824 resultados para Dam safety
Resumo:
Ramos, D., Arezes, P. M., & Afonso, P. (2015). A systematic approach for externalities in occupational safety through the use of the delphi methodology. Paper presented at the Occupational Safety and Hygiene III - Selected Extended and Revised Contributions from the International Symposium on Safety and Hygiene.
Resumo:
Despite improvements over the years, accidents continue to be a scourge in the construction sector, leading to an increase in the number of journal articles addressing the issue, in an attempt to help construction industry to increase safety performance [1]. This paper aims to, helping construction industry and particulary tunneling community, describe the Portuguese approach to most typical health and safety problems in underground excavations performed with the Sequential Excavation Method (SEM). The article will address various topics, from safety management and organizational practices, to collective and personal protection equipment, to emergency planning. nt problems in safety and health matters are similar to several other countries, the paper will expose a compilation of Portuguese best practices used to solve that problems. This enunciation of best practices describes experience from most important and recognized Project Owners and Contractors in Portugal. In a second phase it will be analysed Portuguese weaknesses, identifying preventive measures, and their comparative importance, that should be adopted in Portugal in order to reduce accidents and health diseases.
Resumo:
This paper analyzes the safety, environmental and occupational health of workers in the small construction industry in Brazil. In this sector there are still many unsafe practices, which are very common in small work sites. We used a qualitative approach to understand these problems by long interviews with people who work directly in small construction sites, including occupational physicians, civil engineers, safety engineers, safety technicians, general foremen, construction workers, labor unionists and auditors. This paper aims to demonstrate that the "invisibility" of the small sites workers makes them less safe and therefore more prone to accidents, also weakening their health. The results show that small constructions workers are less visible to society and supervision because of their short periods of work. Therefore, they are also uncovered to the rigorous applicability of principles of safety and accident prevention. Thus, it has been seen in this field of work a precarious application of NR - 18, which was specifically made for the construction sites and it needs simplification to meet normative characteristics of small construction sites. In the State of Rio de Janeiro, some laws on small sites were recently created and implemented. This study concludes that the rules to work are not being taken as seriously as the legislation determinates, remaining practically unknown by many professionals, from the plot command, supervisors, engineers, architects and technicians who work on construction sites. This ignorance creates space for the lack of safety and consequently to accidents, leading to by weakness in the workers health. Therefore, the work process needs to be modified, the safety regulation must be disseminated through safer practices, promoting employee health and ensure that the work of small sites can be visible, especially ensuring the construction workers health and safety.
Resumo:
This study aims to analyse the relationship between safety climate and the level of risk acceptance, as well as its relationship with workplace safety performance. The sample includes 14 companies and 403 workers. The safety climate assessment was performed by the application of a Safety Climate in Wood Industries questionnaire and safety performance was assessed with a checklist. Judgements about risk acceptance were measured through questionnaires together with four other variables: trust, risk perception, benefit perception and emotion. Safety climate was found to be correlated with workgroup safety performance, and it also plays an important role in workers’ risk acceptance levels. Risk acceptance tends to be lower when safety climate scores of workgroups are high, and subsequently, their safety performance is better. These findings seem to be relevant, as they provide Occupational, Safety and Health practitioners with a better understanding of workers’ risk acceptance levels and of the differences among workgroups.
Resumo:
[Excerpt] This book is the third edition of this series of publications that are entitled “Occupational Safety and Hygiene”. The main contributions for this book were, once again, the works previously submitted and approved to be presented at the annual Symposium of the Portuguese Society of Occupational Safety and Hygiene (SPOSHO), which is celebrating its 11th edition in 2015. The SHO2015—International Symposium on Occupational Safety and Hygiene, similarly to the past seven years, was held in the School of Engineering at University of Minho in Guimarães, Portugal.
