947 resultados para Electric networks - Planning


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Community involvement in the fields of town planning and urban regeneration includes a wide range of opportunities for residents and service users to engage with networks, partnerships and centres of power. Both the terminology and degree of the transfer of power to citizens varies in different policy areas and contexts but five core objectives can be identified. This article approaches the subject of community empowerment by exploring the theoretical literature; reviewing recent policy pronouncements relating to community involvement in England and by discussing a recent case study of an Urban II project in London. The conclusions suggest that community empowerment is always likely to be partial and contingent on local circumstances and the wider context.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Electric vehicles introduction will affect cities environment and urban mobility policies. Network system operators will have to consider the electric vehicles in planning and operation activities due to electric vehicles’ dependency on the electricity grid. The present paper presents test cases using an Electric Vehicle Scenario Simulator (EVeSSi) being developed by the authors. The test cases include two scenarios considering a 33 bus network with up to 2000 electric vehicles in the urban area. The scenarios consider a penetration of 10% of electric vehicles (200 of 2000), 30% (600) and 100% (2000). The first scenario will evaluate network impacts and the second scenario will evaluate CO2 emissions and fuel consumption.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper addresses the problem of energy resource scheduling. An aggregator will manage all distributed resources connected to its distribution network, including distributed generation based on renewable energy resources, demand response, storage systems, and electrical gridable vehicles. The use of gridable vehicles will have a significant impact on power systems management, especially in distribution networks. Therefore, the inclusion of vehicles in the optimal scheduling problem will be very important in future network management. The proposed particle swarm optimization approach is compared with a reference methodology based on mixed integer non-linear programming, implemented in GAMS, to evaluate the effectiveness of the proposed methodology. The paper includes a case study that consider a 32 bus distribution network with 66 distributed generators, 32 loads and 50 electric vehicles.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Important research effort has been devoted to the topic of optimal planning of distribution systems. The non linear nature of the system, the need to consider a large number of scenarios and the increasing necessity to deal with uncertainties make optimal planning in distribution systems a difficult task. Heuristic techniques approaches have been proposed to deal with these issues, overcoming some of the inherent difficulties of classic methodologies. This paper considers several methodologies used to address planning problems of electrical power distribution networks, namely mixedinteger linear programming (MILP), ant colony algorithms (AC), genetic algorithms (GA), tabu search (TS), branch exchange (BE), simulated annealing (SA) and the Bender´s decomposition deterministic non-linear optimization technique (BD). Adequacy of theses techniques to deal with uncertainties is discussed. The behaviour of each optimization technique is compared from the point of view of the obtained solution and of the methodology performance. The paper presents results of the application of these optimization techniques to a real case of a 10-kV electrical distribution system with 201 nodes that feeds an urban area.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Tese de Doutoramento, Ciências do Mar (Biologia Marinha)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this work a mixed integer optimization linear programming (MILP) model was applied to mixed line rate (MLR) IP over WDM and IP over OTN over WDM (with and without OTN grooming) networks, with aim to reduce network energy consumption. Energy-aware and energy-aware & short-path routing techniques were used. Simulations were made based on a real network topology as well as on forecasts of traffic matrix based on statistical data from 2005 up to 2017. Energy aware routing optimization model on IPoWDM network, showed the lowest energy consumption along all years, and once compared with energy-aware & short-path routing, has led to an overall reduction in energy consumption up to 29%, expecting to save even more than shortest-path routing. © 2014 IEEE.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Load forecasting has gradually becoming a major field of research in electricity industry. Therefore, Load forecasting is extremely important for the electric sector under deregulated environment as it provides a useful support to the power system management. Accurate power load forecasting models are required to the operation and planning of a utility company, and they have received increasing attention from researches of this field study. Many mathematical methods have been developed for load forecasting. This work aims to develop and implement a load forecasting method for short-term load forecasting (STLF), based on Holt-Winters exponential smoothing and an artificial neural network (ANN). One of the main contributions of this paper is the application of Holt-Winters exponential smoothing approach to the forecasting problem and, as an evaluation of the past forecasting work, data mining techniques are also applied to short-term Load forecasting. Both ANN and Holt-Winters exponential smoothing approaches are compared and evaluated.