943 resultados para zero
Resumo:
An analysis of a modified series-L/parallel-tuned Class-E power amplifier is presented, which includes the effects that a shunt capacitance placed across the switching device will have on Class-E behaviour. In the original series L/parallel-tuned topology in which the output transistor capacitance is not inherently included in the circuit, zero-current switching (ZCS) and zero-current derivative switching (ZCDS) conditions should be applied to obtain optimum Class-E operation. On the other hand, when the output transistor capacitance is incorporated in the circuit, i.e. in the modified series-L/parallel-tuned topology, the ZCS and ZCDS would not give optimum operation and therefore zero-voltage-switching (ZVS) and zero-voltage-derivative switching (ZVDS) conditions should be applied instead. In the modified series-L/parallel-tuned Class-E configuration, the output-device inductance and the output-device output capacitance, both of which can significantly affect the amplifier's performance at microwave frequencies, furnish part, if not all, of the series inductance L and the shunt capacitance COUT, respectively. Further, when compared with the classic shunt-C/series-tuned topology, the proposed Class-E configuration offers some advantages in terms of 44% higher maximum operating frequency (fMAX) and 4% higher power-output capability (PMAX). As in the classic topology, the fMAX of the proposed amplifier circuit is reached when the output-device output capacitance furnishes all of the capacitance COUT, for a given combination of frequency, output power and DC supply voltage. It is also shown that numerical simulations agree well with theoretical predictions.
Resumo:
The Monkstown Fe0 PRB, Europe’s oldest commercially installed PRB, had been treating trichloroethene (TCE) contaminated groundwater for about 10 years on the Nortel Network site in Northern Ireland when cores were collected in December, 2006. Groundwater data from 2001-2006 indicated that TCE is being remediated to below detection limits as the contaminated groundwater flows through the PRB, Ca and Fe carbonates, crystalline and amorphous FeS, and Fe (oxy)hydroxides precipitates are present in the Fe0 filing material within the PRB. A greater variety of minerals are associated with a 1 cm thick slightly cemented crust at the entrance of the Fe0 section of the reactive vessel and the discontinuous cemented Fe0 material directly below it. Also, a greater presence of microbial communities occurred in the upper portion of the PRB compared to the lower section which might be due to less favourable conditions (i.e. high pH, low oxygen) for microbial growth in the lower section of the PRB. Visual estimation suggests that the Fe0 filings in the effluent section of the PRB have life-span of 10+ years compared to the Fe0 filings in the thin influent section of the PRB which may have a life span of only ~2-5 more years. Multi-tracer tests indicated that preferential pathways have formed in this PRB over the 10 years of operation.
Resumo:
We study two-dimensional Banach spaces with polynomial numerical indices equal to zero.
Resumo:
An extension of the pole-zero matching method proposed by Stefano Maci et al. for the analysis of electromagnetic bandgap (EBG) structures composed by lossless dipole-based frequency selective surfaces (FSS) printed on stratified dielectric media, is presented in this paper. With this novel expansion, the dipoles length appears as a variable in the analytical dispersion equation. Thus, modal dispersion curves as a function of the dipoles length can be easily obtained with the only restriction of single Floquet mode propagation. These geometry-dispersion curves are essential for the efficient analysis and design of practical EBG structures, such as waveguides loaded with artificial magnetic conductors (AMC) for miniaturization, or leaky-wave antennas (LWA) using partially reflective surfaces (PRS). These two practical examples are examined in this paper. Results are compared with full-wave 2D and 3D simulations showing excellent agreement, thus validating the proposed technique and illustrating its utility for practical designs.