942 resultados para materials for electric energy distribution networks
Resumo:
Energy resources management can play a very relevant role in future power systems in a SmartGrid context, with intensive penetration of distributed generation and storage systems. This paper deals with the importance of resource management in incident situations. The paper presents DemSi, an energy resources management simulator that has been developed by the authors to simulate electrical distribution networks with high distributed generation penetration, storage in network points and customers with demand response contracts. DemSi is used to undertake simulations for an incident scenario, evidencing the advantages of adequately using flexible contracts, storage, and reserve in order to limit incident consequences.
Resumo:
Distributed generation unlike centralized electrical generation aims to generate electrical energy on small scale as near as possible to load centers, interchanging electric power with the network. This work presents a probabilistic methodology conceived to assist the electric system planning engineers in the selection of the distributed generation location, taking into account the hourly load changes or the daily load cycle. The hourly load centers, for each of the different hourly load scenarios, are calculated deterministically. These location points, properly weighted according to their load magnitude, are used to calculate the best fit probability distribution. This distribution is used to determine the maximum likelihood perimeter of the area where each source distributed generation point should preferably be located by the planning engineers. This takes into account, for example, the availability and the cost of the land lots, which are factors of special relevance in urban areas, as well as several obstacles important for the final selection of the candidates of the distributed generation points. The proposed methodology has been applied to a real case, assuming three different bivariate probability distributions: the Gaussian distribution, a bivariate version of Freund’s exponential distribution and the Weibull probability distribution. The methodology algorithm has been programmed in MATLAB. Results are presented and discussed for the application of the methodology to a realistic case and demonstrate the ability of the proposed methodology for efficiently handling the determination of the best location of the distributed generation and their corresponding distribution networks.
Resumo:
It is important to understand and forecast a typical or a particularly household daily consumption in order to design and size suitable renewable energy systems and energy storage. In this research for Short Term Load Forecasting (STLF) it has been used Artificial Neural Networks (ANN) and, despite the consumption unpredictability, it has been shown the possibility to forecast the electricity consumption of a household with certainty. The ANNs are recognized to be a potential methodology for modeling hourly and daily energy consumption and load forecasting. Input variables such as apartment area, numbers of occupants, electrical appliance consumption and Boolean inputs as hourly meter system were considered. Furthermore, the investigation carried out aims to define an ANN architecture and a training algorithm in order to achieve a robust model to be used in forecasting energy consumption in a typical household. It was observed that a feed-forward ANN and the Levenberg-Marquardt algorithm provided a good performance. For this research it was used a database with consumption records, logged in 93 real households, in Lisbon, Portugal, between February 2000 and July 2001, including both weekdays and weekend. The results show that the ANN approach provides a reliable model for forecasting household electric energy consumption and load profile. © 2014 The Author.
Resumo:
As alterações climáticas e as emissões de CO2 são questões que suscitam a nível internacional e nacional o desenvolvimento de estratégias que atenuem os seus impactes. A Eficiência Energética (EE) é essencial para que num futuro próximo não haja impactes significativos no meio ambiente devido a elevado e ineficiente consumo energético. A União Europeia (UE) e Portugal têm desenvolvido políticas e programas que estimulam a eficiência energética, bem como a diminuição de gases com efeito de estufa (GEE) e a promoção da utilização de fontes de energia renovável. Por outro lado vivemos numa sociedade que passa cerca de 80% do seu tempo em edifícios e, nestes, é consumida 40% da energia mundial. Com uma dependência energética superior a 80%, Portugal tem vindo a apostar, nos últimos anos, em fontes de energia renovável. Esta aposta serve como substituição de fontes, mas não leva directamente à redução de consumos. A redução da factura de energia só pode ser atingida com uma maior eficiência energética e melhores práticas de gestão de energia em edifícios, transportes e