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The high penetration of distributed energy resources (DER) in distribution networks and the competitiveenvironment of electricity markets impose the use of new approaches in several domains. The networkcost allocation, traditionally used in transmission networks, should be adapted and used in the distribu-tion networks considering the specifications of the connected resources. The main goal is to develop afairer methodology trying to distribute the distribution network use costs to all players which are usingthe network in each period. In this paper, a model considering different type of costs (fixed, losses, andcongestion costs) is proposed comprising the use of a large set of DER, namely distributed generation(DG), demand response (DR) of direct load control type, energy storage systems (ESS), and electric vehi-cles with capability of discharging energy to the network, which is known as vehicle-to-grid (V2G). Theproposed model includes three distinct phases of operation. The first phase of the model consists in aneconomic dispatch based on an AC optimal power flow (AC-OPF); in the second phase Kirschen’s andBialek’s tracing algorithms are used and compared to evaluate the impact of each resource in the net-work. Finally, the MW-mile method is used in the third phase of the proposed model. A distributionnetwork of 33 buses with large penetration of DER is used to illustrate the application of the proposedmodel.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The use of Electric Vehicles (EVs) will change significantly the planning and management of power systems in a near future. This paper proposes a real-time tariff strategy for the charge process of the EVs. The main objective is to evaluate the influence of real-time tariffs in the EVs owners’ behaviour and also the impact in load diagram. The paper proposes the energy price variation according to the relation between wind generation and power consumption. The proposed strategy was tested in two different days in the Danish power system. January 31st and August 13th 2013 were selected because of the high quantities of wind generation. The main goal is to evaluate the changes in the EVs charging diagram with the energy price preventing wind curtailment.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The development in power systems and the introduction of decentralized generation and Electric Vehicles (EVs), both connected to distribution networks, represents a major challenge in the planning and operation issues. This new paradigm requires a new energy resources management approach which considers not only the generation, but also the management of loads through demand response programs, energy storage units, EVs and other players in a liberalized electricity markets environment. This paper proposes a methodology to be used by Virtual Power Players (VPPs), concerning the energy resource scheduling in smart grids, considering day-ahead, hour-ahead and real-time scheduling. The case study considers a 33-bus distribution network with high penetration of distributed energy resources. The wind generation profile is based on a real Portuguese wind farm. Four scenarios are presented taking into account 0, 1, 2 and 5 periods (hours or minutes) ahead of the scheduling period in the hour-ahead and realtime scheduling.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The present study explores relationships between project marketers and their customers in project marketing context. The purpose of the study is to increase the understanding on supplier’s position in project marketing networks. Project marketing is representing a high volume in the international business, and the industrial network approach and the project marketing research cannot fully explain a supplier’s position in project marketing networks. Increased knowledge on project networks can also contribute to industrial marketing research more generally. Data for the present study was collected firstly during the pilot case study from project buyers in the paper and the steel industry in interviews. Secondly an entire project marketing case concerning a steel industry case was used as a data source. The data included interviews, correspondence between the supplier and the buyer, and project documents. The data of the pilot case was analysed with contents analysis, and in the case a deeper analysis based on the developed Stage Dimension framework was used. Supplier’s position in project marketing networks is a hierarchical and dynamic concept including a supplier’s position on the highest level. The dimensions of the position concept are the intermediate level, and the dimensions are based on the underlying components. Supplier’s position is composed from four organization related dimensions, and two individual actor related dimensions. The composition of the supplier’s position varies during the project marketing