888 resultados para Learning-Management-System


Relevância:

100.00% 100.00%

Publicador:

Resumo:

A prominent theme emerging in Occupational Health and Safety (OSH) is the development of management systems. A range of interventions, according to a prescribed route detailed by one of the management systems, can be introduced into an organisation with some expectation of improved OSH performance. This thesis attempts to identify the key influencing factors that may impact upon the process of introducing interventions, (according to B88800: 1996, Guide to Implementing Occupational Health and Safety Management Systems) into an organisation. To help identify these influencing factors a review of possible models from the sphere of Total Quality Management (TQM) was undertaken and the most suitable TQM model selected for development and use in aSH. By anchoring the aSH model's development in the reviewed literature a range ofeare, medium and low level influencing factors were identified. This model was developed in conjunction with the research data generated within the case study organisation (rubber manufacturer) and applied to the organisation. The key finding was that the implementation of an OSH intervention was dependant upon three broad vectors of influence. These are the Incentive to introduce change within an organisation which refers to the drivers or motivators for OSH. Secondly the Ability within the management team to actually implement the changes refers to aspects, amongst others, such as leadership, commitment and perceptions of OSH. Ability is in turn itself influenced by the environment within which change is being introduced. TItis aspect of Receptivity refers to the history of the plant and characteristics of the workforce. Aspects within Receptivity include workforce profile and organisational policies amongst others. It was found that the TQM model selected and developed for an OSH management system intervention did explain the core influencing factors and their impact upon OSH performance. It was found that within the organisation the results that may have been expected from implementation of BS8800:1996 were not realised. The OSH model highlighted that given the organisation's starting point, a poor appreciation of the human factors of OSH, gave little reward for implementation of an OSH management system. In addition it was found that general organisational culture can effectively suffocate any attempts to generate a proactive safety culture.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis describes the development of an operational river basin water resources information management system. The river or drainage basin is the fundamental unit of the system; in both the modelling and prediction of hydrological processes, and in the monitoring of the effect of catchment management policies. A primary concern of the study is the collection of sufficient and sufficiently accurate information to model hydrological processes. Remote sensing, in combination with conventional point source measurement, can be a valuable source of information, but is often overlooked by hydrologists, due to the cost of acquisition and processing. This thesis describes a number of cost effective methods of acquiring remotely sensed imagery, from airborne video survey to real time ingestion of meteorological satellite data. Inexpensive micro-computer systems and peripherals are used throughout to process and manipulate the data. Spatial information systems provide a means of integrating these data with topographic and thematic cartographic data, and historical records. For the system to have any real potential the data must be stored in a readily accessible format and be easily manipulated within the database. The design of efficient man-machine interfaces and the use of software enginering methodologies are therefore included in this thesis as a major part of the design of the system. The use of low cost technologies, from micro-computers to video cameras, enables the introduction of water resources information management systems into developing countries where the potential benefits are greatest.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT

Relevância:

100.00% 100.00%

Publicador:

Resumo:

DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Completing projects faster than normal is always a challenge as it often demands many paradigm shifts. Globalization opportunities and competition from private sectors and multinationals are forcing the management of public sector organizations in India's petroleum industry to take various aggressive strategies to maintain profitability. These projects are required to be completed sooner than with a typical schedule to remain competitive, get faster return on investment and give longer project life.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Article suggests an approach to designing the Human Resources Intellectual Management System in order to increase Human Resources reliability, using the management methods known from the Theory of Management.. The Article examines the realization of the Subsystem of implementing management methods by the number of management procedures, executing the corresponding management method.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this paper a flexible approach to design LMS with QTI Ready component based on the e-Learning standards AICC and IMS QTI is described. This system and component permits a dynamic learning and assessment process. QTI Ready component can provide these facilities to other real world virtual learning management system.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Article suggests a possible approach to creation of the Intellectual Management System for human resources and personnel (during their professional tasks solving), and that could consider personal characteristics and psychological condition of the human resources as an “unreliable” element. The Article describes some elements of the Intellectual Management System: professional activity model and “unreliable” element (human resources) model.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Recent technological advances have paved the way for developing and offering advanced services for the stakeholders in the agricultural sector. A paradigm shift is underway from proprietary and monolithic tools to Internet-based, cloud hosted, open systems that will enable more effective collaboration between stakeholders. This new paradigm includes the technological support of application developers to create specialized services that will seamlessly interoperate, thus creating a sophisticated and customisable working environment for the end users. We present the implementation of an open architecture that instantiates such an approach, based on a set of domain independent software tools called "generic enablers" that have been developed in the context of the FI-WARE project. The implementation is used to validate a number of innovative concepts for the agricultural sector such as the notion of a services' market place and the system's adaptation to network failures. During the design and implementation phase, the system has been evaluated by end users, offering us valuable feedback. The results of the evaluation process validate the acceptance of such a system and the need of farmers to have access to sophisticated services at affordable prices. A summary of this evaluation process is also presented in this paper. © 2013 Elsevier B.V.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Report published in the Proceedings of the National Conference on "Education and Research in the Information Society", Plovdiv, May, 2015