Resumo:
Occupational Safety and Hygiene SHO2015 - Proceedings book
Resumo:
Construction of hydroelectric dams in tropical regions has been contributing significantly to forest fragmentation. Alterations at edges of forest fragments impact plant communities that suffer increases in tree damage and dead, and decreases in seedling recruitment. This study aimed to test the core-area model in a fragmented landscape caused by construction of a hydroelectric power plant in the Brazilian Amazon. We studied variations in forest structure between the margin and interiors of 17 islands of 8-100 hectares in the Tucuruí dam reservoir, in two plots (30 and >100m from the margin) per island. Mean tree density, basal area, seedling density and forest cover did not significantly differ between marginal and interior island plots. Also, no significant differences were found in liana density, dead tree or damage for margin and interior plots. The peculiar topographic conditions associated with the matrix habitat and shapes of the island seem to extend edge effects to the islands' centers independently of the island size, giving the interior similar physical microclimatic conditions as at the edges. We propose a protocol for assessing the ecological impacts of edge effects in fragments of natural habitat surrounded by induced (artificial) edges. The protocol involves three steps: (1) identification of focal taxa of particular conservation or management interest, (2) measurement of an "edge function" that describes the response of these taxa to induced edges, and (3) use of a "Core-Area Model" to extrapolate edge function parameters to existing or novel situations.
Resumo:
OBJECTIVE: To establish the normal pattern and safety of echocardiographic contrast in patients with no significant obstruction of epicardial coronary arteries. METHODS: 67 patients with normal coronary arteries or obstructions < 50% were selected from 277 patients who underwent coronary angiography (CA). Mean age was 56 ± 11years and 36 were males. At the end CA, echocardiographic contrast was selectively injected into each coronary artery. The parasternal short axis of the left ventricle (LV) was divided into six segments: anterior (A), antero-lateral (AL), postero-lateral (PL), posterior (P), infero-septal (IS) and antero-septal (AS). Anterolateral (ALPM) and posteromedial papillary muscles (PMPM) were also considered. The pattern and intensity of the appearance of the myocardial contrast was visually analyzed. RESULTS: The right coronary artery (RCA) was dominant in 60 patients. Contrast appearance was sudden and simultaneous in the 3 muscle layers. All segments could be contrasted after the injection in both coronary arteries. 100% of the AS, A and AL segments, 97% of the PL and 98% of the ALPM were perfused by the left coronary artery (LCA). P and IS segments were perfused by the RCA in 85% and 82%, respectively, and by a dominant LCA in 71% of the cases. The PMPM was perfused by a dominant RCA in 77% and by a dominant LCA in 86%. There were no symptoms. CONCLUSION: Intracoronary injection of the sonicated solution is a safe procedure that allows for an excellent opacification of the myocardium and can potentially be used during routine CA.
Resumo:
The evolution of the construction caused a need to use more effective equipments, capable of meeting the increasingly demanding deadlines for the completion of works. In this context, the safety and efficiency of equipment have become key aspects in order to optimize the execution time of the works, as well as reducing labor costs and loss of materials. With the evolution of construction and construction processes, cranes have come to represent a signal of the construction of buildings, revealing to be, in most of the cases, the main equipment of construction sites. Currently, some engineers revels some apprehension regarding the use and handling of cranes which is natural and acceptable, since an equipment failure can lead to serious or fatal accidents. The factors affecting safety management of the cranes in construction sites were investigated, identified, classified and evaluated according to their degree of importance, through interviews with representatives of the general contractors of a set of selected construction sites.