process, and consequently the relative importance of the dimensions is changing over the process. Supplier’s position in project marketing networks is shaped by incremental and radical changes. Radical changes are initiated by critical events. The study contributes to the research of industrial networks and project marketing. The theoretical contribution of the study is threefold: firstly it proposes a structure of the position concept in project marketing networks, secondly it proposes the Position Stage Dimension Component (PSDC) model for the development of supplier’s position during the project marketing process, and thirdly the study widens the critical event concept to cover the project marketing process both on the organizational and individual level. In addition to the theoretical contributions there are several managerial implications for planning and implementing marketing strategies in the project context.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Le projet de recherche porte sur l'étude des problèmes de conception et de planification d'un réseau optique de longue distance, aussi appelé réseau de coeur (OWAN-Optical Wide Area Network en anglais). Il s'agit d'un réseau qui transporte des flots agrégés en mode commutation de circuits. Un réseau OWAN relie différents sites à l'aide de fibres optiques connectées par des commutateurs/routeurs optiques et/ou électriques. Un réseau OWAN est maillé à l'échelle d'un pays ou d’un continent et permet le transit des données à très haut débit. Dans une première partie du projet de thèse, nous nous intéressons au problème de conception de réseaux optiques agiles. Le problème d'agilité est motivé par la croissance de la demande en bande passante et par la nature dynamique du trafic. Les équipements déployés par les opérateurs de réseaux doivent disposer d'outils de configuration plus performants et plus flexibles pour gérer au mieux la complexité des connexions entre les clients et tenir compte de la nature évolutive du trafic. Souvent, le problème de conception d'un réseau consiste à prévoir la bande passante nécessaire pour écouler un trafic donné. Ici, nous cherchons en plus à choisir la meilleure configuration nodale ayant un niveau d'agilité capable de garantir une affectation optimale des ressources du réseau. Nous étudierons également deux autres types de problèmes auxquels un opérateur de réseau est confronté. Le premier problème est l'affectation de ressources du réseau. Une fois que l'architecture du réseau en termes d'équipements est choisie, la question qui reste est de savoir : comment dimensionner et optimiser cette architecture pour qu'elle rencontre le meilleur niveau possible d'agilité pour satisfaire toute la demande. La définition de la topologie de routage est un problème d'optimisation complexe. Elle consiste à définir un ensemble de chemins optiques logiques, choisir les routes physiques suivies par ces derniers, ainsi que les longueurs d'onde qu'ils utilisent, de manière à optimiser la qualité de la solution obtenue par rapport à un ensemble de métriques pour mesurer la performance du réseau. De plus, nous devons définir la meilleure stratégie de dimensionnement du réseau de façon à ce qu'elle soit adaptée à la nature dynamique du trafic. Le second problème est celui d'optimiser les coûts d'investissement en capital(CAPEX) et d'opération (OPEX) de l'architecture de transport proposée. Dans le cas du type d'architecture de dimensionnement considérée dans cette thèse, le CAPEX inclut les coûts de routage, d'installation et de mise en service de tous les équipements de type réseau installés aux extrémités des connexions et dans les noeuds intermédiaires. Les coûts d'opération OPEX correspondent à tous les frais liés à l'exploitation du réseau de transport. Étant donné la nature symétrique et le nombre exponentiel de variables dans la plupart des formulations mathématiques développées pour ces types de problèmes, nous avons particulièrement exploré des approches de résolution de type génération de colonnes et algorithme glouton qui s'adaptent bien à la résolution des grands problèmes d'optimisation. Une étude comparative de plusieurs stratégies d'allocation de ressources et d'algorithmes de résolution, sur différents jeux de données et de réseaux de transport de type OWAN démontre que le meilleur coût réseau est obtenu dans deux cas : une stratégie de dimensionnement anticipative combinée avec une méthode de résolution de type génération de colonnes dans les cas où nous autorisons/interdisons le dérangement des connexions déjà établies. Aussi, une bonne répartition de l'utilisation des ressources du réseau est observée avec les scénarios utilisant une stratégie de dimensionnement myope combinée à une approche d'allocation de ressources avec une résolution utilisant les techniques de génération de colonnes. Les résultats obtenus à l'issue de ces travaux ont également démontré que des gains considérables sont possibles pour les coûts d'investissement en capital et d'opération. En effet, une répartition intelligente et hétérogène de ressources d’un réseau sur l'ensemble des noeuds permet de réaliser une réduction substantielle des coûts du réseau par rapport à une solution d'allocation de ressources classique qui adopte une architecture homogène utilisant la même configuration nodale dans tous les noeuds. En effet, nous avons démontré qu'il est possible de réduire le nombre de commutateurs photoniques tout en satisfaisant la demande de trafic et en gardant le coût global d'allocation de ressources de réseau inchangé par rapport à l'architecture classique. Cela implique une réduction substantielle des coûts CAPEX et OPEX. Dans nos expériences de calcul, les résultats démontrent que la réduction de coûts peut atteindre jusqu'à 65% dans certaines jeux de données et de réseau.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

