848 resultados para construction management
Resumo:
Understanding the motion characteristics of on-site objects is desirable for the analysis of construction work zones, especially in problems related to safety and productivity studies. This article presents a methodology for rapid object identification and tracking. The proposed methodology contains algorithms for spatial modeling and image matching. A high-frame-rate range sensor was utilized for spatial data acquisition. The experimental results indicated that an occupancy grid spatial modeling algorithm could quickly build a suitable work zone model from the acquired data. The results also showed that an image matching algorithm is able to find the most similar object from a model database and from spatial models obtained from previous scans. It is then possible to use the matched information to successfully identify and track objects.
Resumo:
On obstacle-cluttered construction sites, understanding the motion characteristics of objects is important for anticipating collisions and preventing accidents. This study investigates algorithms for object identification applications that can be used by heavy equipment operators to effectively monitor congested local environment. The proposed framework contains algorithms for three-dimensional spatial modeling and image matching that are based on 3D images scanned by a high-frame rate range sensor. The preliminary results show that an occupancy grid spatial modeling algorithm can successfully build the most pertinent spatial information, and that an image matching algorithm is best able to identify which objects are in the scanned scene.
Resumo:
As computer applications become more available—both technically and economically—construction project managers are increasingly able to access advanced computer tools capable of transforming the role that project managers have typically performed. Competence at using these tools requires a dual commitment in training—from the individual and the firm. Improving the computer skills of project managers can provide construction firms with a competitive advantage to differentiate from others in an increasingly competitive international market. Yet, few published studies have quantified what existing level of competence construction project managers have. Identification of project managers’ existing computer application skills is a necessary first step to developing more directed training to better capture the benefits of computer applications. This paper discusses the yet to be released results of a series of surveys undertaken in Malaysia, Singapore, Indonesia, Australia and the United States through QUT’s School of Construction Management and Property and the M.E. Rinker, Sr. School of Building Construction at the University of Florida. This international survey reviews the use and reported competence in using a series of commercially-available computer applications by construction project managers. The five different country locations of the survey allow cross-national comparisons to be made between project managers undertaking continuing professional development programs. The results highlight a shortfall in the ability of construction project managers to capture potential benefits provided by advanced computer applications and provide directions for targeted industry training programs. This international survey also provides a unique insight to the cross-national usage of advanced computer applications and forms an important step in this ongoing joint review of technology and the construction project manager.
Resumo:
Infrastructure capacity management is the process of ensuring optimal provision of infrastructure assets to support business operations. Effectiveness in this process will enable infrastructure asset owners and its stakeholders to receive full value on their investment. Management research has shown that an organisation can only achieve business value when it has the right capabilities. This paradigm can also be applied to infrastructure capacity management. With competing needs for limited organisation resources, the challenge for infrastructure organisations is to identify and invest their limited resources to develop the right capabilities in the management of their infrastructure capacity. Using a multiple case study approach, the challenges faced in the management of infrastructure asset capacity and the approaches that can be adopted to overcome these challenges were explored. Conceptualising the approaches adopted by the case participants, the findings suggest that infrastructure organisations must strengthen their stakeholder connectivity capability in order to effectively manage the capacity of their infrastructure assets.
Resumo:
Visual recording devices such as video cameras, CCTVs, or webcams have been broadly used to facilitate work progress or safety monitoring on construction sites. Without human intervention, however, both real-time reasoning about captured scenes and interpretation of recorded images are challenging tasks. This article presents an exploratory method for automated object identification using standard video cameras on construction sites. The proposed method supports real-time detection and classification of mobile heavy equipment and workers. The background subtraction algorithm extracts motion pixels from an image sequence, the pixels are then grouped into regions to represent moving objects, and finally the regions are identified as a certain object using classifiers. For evaluating the method, the formulated computer-aided process was implemented on actual construction sites, and promising results were obtained. This article is expected to contribute to future applications of automated monitoring systems of work zone safety or productivity.
Supply chain sustainability : a relationship management approach moderated by culture and commitment
Resumo:
This research explores the nature of relationship management on construction projects in Australia and examines the effects of culture, by means of Schwarz’s value survey, on relationships under different contract strategies. The research was based on the view that the development of a sustainable supply chain depends on the transfer of knowledge and capabilities from the larger players in the supply chain through collaboration brought about by relationship management. The research adopted a triangulated approach in which quantitative data were collected by questionnaire, interviews were conducted to explore and enrich the quantitative data and case studies were undertaken in order to illustrate and validate the findings. The aim was to investigate how values and attitudes enhance or reduce the incorporation of the supply chain into the project. From the research it was found that the degree of match and mismatch between values and contract strategy impacts commitment and the engagement and empowerment of the supply chain.