industria. Esta dissertação centra-se especificamente num conjunto de edifícios públicos, património municipal da autarquia de Matosinhos, cujo modelo de fornecimento da energia eléctrica é passível de análise crítica no sentido de uma optimização radical ao nível da concepção da rede e exploração, com consequente redução de custos ao nível da facturação. Esta nova metodologia de exploração e gestão de sistemas eléctricos incidirá na criação de um “campus” energético autárquico resultante do novo layout da rede e respectivo fornecimento de energia a partir da rede de distribuição pública. O estudo permitirá fornecer ferramentas fundamentais para a gestão municipal e empresarial ao nível da sustentabilidade energética nos edifícios públicos com abrangência aos serviços empresariais. De referir que a gestão das instalações eléctricas para optimização do desempenho, eficiência e qualidade de energia é aplicável aos 308 municípios nacionais com relevância para as empresas que apresentam consumos significativos nos seus edifícios. Enquanto funcionário da Câmara Municipal de Matosinhos, este município foi uma escolha natural como referência, na análise da relação existente entre a administração local e a gestão da energia. Para ajudar à análise foi efectuado um benchmarketing a cinco edifícios municipais: Edifício dos Paços do Concelho, Biblioteca Municipal Florbela Espanca, Palacete Visconde Trevões, ex-Edifício dos SMAS e Edifício do ex-Tribunal, visando potenciar a correcta gestão de energia destes edifícios por parte das entidades que os gerem, perante novas oportunidades de melhoria e soluções encontradas. Como contributo às metas impostas pela Directiva 2009/28/CE para 2020, a qual prevê uma redução de 20% no consumo final de energia através da eficiência energética, a incorporação de 20% de energia renovável no consumo energético global e a consequente redução em 20% da emissão de GEE, é apresentado um estudo ao nível de um parque fotovoltaico com a componente técnica e económica.
Resumo:
Atualmente o gás natural é a principal fonte de energia utilizada pela maioria dos europeus nos setores doméstico, terciário e industrial. É considerado a alternativa energética do futuro e a mais ecologicamente correta de que podemos dispor, numa escala compatível com as elevadas necessidades energéticas da Humanidade a nível global. Aliado a estes factos, surgem cada vez mais regras de boa prática, normas e legislação, nomeadamente especificações técnicas de forma a regular o setor e dotar as entidades intervenientes na conceção e controlo de uma instalação de rede de gás, de um conhecimento mais detalhado e atualizado sobre esta matéria. Esta dissertação pretende assim contribuir para a melhoria e modernização do desempenho de todos os que exercem funções neste setor, com vista ao aperfeiçoamento da qualidade e utilidade dos seus serviços. Este trabalho reúne o conjunto de informação técnica presente na legislação e normas de forma a preencher a eventual falha do conhecimento neste ramo por parte destes profissionais dotando-os de um conhecimento mais aprofundado, de modo a que possam executar corretamente e de forma eficaz o seu trabalho. Por outro lado, esta dissertação tem como objetivo o projeto e desenvolvimento de uma rede de distribuição de gás natural aplicado a três redes concretas: rede de distribuição, edifício e moradia. A conceção do projeto de instalação de gás inicia-se com a recolha de informação, seguindo-se o desenvolvimento do estudo do traçado. Assim, estão reunidas as condições para dimensionar e providenciar a escolha de materiais mais adequados para a execução da obra. A metodologia de dimensionamento adotada teve por base a equação dos gases perfeitos e a fórmula de Renouard simplificada, encontrando-se implementada numa folha de cálculo. Esta ferramenta de cálculo aliada à metodologia permite realizar de forma expedita o correto dimensionamento de uma rede de gás, bem como apurar se a velocidade de escoamento se encontra em conformidade com o definido no projeto.
Resumo:
The operation of distribution networks has been facing changes with the implementation of smart grids and microgrids, and the increasing use of distributed generation. The specific case of distribution networks that accommodate residential buildings, small commerce, and distributed generation as the case of storage and PV generation lead to the concept of microgrids, in the cases that the network is able to operate in islanding mode. The microgrid operator in this context is able to manage the consumption and generation resources, also including demand response programs, obtaining profits from selling electricity to the main network. The present paper proposes a methodology for the energy resource scheduling considering power flow issues and the energy buying and selling from/to the main network in each bus of the microgrid. The case study uses a real distribution network with 25 bus, residential and commercial consumers, PV generation, and storage.