De nombreux problèmes pratiques qui se posent dans dans le domaine de la logistique, peuvent être modélisés comme des problèmes de tournées de véhicules. De façon générale, cette famille de problèmes implique la conception de routes, débutant et se terminant à un dépôt, qui sont utilisées pour distribuer des biens à un nombre de clients géographiquement dispersé dans un contexte où les coûts associés aux routes sont minimisés. Selon le type de problème, un ou plusieurs dépôts peuvent-être présents. Les problèmes de tournées de véhicules sont parmi les problèmes combinatoires les plus difficiles à résoudre. Dans cette thèse, nous étudions un problème d’optimisation combinatoire, appartenant aux classes des problèmes de tournées de véhicules, qui est liée au contexte des réseaux de transport. Nous introduisons un nouveau problème qui est principalement inspiré des activités de collecte de lait des fermes de production, et de la redistribution du produit collecté aux usines de transformation, pour la province de Québec. Deux variantes de ce problème sont considérées. La première, vise la conception d’un plan tactique de routage pour le problème de la collecte-redistribution de lait sur un horizon donné, en supposant que le niveau de la production au cours de l’horizon est fixé. La deuxième variante, vise à fournir un plan plus précis en tenant compte de la variation potentielle de niveau de production pouvant survenir au cours de l’horizon considéré. Dans la première partie de cette thèse, nous décrivons un algorithme exact pour la première variante du problème qui se caractérise par la présence de fenêtres de temps, plusieurs dépôts, et une flotte hétérogène de véhicules, et dont l’objectif est de minimiser le coût de routage. À cette fin, le problème est modélisé comme un problème multi-attributs de tournées de véhicules. L’algorithme exact est basé sur la génération de colonnes impliquant un algorithme de plus court chemin élémentaire avec contraintes de ressources. Dans la deuxième partie, nous concevons un algorithme exact pour résoudre la deuxième variante du problème. À cette fin, le problème est modélisé comme un problème de tournées de véhicules multi-périodes prenant en compte explicitement les variations potentielles du niveau de production sur un horizon donné. De nouvelles stratégies sont proposées pour résoudre le problème de plus court chemin élémentaire avec contraintes de ressources, impliquant dans ce cas une structure particulière étant donné la caractéristique multi-périodes du problème général. Pour résoudre des instances de taille réaliste dans des temps de calcul raisonnables, une approche de résolution de nature heuristique est requise. La troisième partie propose un algorithme de recherche adaptative à grands voisinages où de nombreuses nouvelles stratégies d’exploration et d’exploitation sont proposées pour améliorer la performances de l’algorithme proposé en termes de la qualité de la solution obtenue et du temps de calcul nécessaire.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This thesis entitled “Development planning at the state level in india a case study with reference to kerala1957-84.Planning in India is a concurrent subject with the Centre and the States having well-defined domains of jurisdiction with regard to planning functions and sources of resource mobilisation.The genesis of the lack of academic interest in state level planning is in the widely held belief that in the extent scheme of Centre-State economic relations, the states have little scope for initiative in planning.Both at the theoretical and empirical levels, Kerala has attached very great importance to planning.It has been the localeof wide and deep discussions on the various dimensions of planning.In Kerala's development process, the leading sector consists of social services such as education and public healthOne point that needs special emphasis in this regard is that the high demand for education in Kerala cannot be attributed to the Keralites' ‘unique urge‘ for education. Rather, it is related to the very high level of unemployment in the state (Kerala has the highest level of unemployment in the country.In resource allocation under the Five Year Plans, Kerala attached the highest weightage to power generation, hydro-electric projects being the major source of power in the state. Nearly one-fourth of the plan resources has been claimed by hydro-electric projects.In the agricultural sector, Kera1a's level of productive use of electric power is one of the lowest.As is evident.from above, planning in Kerala has not enabled us to solve the basic problems of the state. More 'scientific' planning in the sense of applying mre sophisticated planning techniques is obviously not the answer. It, on the contrary, consists of more fundamental changes some of which can be brought about through an effective use of measures well within the power of the State Government.