Resumo:
Community-based activism against proposed construction projects is growing. Many protests are poorly managed and escalate into long-term and sometimes acrimonious disputes which damage communities, firms and the construction industry as a whole. Using a thematic storytelling approach which draws on ethnographic method, within a single case study framework, new insights into the social forces that shape and sustain community-based protest against construction projects are provided. A conceptual model of protest movement continuity is presented which highlights the factors that sustain protest continuity over time. The model illustrates how social contagion leads to common community perceptions of development risk and opportunity, to a positive internalization of collective values and identity, to a strategic utilization of social capital and an awareness of the need to manage the emotional dynamics of protest through mechanisms such as symbolic artefacts.
Resumo:
The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its efficacy on project outcomes. In such circumstances, there is a lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC.
Resumo:
In high-risk industries, companies with well-conceived crisis management plans are at a commercial advantage. While there is some understanding of the risk management practices of construction companies, there is little insight into their crisis preparedness. This paper presents the findings of exploratory research that investigated this issue. Using a diagnostic model of crisis preparedness that has been developed and tested across a broad range of industries, it concludes that if the sample surveyed is typical, then corporate philosophies in construction companies do not support crisis management activities. Furthermore, crisis planning is rudimentary and undertaken in an insular, informal, fragmented fashion, supported by few resources and little strategic guidance. Consequently, many construction companies will have an inadequate understanding of their crisis exposure, of how to cope with crises when they happen, and of how to learn and recover from their aftermath.
Resumo:
Levels of waste within the construction industry need to be reduced for environmental and economic reasons. Changing people's wasteful behaviour can make a significant contribution. This paper describes a research project that used Ajzen's 'theory of planned behaviour' to investigate the attitudinal forces that shape behaviour at the operative level. It concludes that operatives see waste as an inevitable by-product of construction activity. Attitudes towards waste management are not negative, although they are pragmatic and impeded by perceptions of a lack of managerial commitment. Waste management is perceived as a low project priority, and there is an absence of appropriate resources and incentives to support it. A theory of waste behaviour is proposed for the construction industry, and recommendations are made to help managers improve operatives' attitudes towards waste.
Resumo:
In this research we examined, by means of case studies, the mechanisms by which relationships can be managed and by which communication and cooperation can be enhanced in developing sustainable supply chains. The research was predicated on the contention that the development of a sustainable supply chain depends, in part, on the transfer of knowledge and capabilities from the larger players in the supply chain. A sustainable supply chain requires proactive relationship management and the development of an appropriate organisational culture, and trust. By legitimising individuals’ expectations of the type of culture which is appropriate to their company and empowering employees to address mismatches that may occur, a situation can be created whereby the collaborating organisations develop their competences symbiotically and so facilitate a sustainable supply chain. Effective supply chain management enhances organisation performance and competitiveness through the management of operations across organisational boundaries. Relational contracting approaches facilitate the exchange of information and knowledge and build capacity in the supply chain, thus enhancing its sustainability. Relationship management also provides the conditions necessary for the development of collaborative and cooperative relationships However, often subcontractors and suppliers are not empowered to attend project meetings or to have direct communication with project based staff. With this being a common phenomenon in the construction industry, one might ask: what are the barriers to implementation of relationship management through the supply chain? In other words, the problem addressed in this research is the engagement of the supply chain through relationship management.
Resumo:
This paper draws on a major study the authors conducted for the Australian Government in 2009. It focuses on the diffusion issues surrounding the uptake of sustainable building and construction products in Australia. Innovative sustainable products can minimise the environmental impact during construction, while maximising asset performance, durability and re-use. However, there are significant challenges faced by designers and clients in the selection of appropriate sustainable products in consideration of the integrated design solution, including overall energy efficiency, water conservation, maintenance and durability, low-impact use and consumption. The paper is a review of the current state of sustainable energy and material product innovations in Australia. It examines the system dynamics surrounding these innovations as well as the drivers and obstacles to their diffusion throughout the Australian construction industry. The case product types reviewed comprise: solar energy technology, small wind turbines, advanced concrete technology, and warm-mixed asphalt. The conclusions highlight the important role played by Australian governments in facilitating improved adoption rates. This applies to governments in their various roles, but particularly as clients/owners, regulators, and investors in education, training, research and development. In their role as clients/owners, the paper suggests that government can better facilitate innovation within the construction industry by adjusting specification policies to encourage the uptake of sustainable products. In the role as regulators, findings suggest governments should be encouraging the application of innovative finance options and positive end-user incentives to promote sustainable product uptake. Also, further education for project-based firms and the client/end users about the long-term financial and environmental benefits of innovative sustainable products is required. As more of the economy’s resources are diverted away from business-as-usual and into the use of sustainable products, some project-based firms may face short-term financial pain in re-shaping their businesses. Government policy initiatives can encourage firms make the necessary adjustments to improve innovative sustainable product diffusion throughout the industry.