Resumo:
O transporte ferroviário é um meio de transporte em que o meio de deslocamento ocorre por meio de vias férreas, transportando, entre outros, pessoas e cargas. Este meio de transporte é um dos mais antigos e a sua origem está ligada directamente com a Primeira Revolução Industrial, acontecimento histórico que sucedeu na Europa no final do século XVIII e início do século XIX. Uma rede ferroviária é um sistema único no ponto de vista do uso de tração elétrica assim como no modo que se insere na sociedade por ser um meio de transporte seguro, rápido e bastante utilizado pela população. As redes de alimentação de energia (transporte e distribuição) e a rede de alta velocidade ditaram novas soluções para a alimentação elétrica ferroviária contribuindo para a sua evolução técnica, na segurança e também na compatibilidade eletromagnética no sentido de se estabelecerem critérios de controlo e prevenção dos efeitos indesejáveis provocados pela interferência magnética. O presente trabalho tem por objetivo analisar e estudar tecnicamente como se comportam as redes que alimentam os veículos de tração elétrica desde as subestações até à alimentação das locomotivas. Dada a complexidade da sua análise torna-se necessário o recurso a ferramentas de simulação mais ou menos complexas. No presente trabalho recorreu-se ao MATLABTM, nomeadamente, ao MATLABTM/Simulink. Foram analisadas as principais grandezas elétricas em cenários distintos para os sistemas de alimentação da catenária de 1x25 kV e 2x25 kV.
Resumo:
All over the world, the liberalization of electricity markets, which follows different paradigms, has created new challenges for those involved in this sector. In order to respond to these challenges, electric power systems suffered a significant restructuring in its mode of operation and planning. This restructuring resulted in a considerable increase of the electric sector competitiveness. Particularly, the Ancillary Services (AS) market has been target of constant renovations in its operation mode as it is a targeted market for the trading of services, which have as main objective to ensure the operation of electric power systems with appropriate levels of stability, safety, quality, equity and competitiveness. In this way, with the increasing penetration of distributed energy resources including distributed generation, demand response, storage units and electric vehicles, it is essential to develop new smarter and hierarchical methods of operation of electric power systems. As these resources are mostly connected to the distribution network, it is important to consider the introduction of this kind of resources in AS delivery in order to achieve greater reliability and cost efficiency of electrical power systems operation. The main contribution of this work is the design and development of mechanisms and methodologies of AS market and for energy and AS joint market, considering different management entities of transmission and distribution networks. Several models developed in this work consider the most common AS in the liberalized market environment: Regulation Down; Regulation Up; Spinning Reserve and Non-Spinning Reserve. The presented models consider different rules and ways of operation, such as the division of market by network areas, which allows the congestion management of interconnections between areas; or the ancillary service cascading process, which allows the replacement of AS of superior quality by lower quality of AS, ensuring a better economic performance of the market. A major contribution of this work is the development an innovative methodology of market clearing process to be used in the energy and AS joint market, able to ensure viable and feasible solutions in markets, where there are technical constraints in the transmission network involving its division into areas or regions. The proposed method is based on the determination of Bialek topological factors and considers the contribution of the dispatch for all services of increase of generation (energy, Regulation Up, Spinning and Non-Spinning reserves) in network congestion. The use of Bialek factors in each iteration of the proposed methodology allows limiting the bids in the market while ensuring that the solution is feasible in any context of system operation. Another important contribution of this work is the model of the contribution of distributed energy resources in the ancillary services. In this way, a Virtual Power Player (VPP) is considered in order to aggregate, manage and interact with distributed energy resources. The VPP manages all the agents aggregated, being able to supply AS to the system operator, with the main purpose of participation in electricity market. In order to ensure their participation in the AS, the VPP should have a set of contracts with the agents that include a set of diversified and adapted rules to each kind of distributed resource. All methodologies developed and implemented in this work have been integrated into the MASCEM simulator, which is a simulator based on a multi-agent system that allows to study complex operation of electricity markets. In this way, the developed methodologies allow the simulator to cover more operation contexts of the present and future of the electricity market. In this way, this dissertation offers a huge contribution to the AS market simulation, based on models and mechanisms currently used in several real markets, as well as the introduction of innovative methodologies of market clearing process on the energy and AS joint market. This dissertation presents five case studies; each one consists of multiple scenarios. The first case study illustrates the application of AS market simulation considering several bids of market players. The energy and ancillary services joint market simulation is exposed in the second case study. In the third case study it is developed a comparison between the simulation of the joint market methodology, in which the player bids to the ancillary services is considered by network areas and a reference methodology. The fourth case study presents the simulation of joint market methodology based on Bialek topological distribution factors applied to transmission network with 7 buses managed by a TSO. The last case study presents a joint market model simulation which considers the aggregation of small players to a VPP, as well as complex contracts related to these entities. The case study comprises a distribution network with 33 buses managed by VPP, which comprises several kinds of distributed resources, such as photovoltaic, CHP, fuel cells, wind turbines, biomass, small hydro, municipal solid waste, demand response, and storage units.
