923 resultados para Distributed Traffic Control


Relevância:

80.00% 80.00%

Publicador:

Resumo:

Pregnant women have a 2-3 fold higher probability of developing restless legs syndrome (RLS - sleep-related movement disorders) than general population. This study aims to evaluate the behavior and locomotion of rats during pregnancy in order to verify if part of these animals exhibit some RLS-like features. We used 14 female 80-day-old Wistar rats that weighed between 200 and 250 g. The rats were distributed into control (CTRL) and pregnant (PN) groups. After a baseline evaluation of their behavior and locomotor activity in an open-field environment, the PN group was inducted into pregnancy, and their behavior and locomotor activity were evaluated on days 3, 10 and 19 of pregnancy and in the post-lactation period in parallel with the CTRL group. The serum iron and transferrin levels in the CTRL and PN groups were analyzed in blood collected after euthanasia by decapitation. There were no significant differences in the total ambulation, grooming events, fecal boli or urine pools between the CTRL and PN groups. However, the PN group exhibited fewer rearing events, increased grooming time and reduced immobilization time than the CTRL group (ANOVA, p<0.05). These results suggest that pregnant rats show behavioral and locomotor alterations similar to those observed in animal models of RLS, demonstrating to be a possible animal model of this sleep disorder.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Universidade Estadual de Campinas . Faculdade de Educação Física

Relevância:

80.00% 80.00%

Publicador:

Resumo:

O crescente número de automóveis nas ruas das grandes cidades, assim como o crescente número de transportes urbanos para atender o crescimento das populações, veio fazer com que as cidades cada vez mais fiquem mais congestionadas e mais propícias para acidentes envolvendo viaturas e peões. Devido a isso, foram criados sistemas de controlo de tráfego capazes de melhorar o tráfego urbano nas cidades, sem deixar de lado as preocupações com os peões e nem com as emissões de poluentes para o ar. Baseado nesse cenário, este trabalho tem como objetivo abordar as possíveis soluções existentes no mercado para melhorar o fluxo das viaturas, principalmente dos transportes colectivos, com prioridades para viaturas de emergências e autocarros, assim como, as passagens de peões, e sistemas de mobilidade urbana. Desempenho do transporte público pode ser melhorado através de um melhor controlo e gerenciamento de tráfego em geral. Nos testes realizados em campo: foi medida a velocidade de viagem do autocarro no cruzamento fixo (Praça de Espanha), e correlacionando-os com intervalos do ciclo dos semáforos para este cruzamento. A flexibilidade do controlador actuando, com o auxílio de detectores de veículos, sendo capaz de variar os intervalos dentro do ciclo, bem como o volume de carros e de prestações em velocidade de viagem do autocarro. Resultados mostram que, durante o período em estudo, os benefícios de velocidade da viagem do autocarro, seria possível, através de um verdadeiro controlo de tempo feedback de cooperação entre as áreas urbanas de controlo de tráfego (Gertrude) e do sistema de localização de veículos de transportes públicos (SAEIP). Ao longo prazo, sugerimos a implantação de um sistema integrado. Fazendo com que o volume no carro seja reduzido. Este efeito leva também, a um aumento da velocidade comercial do autocarro urbano, da mesma forma como foi proposto em nossa experiência.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Currently, power systems (PS) already accommodate a substantial penetration of distributed generation (DG) and operate in competitive environments. In the future, as the result of the liberalisation and political regulations, PS will have to deal with large-scale integration of DG and other distributed energy resources (DER), such as storage and provide market agents to ensure a flexible and secure operation. This cannot be done with the traditional PS operational tools used today like the quite restricted information systems Supervisory Control and Data Acquisition (SCADA) [1]. The trend to use the local generation in the active operation of the power system requires new solutions for data management system. The relevant standards have been developed separately in the last few years so there is a need to unify them in order to receive a common and interoperable solution. For the distribution operation the CIM models described in the IEC 61968/70 are especially relevant. In Europe dispersed and renewable energy resources (D&RER) are mostly operated without remote control mechanisms and feed the maximal amount of available power into the grid. To improve the network operation performance the idea of virtual power plants (VPP) will become a reality. In the future power generation of D&RER will be scheduled with a high accuracy. In order to realize VPP decentralized energy management, communication facilities are needed that have standardized interfaces and protocols. IEC 61850 is suitable to serve as a general standard for all communication tasks in power systems [2]. The paper deals with international activities and experiences in the implementation of a new data management and communication concept in the distribution system. The difficulties in the coordination of the inconsistent developed in parallel communication and data management standards - are first addressed in the paper. The upcoming unification work taking into account the growing role of D&RER in the PS is shown. It is possible to overcome the lag in current practical experiences using new tools for creating and maintenance the CIM data and simulation of the IEC 61850 protocol – the prototype of which is presented in the paper –. The origin and the accuracy of the data requirements depend on the data use (e.g. operation or planning) so some remarks concerning the definition of the digital interface incorporated in the merging unit idea from the power utility point of view are presented in the paper too. To summarize some required future work has been identified.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Mestrado em Engenharia Electrotécnica e de Computadores

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Mestrado em Engenharia Informática

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Dissertação para obtenção do grau de Mestre em Engenharia Electrotécnica Ramo de Automação e Electrónica Industrial

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Relatório de Estágio para obtenção do grau de Mestre em Engenharia Civil na Área de Especialização de Vias de Comunicação e Transportes