Resumo:
PURPOSE: The authors analyzed the 30-day and 6-month outcomes of 1,126 consecutive patients who underwent coronary stent implantation in 1996 and 1997. METHODS: The 30-day results and 6-month angiographic follow-up were analyzed in patients treated with coronary stents in 1996 and 1997. All patients underwent coronary stenting with high-pressure implantation (>12 atm) and antiplatelet drug regimen (aspirin plus ticlopidine). RESULTS: During the study period, 1,390 coronary stents were implanted in 1,200 vessels of 1,126 patients; 477 patients were treated in the year 1996 and 649 in 1997. The number of percutaneous procedures performed using stents increased significantly in 1997 compared to 1996 (64 % vs 48%, p=0.0001). The 30-day results were similar in both years; the success and stent thrombosis rates were equal (97% and 0.8%, respectively). The occurrence of new Q wave MI (1.3% vs 1.1%, 1996 vs 1997, p=NS), emergency coronary bypass surgery (1% vs 0.6%, 1996 vs 1997, p=NS) and 30-day death rates (0.2% vs 0.5%, 1996 vs 1997, p=NS) were similar. The 6-month restenosis rate was 25% in 1996 and 27% in 1997 (p= NS); the target vessel revascularization rate was 15% in 1996 and 16% in 1997 (p = NS). CONCLUSIONS: Intracoronary stenting showed a high success rate and a low incidence of 30-day occurrence of new major coronary events in both periods, despite the greater angiographic complexity of the patients treated with in 1997. These adverse variables did not have a negative influence at the 6-month clinical and angiographic follow-up, with similar rates of restenosis and ischemia-driven target lesion revascularization rates.
Resumo:
The presence of mycotoxins in foodstuff is a matter of concern for food safety. Mycotoxins are toxic secondary metabolites produced by certain molds, being ochratoxin A (OTA) one of the most relevant. Wines can also be contaminated with these toxicants. Several authors have demonstrated the presence of mycotoxins in wine, especially ochratoxin A (OTA) [1]. Its chemical structure is a dihydro-isocoumarin connected at the 7-carboxy group to a molecule of L--phenylalanine via an amide bond. As these toxicants can never be completely removed from the food chain, many countries have defined levels in food in order to attend health concerns. OTA contamination of wines might be a risk to consumer health, thus requiring treatments to achieve acceptable standards for human consumption [2]. The maximum acceptable level of OTA in wines is 2.0 g/kg according to the Commission regulation No. 1881/2006 [3]. Therefore, the aim of this work was to reduce OTA to safer levels using different fining agents, as well as their impact on white wine physicochemical characteristics. To evaluate their efficiency, 11 commercial fining agents (mineral, synthetic, animal and vegetable proteins) were used to get new approaches on OTA removal from white wine. Trials (including a control without addition of a fining agent) were performed in white wine artificially supplemented with OTA (10 µg/L). OTA analysis were performed after wine fining. Wine was centrifuged at 4000 rpm for 10 min and 1 mL of the supernatant was collected and added of an equal volume of acetonitrile/methanol/acetic acid (78:20:2 v/v/v). Also, the solid fractions obtained after fining, were centrifuged (4000 rpm, 15 min), the resulting supernatant discarded, and the pellet extracted with 1 mL of the above solution and 1 mL of H2O. OTA analysis was performed by HPLC with fluorescence detection according to Abrunhosa and Venâncio [4]. The most effective fining agent in removing OTA (80%) from white wine was a commercial formulation that contains gelatine, bentonite and activated carbon. Removals between 10-30% were obtained with potassium caseinate, yeast cell walls and pea protein. With bentonites, carboxymethylcellulose, polyvinylpolypyrrolidone and chitosan no considerable OTA removal was verified. Following, the effectiveness of seven commercial activated carbons was also evaluated and compared with the commercial formulation that contains gelatine, bentonite and activated carbon. The different activated carbons were applied at the concentration recommended by the manufacturer in order to evaluate their efficiency in reducing OTA levels. Trial and OTA analysis were performed as explained previously. The results showed that in white wine all activated carbons except one reduced 100% of OTA. The commercial formulation that contains gelatine, bentonite and activated carbon (C8) reduced only 73% of OTA concentration. These results may provide useful information for winemakers, namely for the selection of the most appropriate oenological product for OTA removal, reducing wine toxicity and simultaneously enhancing food safety and wine quality.