Resumo:
A liberalização dos mercados de energia elétrica e a crescente integração dos recursos energéticos distribuídos nas redes de distribuição, nomeadamente as unidades de produção distribuída, os sistemas de controlo de cargas através dos programas de demand response, os sistemas de armazenamento e os veículos elétricos, representaram uma evolução no paradigma de operação e gestão dos sistemas elétricos. Este novo paradigma de operação impõe o desenvolvimento de novas metodologias de gestão e controlo que permitam a integração de todas as novas tecnologias de forma eficiente e sustentável. O principal contributo deste trabalho reside no desenvolvimento de metodologias para a gestão de recursos energéticos no contexto de redes inteligentes, que contemplam três horizontes temporais distintos (24 horas, 1 hora e 5 minutos). As metodologias consideram os escalonamentos anteriores assim como as previsões atualizadas de forma a melhorar o desempenho total do sistema e consequentemente aumentar a rentabilidade dos agentes agregadores. As metodologias propostas foram integradas numa ferramenta de simulação, que servirá de apoio à decisão de uma entidade agregadora designada por virtual power player. Ao nível das metodologias desenvolvidas são propostos três algoritmos de gestão distintos, nomeadamente para a segunda (1 hora) e terceira fase (5 minutos) da ferramenta de gestão, diferenciados pela influência que os períodos antecedentes e seguintes têm no período em escalonamento. Outro aspeto relevante apresentado neste documento é o teste e a validação dos modelos propostos numa plataforma de simulação comercial. Para além das metodologias propostas, a aplicação permitiu validar os modelos dos equipamentos considerados, nomeadamente, ao nível das redes de distribuição e dos recursos energéticos distribuidos. Nesta dissertação são apresentados três casos de estudos, cada um com diferentes cenários referentes a cenários de operação futuros. Estes casos de estudos são importantes para verificar a viabilidade da implementação das metodologias e algoritmos propostos. Adicionalmente são apresentadas comparações das metodologias propostas relativamente aos resultados obtidos, complexidade de gestão em ambiente de simulação para as diferentes fases da ferramenta proposta e os benefícios e inconvenientes no uso da ferramenta proposta.
Resumo:
Scarcity of fuels, changes in environmental policy and in society increased the interest in generating electric energy from renewable energy sources (RES) for a sustainable energy supply in the future. The main problem of RES as solar and wind energy, which represent a main pillar of this transition, is that they cannot supply constant power output. This results inter alia in an increased demand of backup technologies as batteries to assure electricity system safety. The diffusion of energy storage technologies is highly dependent on the energy system and transport transition pathways which might lead to a replacement or reconfiguration of embedded socio-technical practices and regimes (by creating new standards or dominant designs, changing regulations, infrastructure and user patterns). The success of this technology is dependent on hardly predictable future technical advances, actor preferences, development of competing technologies and designs, diverging interests of actors, future cost efficiencies, environmental performance, the evolution of market demand and design and evolution of our society.