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Recent developments in the factory floor technologies together with the widespread use of TCP/IP and the Internet are increasing the eagerness to support a new wide class of devices and applications, such as industrial multimedia applications, in factory floor networks. This paper presents how this new field of applications can be put into practice, via a manufacturing cell field trial being implemented. This manufacturing automation field trial involves the use of traditional distributed computer control systems and 'factory-floor-oriented' multimedia (e.g. voice, video) application services.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Multi-agent architectures are well suited for complex inherently distributed problem solving domains. From the many challenging aspects that arise within this framework, a crucial one emerges: how to incorporate dynamic and conflicting agent beliefs? While the belief revision activity in a single agent scenario is concentrated on incorporating new information while preserving consistency, in a multi-agent system it also has to deal with possible conflicts between the agents perspectives. To provide an adequate framework, each agent, built as a combination of an assumption based belief revision system and a cooperation layer, was enriched with additional features: a distributed search control mechanism allowing dynamic context management, and a set of different distributed consistency methodologies. As a result, a Distributed Belief Revision Testbed (DiBeRT) was developed. This paper is a preliminary report presenting some of DiBeRT contributions: a concise representation of external beliefs; a simple and innovative methodology to achieve distributed context management; and a reduced inter-agent data exchange format.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Thesis submitted to Faculdade de Ciências e Tecnologia of Universidade Nova de Lisboa in partial fulfilment of the requirements for the degree of Master in Computer Science

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Este relatório apresenta o trabalho realizado no âmbito da unidade curricular de Dissertação do Mestrado em Engenharia Electrotécnica e de Computadores – área de especialização de Automação e Sistemas. O trabalho realizado consiste no desenvolvimento de um Sistema de Controlo Remoto de Luzes de Aeródromo (SCRLA) que pode ser aplicado em paralelo aos comandos locais de controlo das luzes de aproximação, pista ou circulação, entre outras, de uma infra-estrutura aeroportuária. O objectivo fundamental deste sistema consiste em permitir ao piloto de uma aeronave o acendimento das luzes do aeródromo desde a própria aeronave, recorrendo apenas ao equipamento de rádio VHF existente a bordo da mesma e que é normalmente usado para comunicações com os serviços de controlo de tráfego aéreo. Este sistema, em aeródromos com possível operação nocturna (e.g., heliportos de hospitais), permite uma redução dos custos associados a despesas com eventual pessoal técnico ou a redução da carga de trabalho neste, e uma diminuição do consumo de energia eléctrica, uma vez que as luzes apenas são acendidas quando necessário. Este sistema permite também reduzir a poluição luminosa no ambiente e contribui positivamente para a longevidade dos equipamentos luminosos. No desenvolvimento do sistema, foram adquiridos e/ou aplicados conhecimentos nas áreas de navegação aérea, infra-estruturas aeroportuárias, telecomunicações, normalização e estandardização, electrónicas analógica e digital, programação de baixo nível em microcontroladores, desenho e construção de circuitos impressos, desenho e construção mecânica.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

No âmbito da unidade curricular Dissertação/Estágio/Projeto, foi desenvolvido, durante um estágio na Câmara Municipal do Porto, o estudo da eficiência do sistema inteligente de controlo de tráfego implementado na cidade. Este sistema é designado como Sistema Inteligente de Gestão Autónoma - SIGA e tem como base de funcionamento o software de gestão de tráfego GERTRUDE da empresa GERTRUDE SAEM. O sistema de controlo de tráfego encontra-se repartido em 10 zonas interligadas, focadas essencialmente no centro da cidade do Porto. O estudo foi aplicado apenas a uma parte da zona da Constituição, nomeadamente a rua da Constituição, desde a Praça Marquês até à rua Antero de Quental. A eficiência mediu-se pela comparação de duas situações, a circulação e comportamento das correntes de tráfego com o sistema em funcionamento normal e com o sistema desativado. Por sua vez, o indicador utilizado que permitiu avaliar o sistema, foi o nível de serviço obtido pelo atraso médio por veículo em cada ramo de cada interseção. Para determinação do atraso, foram testados diferentes métodos, para se tentar perceber qual aquele que melhor se adequava à situação e que exigia menor número de recursos humanos. À frente serão exaradas algumas conclusões acerca da metodologia de cada um deles e condicionantes que levaram à não utilização de todos os métodos. Depois de aplicadas as metodologias que permitiram determinar o nível de serviço em cada grupo semafórico das diferentes interseções, percebeu-se que existe uma grande diferença na circulação entre as duas situações, sendo que a mais-valia que este sistema apresenta é a coordenação das diferentes interseções que se encontram abrangidas pelas 10 zonas pertencentes ao SIGA.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

NAV Portugal is the Air Navigation Service Provider in Portugal, providing air traffic control services in the airspace under the country’s responsibility. Recently, the company has been included in an initiative launched by the European Commission, called the Single European Sky. This aims for a unification of the European airspace, improving it in four main pillars: safety, capacity, environment, and cost-efficiency. To each of them, Key Performance Indicators need to be computed and monitored, all having pre-defined targets. The presented work project will be analyzing how NAV Portugal is doing in the pillar of capacity, proving suggestions if needed.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Remote sensing - the acquisition of information about an object or phenomenon without making physical contact with the object - is applied in a multitude of different areas, ranging from agriculture, forestry, cartography, hydrology, geology, meteorology, aerial traffic control, among many others. Regarding agriculture, an example of application of this information is regarding crop detection, to monitor existing crops easily and help in the region’s strategic planning. In any of these areas, there is always an ongoing search for better methods that allow us to obtain better results. For over forty years, the Landsat program has utilized satellites to collect spectral information from Earth’s surface, creating a historical archive unmatched in quality, detail, coverage, and length. The most recent one was launched on February 11, 2013, having a number of improvements regarding its predecessors. This project aims to compare classification methods in Portugal’s Ribatejo region, specifically regarding crop detection. The state of the art algorithms will be used in this region and their performance will be analyzed.