Resumo:
The prelims comprise: * Half-Title Page * Dedication Page * Title Page * Copyright Page * Table of Contents * Foreword * Acknowledgements * Disclaimer * Introduction
Resumo:
OBJECTIVE: To assess safety and efficacy of coronary angioplasty with stent implantation in unstable coronary syndromes. METHODS: Retrospective analysis of in-hospital and late evolution of 74 patients with unstable coronary syndromes (unstable angina or infarction without elevation of the ST segment) undergoing coronary angioplasty with stent placement. These 74 patients were compared with 31 patients with stable coronary syndromes (stable angina or stable silent ischemia) undergoing the same procedure. RESULTS: No death and no need for revascularization of the culprit artery occurred in the in-hospital phase. The incidences of acute non-Q-wave myocardial infarction were 1.4% and 3.2% (p=0.6) in the unstable and stable coronary syndrome groups, respectively. In the late follow-up (11.2±7.5 months), the incidences of these events combined were 5.7% in the unstable coronary syndrome group and 6.9% (p=0.8) in the stable coronary syndrome group. In the multivariate analysis, the only variable with a tendency to significance as an event predictor was diabetes mellitus (p=0.07; OR=5.2; 95% CI=0.9-29.9). CONCLUSION: The in-hospital and late evolutions of patients with unstable coronary syndrome undergoing angioplasty with intracoronary stent implantation are similar to those of the stable coronary syndrome group, suggesting that this procedure is safe and efficacious when performed in unstable coronary syndrome patients.
Resumo:
Risk management is of paramount importance in the success of tunnelling works and is linked to the tunnelling method and to the constraints of the works. Sequencial Excavation Method (SEM) and Tun-nel Boring Machine (TBM) method have been competing for years. This article, part of a wider study on the influence of the â Safety and Healthâ criterion in the choice of method, reviews the existing literature about the criteria usually employed to choose the tunnelling method and on the criterion â Safety and Healthâ . This crite-rion is particularly important, due to the financial impacts of work accidents and occupational diseases. This article is especially useful to the scientific and technical community, since it synthesizes the relevance of each one of the choice criteria used and it shows why â Safety and Healthâ must be a criterion in the decision mak-ing process to choose the tunnelling method.
Resumo:
OBJECTIVE: To evaluate the efficacy and tolerability of telmisartan, given once a day to patients with mild to moderate hypertension, as well as to assess the 24-hour blood pressure profile with ABPM. METHODS: Initially, 163 patients over 18 were selected, regardless of sex, with blood pressure levels >140/90mmHg at visit 1, which was confirmed at visit 2. One hundred thirty-four patients completed the study. After a 4-week placebo run-in phase, telmisartan 40mg/daily was given for 6 weeks. In those patients whose blood pressure (BP) levels were lower than 140/90mmHg, the same dosage was kept for an additional period of 6 weeks. For those who had BP higher than 140/90mmHg, the dosage was increased to 80mg/daily. Sixty-two patients were included in a subgroup that underwent ABPM 3 different times during the study. RESULTS: In the overall group, blood pressure reduction ranged from 162.3±14.5/101.3±5.75 mmHg (baseline) to 147.3±20.1/90.8±10.9 mmHg (week 12) (p<0.05). Mean blood pressure decreases were 14.4mmHg for systolic BP and 10.3mmHg for diastolic BP, after 12 weeks of active treatment. A subanalysis showed that 47 (35%) patients took telmisartan 40mg throughout the study and 81 (65%) had the dosage increased to 80mg daily. Using ABPM, an 8-mmHg reduction in systolic BP as well as a 5-mmHg reduction in diastolic BP were observed, when compared with baseline values in the final 6 hours (18-24 hours after the last dose of study medication). CONCLUSION: Our results confirm that telmisartan given once a day is effective in reducing blood pressure levels in mild to moderate hypertensive patients. This reduction occurs in a sustained and gradual manner during a 24-hour period confirmed by ABPM.