Resumo:
This paper focus on the problem of locating single-phase faults in mixed distribution electric systems, with overhead lines and underground cables, using voltage and current measurements at the sending-end and sequence model of the network. Since calculating series impedance for underground cables is not as simple as in the case of overhead lines, the paper proposes a methodology to obtain an estimation of zero-sequence impedance of underground cables starting from previous single-faults occurred in the system, in which an electric arc occurred at the fault location. For this reason, the signal is previously pretreated to eliminate its peaks voltage and the analysis can be done working with a signal as close as a sinus wave as possible
Resumo:
There is no doubt about the necessity of protecting digital communication: Citizens are entrusting their most confidential and sensitive data to digital processing and communication, and so do governments, corporations, and armed forces. Digital communication networks are also an integral component of many critical infrastructures we are seriously depending on in our daily lives. Transportation services, financial services, energy grids, food production and distribution networks are only a few examples of such infrastructures. Protecting digital communication means protecting confidentiality and integrity by encrypting and authenticating its contents. But most digital communication is not secure today. Nevertheless, some of the most ardent problems could be solved with a more stringent use of current cryptographic technologies. Quite surprisingly, a new cryptographic primitive emerges from the ap-plication of quantum mechanics to information and communication theory: Quantum Key Distribution. QKD is difficult to understand, it is complex, technically challenging, and costly-yet it enables two parties to share a secret key for use in any subsequent cryptographic task, with an unprecedented long-term security. It is disputed, whether technically and economically fea-sible applications can be found. Our vision is, that despite technical difficulty and inherent limitations, Quantum Key Distribution has a great potential and fits well with other cryptographic primitives, enabling the development of highly secure new applications and services. In this thesis we take a structured approach to analyze the practical applicability of QKD and display several use cases of different complexity, for which it can be a technology of choice, either because of its unique forward security features, or because of its practicability.
Resumo:
A general and straightforward analytical expression for the defect-state-energy distribution of a-Si:H is obtained through a statistical-mechanical treatment of the hydrogen occupation for different sites. Broadening of available defect energy levels (defect pool) and their charge state, both in electronic equilibrium and nonequilibrium steady-state situations, are considered. The model gives quantitative results that reproduce different defect phenomena, such as the thermally activated spin density, the gap-state dependence on the Fermi level, and the intensity and temperature dependence of light-induced spin density. An interpretation of the Staebler-Wronski effect is proposed, based on the ''conversion'' of shallow charged centers to neutrals near the middle of the gap as a consequence of hydrogen redistribution.
Resumo:
In distributed energy production, permanent magnet synchronous generators (PMSG) are often connected to the grid via frequency converters, such as voltage source line converters. The price of the converter may constitute a large part of the costs of a generating set. Some of the permanent magnet synchronous generators with converters and traditional separately excited synchronous generators couldbe replaced by direct-on-line (DOL) non-controlled PMSGs. Small directly networkconnected generators are likely to have large markets in the area of distributed electric energy generation. Typical prime movers could be windmills, watermills and internal combustion engines. DOL PMSGs could also be applied in island networks, such as ships and oil platforms. Also various back-up power generating systems could be carried out with DOL PMSGs. The benefits would be a lower priceof the generating set and the robustness and easy use of the system. The performance of DOL PMSGs is analyzed. The electricity distribution companies have regulations that constrain the design of the generators being connected to the grid. The general guidelines and recommendations are applied in the analysis. By analyzing the results produced by the simulation model for the permanent magnet machine, the guidelines for efficient damper winding parameters for DOL PMSGs are presented. The simulation model is used to simulate grid connections and load transients. The damper winding parameters are calculated by the finite element method (FEM) and determined from experimental measurements. Three-dimensional finite element analysis (3D FEA) is carried out. The results from the simulation model and 3D FEA are compared with practical measurements from two prototype axial flux permanent magnet generators provided with damper windings. The dimensioning of the damper winding parameters is case specific. The damper winding should be dimensioned based on the moment of inertia of the generating set. It is shown that the damper winding has optimal values to reach synchronous operation in the shortest period of time after transient operation. With optimal dimensioning, interferenceon the grid is minimized.
Resumo:
The goal of the master's thesis is a detailed research of the technical wind energy potential in Russian Federation: the distribution of the potential all over the territory of the country and the possibility of the application of the potential for power supply of various objects. The main attention of the thesis is devoted to the assessment of wind energy resources (potential) of Russian Federation, both for the territory of country in whole and for every region. Theoretical basic wind energy concepts and the scheme of transformation of kinetic energy of a wind into electric energy by modern wind turbines are given in the work. Also the costs of energy, stimuli of development of wind-engineering and obstacles which impact the industry development are analyzed. The review of existent and projected wind power plants in Russia is carried out.