Resumo:
Major construction sites in Australia have an above average presence of ethnic minorities. These groups and the interfaces between them require effective management in order to meet the social imperatives of sustainable design and construction. A survey of 1155 workers and 204 managers on Sydney construction sites respectively, found a significant level of normalisation of negative forms of cross cultural interaction. Yet it was also found that anti-racism programs are not currently a management priority and that they generally lack sophisticated community relations aspects. This paper presents the results of a desk-top study of leading global companies within and outside the construction sector which have won international awards and recognition for their cultural diversity strategies. A key insight is that the companies profiled see diversity as a key resource and as an opportunity rather than a risk which is best harnessed through long-term and on-going commitment of senior management. These leading companies also recognise that cultural diversity strategies operate at three levels - in terms of its relationship with its own workforce; its relationship with its clients and; its relationships with the communities in which it operates - and if properly managed it can be a source of competitive advantage.
Resumo:
Motivation is a major driver of project performance. Despite team member ability to deliver successful project outcomes if they are not positively motivated to pursue joint project goals, then performance will be constrained. One approach to improving the motivation of project organizations is by offering a financial reward for the achievement of set performance standards above a minimum required level. However, little investigation has been undertaken into the features of successful incentive systems as a part of an overall delivery strategy. With input from organizational management literature, and drawing on the literature covering psychological and economic theories of motivation, this paper presents an integrated framework that can be used by project organizations to assess the impact of financial reward systems on motivation in construction projects. The integrated framework offers four motivation indicators which reflect key theoretical concepts across both psychological and economic disciplines. The indicators are: (1) Goal Commitment, (2) Distributive Justice, (3) Procedural Justice, and (4) Reciprocity. The paper also interprets the integrated framework against the results of a successful Australian social infrastructure project case study and identifies key learning’s for project organizations to consider when designing financial reward systems. Case study results suggest that motivation directed towards the achievement of incentive goals is influenced not only by the value placed on the financial reward for commercial benefit, but also driven by the strength of the project initiatives that encourage just and fair dealings, supporting the establishment of trust and positive reciprocal behavior across a project team. The strength of the project relationships was found to be influenced by how attractive the achievement of the goal is to the incentive recipient and how likely they were to push for the achievement of the goal. Interestingly, findings also suggested that contractor motivation is also influenced by the fairness of the performance measurement process and their perception of the trustworthiness and transparency of their client. These findings provide the basis for future research on the impact of financial reward systems on motivation in construction projects. It is anticipated that such research will shed new light on this complex topic and further define how reward systems should be designed to promote project team motivation. Due to the unique nature of construction projects with high levels of task complexity and interdependence, results are expected to vary in comparison to previous studies based on individuals or single-entity organizations.
Resumo:
Social outcomes, in particular intangible social outcomes, are generally difficult to achieve in the construction industry due to the predominantly episodic, fragmented and heavily regulated nature of construction that presupposes a tendency towards mainstream construction processes and design. The Western Australian ‘Percent for Art’ policy is recognized for stimulating social outcomes, by creating richer and more aesthetically pleasing social environments through the incorporation of artwork into public buildings. A case study of four Percent for Art projects highlights the role of the Artwork Selection Committee in incorporating artwork into construction. A total of 20 semi-structured interviews were conducted with committee members and policy officers. Data analysis involved a combination of pattern coding and matrix categorization, and resulted in the identification of the committee’s three key elements of collaborative communication, democratic decision-making and project champions. The findings suggest these key elements foster the interaction, communication and relationships needed to facilitate feedback, enhance relationships, create cross-functional teams and lower project resistance, which are all necessary to overcome constraints to social outcomes in construction. The findings provide greater insight into the mechanisms for achieving social outcomes and a basis for future discussion about the processes for achieving social outcomes in the construction industry.