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In his study - Evaluating and Selecting a Property Management System - by Galen Collins, Assistant Professor, School of Hotel and Restaurant Management, Northern Arizona University, Assistant Professor Collins states briefly at the outset: “Computerizing a property requires a game plan. Many have selected a Property Management System without much forethought and have been unhappy with the final results. The author discusses the major factors that must be taken into consideration in the selection of a PMS, based on his personal experience.” Although, this article was written in the year 1988 and some information contained may be dated, there are many salient points to consider. “Technological advances have encouraged many hospitality operators to rethink how information should be processed, stored, retrieved, and analyzed,” offers Collins. “Research has led to the implementation of various cost-effective applications addressing almost every phase of operations,” he says in introducing the computer technology germane to many PMS functions. Professor Collins talks about the Request for Proposal, its conditions and its relevance in negotiating a PMS system. The author also wants the system buyer to be aware [not necessarily beware] of vendor recommendations, and not to rely solely on them. Exercising forethought will help in avoiding the drawback of purchasing an inadequate PMS system. Remember, the vendor is there first and foremost to sell you a system. This doesn’t necessarily mean that the adjectives unreliable and unethical are on the table, but do be advised. Professor Collins presents a graphic outline for the Weighted Average Approach to Scoring Vendor Evaluations. Among the elements to be considered in evaluating a PMS system, and there are several analyzed in this essay, Professor Collins advises that a perspective buyer not overlook the service factor when choosing a PMS system. Service is an important element to contemplate. “In a hotel environment, the special emphasis should be on service. System downtime can be costly and aggravating and will happen periodically,” Collins warns. Professor Collins also examines the topic of PMS system environment; of which the importance of such a factor should not be underestimated. “The design of the computer system should be based on the physical layout of the property and the projected workloads. The heart of the system, housed in a protected, isolated area, can support work stations strategically located throughout the property,” Professor Collins provides. A Property Profile Description is outlined in Table 1. The author would also point out that ease-of-operation is another significant factor to think about. “A user-friendly software package allows the user to easily move through the program without encountering frustrating obstacles,” says Collins. “Programs that require users to memorize abstract abbreviations, codes, and information to carry out standard routines should be avoided,” he counsels.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Summit Music Management är ett managementföretag som arbetar med en rad svenska artister. I deras arbetsuppgifter ingår även hantering av artisternas webbplatser, ett arbete som visat sig vara säkerhetskänsligt och svårt att få klart. Målet med projektet har varit att utveckla ett Content Management System för aktörer inom musikbranschen, vars syfte det är att förenkla det dagliga arbetet av dessa webbplatser. Systemet ska innehålla funktionalitet som gör det möjligt att skapa webbplatser åt artisterna samtidigt som det ska gå att underhålla och uppdatera textmaterial såväl som bilder som finns på webbplatserna. Systemet har skapats med tekniker, språk och ramverk som finns tillgängliga under fria licensavtal. Systemets grund är skapat med PHP-ramverket Laravel tillsammans med HTML, CSS och Twitter Bootstrap. Denna del fungerar som gränssnitt för administratörer där användaren kan logga in och skapa webbplatser. De webb-platser som skapas av systemet är skrivna i AngularJS tillsammans med HTML, CSS och Twitter Bootstrap. Mellan dessa delar finns ett REST-api skrivet i Laravel som sköter kommunikationen mellan komponenterna. Systemet arbetar mot en MySQL-databas där all data lagras och hämtas ifrån. Summit Music Management har förutom att leverera text- och bildmaterial, även fungerat somtestpanel för att kunna mäta systemets användbarhet. Testerna visade att systemet kan möta de behov som finns hos Summit Music Management men att det kan komma att behöva vidareutvecklas för att bättre passa en större kundgrupp och för att strama åt säkerhetsaspekterna ytterligare.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This Strategic Plan provides the Iowa Department of Transportation with guidelines for defining the acquisition and implementation of a document management system to automate current manual methods of document handling and distribution. In preparation for the production of the Strategic Plan, the USI Team conducted a series of user interviews at the DOT Ames and East Central Iowa Transportation Region facilities, and reviewed various documents relating to day-to-day operations.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose of Records Management Sysytem indexing standards document is to develop indexing standards that will best support Iowa DOT's effort to build an agency-wide Records Management System

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Iowa Department of Transportation began preparation for the acquisition of an electronic document management system in 1996. The first phase was development of a strategic plan. The plan provided guidelines for defining the acquisition and implementation of a document management system to automate document handling and distribution. Phase 2 involved developing draft standards (document, indexing and technology) for planning and implementation of a document management system. These standards were to identify existing industry standards and determine which standards would best support the specific requirements of the Iowa Department of Transportation. During development of these standards, the decision was made to enlarge the scope of this effort from a document management system to a records management system (RMS). Phase .3 identified business processes that were to be further developed as pilot projects of a much larger agency-wide records management system.