeiro empreendimento de gestão inovadora. O TPM – Total Productive Maintenance, é uma ferramenta de melhoria continua cada vez mais utilizada nas empresas com o objetivo de melhorar a eficiência dos seus equipamentos e atingir metas para a redução de desperdícios, incluindo a restauração e manutenção de condições padrão de funcionamento. O presente trabalho visa a implementação da ferramenta TPM num equipamento (Serrote Mecânico Alternativo) instalado no Laboratório das Oficinas Mecânicas do Instituto Superior de Engenharia do Porto. No contexto prático, este trabalho consistiu numa primeira fase por implementar a ferramenta 5S´s no posto de trabalho do equipamento em estudo. Durante esta implementação foi possível detetar algumas anomalias no equipamento, tendo sido sujeitas a uma análise para encontrar as suas causas raiz. Posteriormente foi implementada a ferramenta TPM, de modo, a criar melhores condições de acesso e simplificação das atividades de inspeção, lubrificação e limpeza. Além disso, foi executado e proposto algumas oportunidades de melhoria em alguns elementos, de forma a reduzir tempos de operação e tempos de setup, contribuindo para o aumento da eficiência do equipamento.